(Next Meeting: Friday, May 9, 11:30-1 in CIS 101.)
4/25 Meeting summary:
1. General announcements: Flexus stress gage due to ship next
week. CMP post-clean station and spin-etch tool both due in the next few
weeks. Anyone interested in these tools should contact Mary or Ed. Policy
on masks for ASML will be posted soon. ASML 3-D align upgrade was installed,
but another week will be required for testing. Mahnaz will coordinate
with labmembers & ASML for scheduling.
2. LTO: Ed led a discussion about known and recently reported
issues with LTO, summarized here:
- Gary Yama: LTO450 has been faulting out at step 35 for leak check
failure. The two minute step requires and additional 20-35 minutes to
pass.
- Gary Yama: The surface roughness observed last week is similar to
the surface roughness from a deposition in Oct. 2007.
- Duygu: Observed LTO oxide breakdown at <4 Volts for a ~30nm film
deposited and tested in the Nov./Dec. 2007 time frame. Similar films
deposited during the Spring 2007 were tested to 5-6V without breakdown
and had low gate leakage. Duygu also tested films from devices fabricated
by Abijit a few years ago with 60nm LTO oxide which also worked.
- Recommend C-V, I-V and gate leakage testing of the current film. The
recommend process includes:
A) I-Prime Si wafers
B) 40 nm LTO
C) 0.2 micron Al
D) Al wet etch
E) FGA Anneal, time and temperature is not defined.
G) The recommended mask is one out of Prof. Nishi's group.
H) Qain Wang agreed to do full wafer probing, but he wants to see 1,000Ang.
LTO films. He can provide the mask to match their automated prober.
- Concerns over LTO within-wafer and wafer-to-wafer uniformity. Maurice
expects ~10% uniformity across the wafer with ~0.25inch edge exclusion.
I missed what the wafer-to-wafer expectation.
- Raja (LTO300) and Maryam agreed to provide LTO uniformity data.
- By general consinsous, the LTO particles are not a problem (at the
current level) for lab members only interested in using the film as
a cap.
3. Quality Circle update: Brief report from each Circle: good
progress being made in each. Collectively, it is proposed that:
- Our strategy will be to build up a library of documents for each of
the tools and processes in the lab. Our action item to be completed
next Friday will be to agree on a template/table of contents, which
the Quality Circles will work on populating. These will be posted as
they are developed on the SNF server (http://www.stanford.edu/group/snf/QualityCircles)
- To facilitate scheduling of Quality Circles, there is a proposal to
set aside a standard time (Tuesday mornings?) for these meetings.
4. SNF Website/wiki: To great acclaim, Nahid presented his work
with J on developing a wiki-based version (Plone) of the SNF website,
using the Metallization documents as a model. Plone allows a hierarchy
of administrative privileges and version tracking that make it ideal for
most of our website needs. John has a spare machine and will work with
Nahid on setting up a working server for this.
Action items for next meeting:
- Functional area teams: Each team (whose membership is described
below) should meet and do the following:
- Choose one "model" or "test" tool. Staff will
provide equipment and monitor history for the tool, as appropriate.
- Define (if not done already) process qual expectations for this
model tool.
- Map out Coral data collection for this model tool (process qual,
standard run, or custom run)
- Define when process quals should be done (scheduled basis, during
training and/or following equipment repair/maintenance)
- Define superuser responsibilities for this tool (training, process
or equipment troubleshooting, etc., as appropriate)
Functional
Area Quality Circles:
- Litho Area: Aaron (organizer) J., Il Woong, Steve Z., Renata,
Nahid, Maryam (Staff members: Mahnaz, Gary, Mario)
- Etch: Nahid (organizer), Tom, J., Il Woong, Renata, Maryam,
Steve Z., Ray (Staff members: Nancy, Elmer, Mike)
- epi/epi2: Onur & Renata (organizers), Raja (Staff members:
Maurice, Elmer)
- RTA: Raja (organizer), Tom, Serene (Staff members: Ed, Elmer)
- Furnaces: Maryam (organizer), J., Ray, Il Woong, Renata, Raja
(Staff members: Nancy, Maurice, Ted, Ray)
- Metals: J. (organizer) (Staff members: Jeannie, Jim)
Status of action items from
previous weeks:
- ASML/SNF:
- Stuck epi wafers -- Method for testing wafer flatness established
(granite float method) and remanufactured stress gage due to arrive
soon. Gary can now retrieve stuck wafers just short of the e-chuck.
Have not established a method for mounting wafers on carriers.
- STSetch/2:
- STSetch users survey. Done, summary to follow.
- STSetch2 characterization: Ed to present results at a future Grand
Rounds.
- gold-contaminated processing: under discussion -- should this become
an Etch Quality Circle topic?
- Methods for mounting wafers: Cool grease is being evaluated. We've
received info about thermally conductive tape used at UCSB.
|