01:
Shutdown tylanbpsg: Completed
(
(none)
)
02:
Problem tylanbpsg: Uniformity check has not been completed
(
(none)
)
03:
Problem tylanbpsg: Uniformity check completed.
(
(none)
)
04:
Problem tylanbpsg: The process terminated due to high PRCPR
(
(none)
)
05:
Problem tylanbpsg: lab down -- coral will not enable anything
(
(none)
)
06:
Problem Clear tylanbpsg: back up again
(
(none)
)
07:
Problem tylanbpsg: Proc Pressure during deposition (LTO350) continuously rises till > 1000. Then the deposition jumps to step 65 (as expected)
(
(none)
)
08:
Problem Clear tylanbpsg: Removed inlet screen to pump
(
(none)
)
09:
Problem tylanbpsg: Very few non-metal dummies. Had to clean dummies before I could use tube.
(
(none)
)
10:
Problem Clear tylanbpsg: Dummy non metals
(
prisbe.snf.stanford.edu
)
11:
Problem tylanbpsg: Very high leak pressure. Probably due to the PSG deposition prior to my LTO350
(
narya.snf.stanford.edu
)
12:
Problem tylanbpsg: leak?
(
emc.snf.stanford.edu
)
13:
Problem Clear tylanbpsg: cleaned door seal
(
gaul.snf.stanford.edu
)
14:
Problem Clear tylanbpsg: cleaned door seal
(
gaul.snf.stanford.edu
)
15:
Shutdown tylanbpsg: burnbox alarming
(
phimmer.snf.stanford.edu
)
16:
Shutdown Clear tylanbpsg: burnbox alarming
(
prisbe.snf.stanford.edu
)
17:
Shutdown tylanbpsg:
(
mokhberi.snf.stanford.edu
)
18:
Shutdown Clear tylanbpsg: Vacuum pump was low on oil.
(
gaul.snf.stanford.edu
)
19:
Shutdown tylanbpsg: SiH4 gas cylinder change
(
wheeler.snf.stanford.edu
)
20:
Shutdown tylanbpsg: shutdown for cleaning
(
gaul.snf.stanford.edu
)
21:
Shutdown Clear tylanbpsg: Cylinder changed
(
wheeler.snf.stanford.edu
)
22:
Shutdown Clear tylanbpsg: completed
(
gaul.snf.stanford.edu
)
23:
Problem tylanbpsg: "Metal" wand was on the floor, chipped/bent
(
mbartsch.snf.stanford.edu
)
24:
Problem Clear tylanbpsg: Wand replaced.
(
latta.snf.stanford.edu
)
25:
Comment tylanbpsg: Test.
(
latta.snf.stanford.edu
)
26:
Problem tylanbpsg: no deposition psg400
(
phimmer.snf.stanford.edu
)
27:
Problem Clear tylanbpsg: completed
(
gaul.snf.stanford.edu
)
28:
Problem tylanbpsg:
(
sigari.snf.stanford.edu
)
29:
Problem tylanbpsg: Partices on lid
(
amol.snf.stanford.edu
)
30:
Problem Clear tylanbpsg: Normal for the deposition on the tube
(
gaul.snf.stanford.edu
)
31:
Problem Clear tylanbpsg: replaced injectors
(
gaul.snf.stanford.edu
)
32:
Problem tylanbpsg:
(
chcheng.snf.stanford.edu
)
33:
Problem tylanbpsg: Failed leak check
(
yiching.snf.stanford.edu
)
34:
Problem tylanbpsg: LTO450P failed stp45 lk chk twice and it disabled me from CORAL
(
caudillo.snf.stanford.edu
)
35:
Problem Clear tylanbpsg: Cleaned door seal
(
gaul.snf.stanford.edu
)
36:
Problem Clear tylanbpsg: Cleaned door seal
(
gaul.snf.stanford.edu
)
37:
Problem Clear tylanbpsg: Cleaned door seal
(
gaul.snf.stanford.edu
)
38:
Shutdown tylanbpsg: Shutdown for cleaning
(
gaul.snf.stanford.edu
)
39:
Shutdown tylanbpsg: Cleaning completed
(
gaul.snf.stanford.edu
)
40:
Shutdown Clear tylanbpsg: Cleaning completed
(
gaul.snf.stanford.edu
)
41:
Problem tylanbpsg: Boat In/Out steps need to be done manually
(
ejwong.snf.stanford.edu
)
42:
Shutdown Clear tylanbpsg: Cleaning completed
(
gaul.snf.stanford.edu
)
43:
Problem Clear tylanbpsg: fixed
(
gaul.snf.stanford.edu
)
44:
Shutdown Clear tylanbpsg: completed
(
gaul.snf.stanford.edu
)
45:
Shutdown Clear tylanbpsg: completed
(
gaul.snf.stanford.edu
)
46:
Problem tylanbpsg: failed twice in the gross leak check, and pump11 as well
(
sanli.snf.stanford.edu
)
47:
Re: Problem tylanbpsg: failed twice in the gross leak check, and pump11 as well
(
Keith Gaul
)
48:
Problem tylanbpsg: Leak check failed & MFS alarm
(
yiching.snf.stanford.edu
)
49:
Shutdown tylanbpsg: MFS alarm . Unable to pump down.
(
yiching.snf.stanford.edu
)
50:
Shutdown Clear tylanbpsg: replaced t/c sheath
(
gaul.snf.stanford.edu
)
51:
Problem Clear tylanbpsg: replaced t/c sheath
(
gaul.snf.stanford.edu
)
52:
Problem Clear tylanbpsg: replaced t/c/ sheath
(
gaul.snf.stanford.edu
)
53:
Shutdown tylanbpsg: prcpr to high on recipe psg400 8%
(
jgarate.snf.stanford.edu
)
54:
Shutdown Clear tylanbpsg: Removed inlet screen to pump
(
gaul.snf.stanford.edu
)
55:
Problem tylanbpsg: tube very dirty
(
yiching.snf.stanford.edu
)
56:
Problem Clear tylanbpsg: tube not at thickness for standard clean
(
seymour.snf.stanford.edu
)
57:
Shutdown tylanbpsg: Date: Nov 17, 2000 5:08:31 PM
(
utkan.snf.stanford.edu
)
58:
Comment tylanbpsg: starting tube clean
(
seymour.snf.stanford.edu
)
59:
Problem tylanbpsg: BPSG clean
(
seymour.snf.stanford.edu
)
60:
Comment tylanbpsg: bpsg status
(
seymour.snf.stanford.edu
)
61:
Re: Shutdown tylanbpsg 2000-11-17 17:08:29:
(
shott.snf.stanford.edu
)
62:
Re: Problem tylanbpsg 2000-12-08 14:48:26: BPSG clean
(
shott.snf.stanford.edu
)
63:
Problem tylanbpsg 2001-01-22 18:17:16: No deposition
(
anolley.snf.stanford.edu
)
64:
Re: Problem tylanbpsg 2001-01-22 18:17:16: Back up for production
(
jgarate.snf.stanford.edu
)
65:
Comment tylanbpsg 2001-02-02 09:31:40: Silane cylinder change on monday Feb 5
(
seymour.snf.stanford.edu
)
66:
Shutdown tylanbpsg 2001-02-05 06:26:23:
(
seymour.snf.stanford.edu
)
67:
Re: Shutdown tylanbpsg 2001-02-05 06:26:23: Silane cylinder changed
(
seymour.snf.stanford.edu
)
68:
Problem tylanbpsg 2001-02-07 15:36:48: thia pertains to the entire bank: there are no overhead lights. It is REALLY difficult to load wafers in tylanbpsg!
(
beckwith.snf.stanford.edu
)
69:
Re: Problem tylanbpsg 2001-02-07 15:36:48: thia pertains to the entire bank: there are no overhead lights. It is REALLY difficult to load wafers in tylanbpsg!
(
jgarate.snf.stanford.edu
)
70:
Shutdown tylanbpsg 2001-03-05 06:03:48: burnbox clean
(
seymour.snf.stanford.edu
)
71:
Re: Shutdown tylanbpsg 2001-03-05 06:03:48: burnbox clean completed
(
seymour.snf.stanford.edu
)
72:
Problem tylanbpsg 2001-03-08 17:24:01: mos-clean wand
(
lindert.snf.stanford.edu
)
73:
Re: Problem tylanbpsg 2001-03-08 17:24:01: mos-clean wand is ok
(
seymour.snf.stanford.edu
)
74:
Problem tylanbpsg 2001-03-13 11:34:25: Front boat broken
(
latta.snf.stanford.edu
)
75:
Re: Problem tylanbpsg 2001-03-13 11:34:25: Front boat broken
(
Nancy Latta
)
76:
Shutdown tylanbpsg 2001-03-15 07:20:36: burnbox temp low
(
seymour.snf.stanford.edu
)
77:
Re: Shutdown tylanbpsg 2001-03-15 07:20:36: burnbox temp is up tube is up
(
seymour.snf.stanford.edu
)
78:
Re: Problem tylanbpsg 2001-03-13 11:34:25: Front boat replaced
(
seymour.snf.stanford.edu
)
79:
Shutdown tylanbpsg 2001-03-16 08:04:24: quatrtz clean in process
(
seymour.snf.stanford.edu
)
80:
Shutdown tylanbpsg 2001-03-16 08:04:55:
(
seymour.snf.stanford.edu
)
81:
Re: Shutdown tylanbpsg 2001-03-16 08:04:55:
(
seymour.snf.stanford.edu
)
82:
Re: Shutdown tylanbpsg 2001-03-16 08:04:24: quatrtz clean is completed
(
seymour.snf.stanford.edu
)
83:
Shutdown tylanbpsg 2001-03-20 07:48:49: needs to be coated and tested
(
seymour.snf.stanford.edu
)
84:
Re: Shutdown tylanbpsg 2001-03-20 07:48:49: needs to be coated and tested
(
seymour.snf.stanford.edu
)
85:
Shutdown tylanbpsg 2001-03-21 14:26:44: needs characterization
(
seymour.snf.stanford.edu
)
86:
Re: Shutdown tylanbpsg 2001-03-21 14:26:44: needs characterization
(
latta.snf.stanford.edu
)
87:
Shutdown tylanbpsg 2001-03-30 01:52:29: one boat broken
(
yangxu.snf.stanford.edu
)
88:
Re: Shutdown tylanbpsg 2001-03-30 01:52:29: one boat broken
(
shott.snf.stanford.edu
)
89:
Problem tylanbpsg 2001-03-31 08:37:54: Caution ...
(
shott.snf.stanford.edu
)
90:
Shutdown tylanbpsg 2001-04-02 07:10:49: burnbox clean
(
seymour.snf.stanford.edu
)
91:
Comment tylanbpsg 2001-04-02 08:02:14: Burnbox
(
mdickey.snf.stanford.edu
)
92:
Re: Problem tylanbpsg 2001-03-31 08:37:54: Caution ...Burnbox clean completed
(
mdickey.snf.stanford.edu
)
93:
Re: Shutdown tylanbpsg 2001-04-02 07:10:49: burnbox clean completed
(
mdickey.snf.stanford.edu
)
94:
Shutdown tylanbpsg 2001-04-16 07:06:01: burnbox clean
(
seymour.snf.stanford.edu
)
95:
Re: Shutdown tylanbpsg 2001-04-16 07:06:01: burnbox clean
(
seymour.snf.stanford.edu
)
96:
Shutdown tylanbpsg 2001-04-24 09:11:10: shutdown for cleaning
(
gsarmien.snf.stanford.edu
)
97:
Re: Shutdown tylanbpsg 2001-04-24 09:11:10: shutdown for cleaning
(
seymour.snf.stanford.edu
)
98:
Shutdown tylanbpsg 2001-04-26 09:41:12: needs characterization
(
seymour.snf.stanford.edu
)
99:
Problem tylanbpsg 2001-04-26 18:05:36: Boat did not pull out at the end of LTO400
(
latta.snf.stanford.edu
)
[<<-]
[<-]
[->]
[->>]
|