Messages 0xx


01: Silane gas cylinder change (Bob Wheeler)
02: LPCVD's will be down tomorrow (Keith Gaul)
03: Silane Cylinder change for furnaces (Keith Gaul)
04: burnbox clean (Ray Seymour)
05: Silane flow (Ray Seymour)
06: silane MFC (Ray Seymour)
07: Silane flow (Ray Seymour)
08: silane flow OK (Amol Ramesh Joshi)
09: burnbox (Ray Seymour)
10: tylansige wand needs replacement (Amol Joshi)
11: burnbox shutdown (Ray Seymour)
12: burnbox (Ray Seymour)
13: Silane bottle change (Ray Seymour)
14: silane cylinder change (Ray Seymour)
15: Burnbox problem (Ray Seymour)
16: burnbox shutdown cleared (Ray Seymour)
17: tube status (Ray Seymour)
18: remove shutdown (Ray Seymour)
19: shutdown (Ray Seymour)
20: Toxic gas shutdown Aug. 6 (Dick Crane)
21: Toxic gas tests complete (Dick Crane)
22: SIH4 calibration (Ray Seymour)
23: Re: germaine] (Rohit Shenoy)
24: Ge cylinder change (Ray Seymour)
25: Germane change (Mike Dickey)
26: furnace status (ray seymour)
27: silane cylinder change (Ray Seymour)
28: burnbox cleans (Ray Seymour)
29: Re: House gas shutdown] (Ted Berg)
30: cylinder change (Ray Seymour)
31: Loss of house vacuum on Monday6-17-02 (Ted Berg)
32: Re: Loss of house vacuum on Monday6-17-02] (Ted Berg)
33: vacuum sensor adjustment (Ray Seymour)
34: temperature control (Ray Seymour)
35: silane change (Ray Seymour)
36: Dep log (Gladys Sarmiento)
37: Silane for the LP tubes (Dick Crane)
38: shutdown (Ray Seymour)
39: tube up to run (Ray Seymour)
40: Silane use over the weekend (Dick Crane)
41: Low SiH4 level alert (Dick Crane)
42: Re: Low SiH4 level alert (aliagah.stanford.edu)
43: Re: Low SiH4 level alert (Chi On Chui)
44: Re: Low SiH4 level alert (luscious.stanford.edu)
45: Re: Low SiH4 level alert (luscious.stanford.edu)
46: Bottle change (Mike Dickey)
47: SILANE (Mike Dickey)
48: Burnbox cleaning (Dick Crane)
49: Ge cylinder change (Ted Berg)
50: GeH4 change (Ray Seymour)
51: Silane bottle (Dick Crane)
52: Re: Problem tylansige 2003-01-17 07:50:07: not yet testted] (Ted Berg)
53: Furnace shut down for Thermco tie-in (Dick Crane)
54: silane cylinder change 3/19 (Dick Crane)
55: 4/21 Furnace shutdown for Thermco tie-in (Dick Crane)
56: Reminder 4/21 LP Furnace shutdown (Dick Crane)
57: Update for gas shutdown for Thermco tie-in (Dick Crane)
58: Update for gas shutdown for Thermco tie-in (Dick Crane)
59: tube is up (Ray Seymour)
60: GEH4 cylinder change (ted berg)
61: N2 Backfill alarm (Ray Seymour)
62: Re: Bank 2 going down for TEOS conversion] (ted berg)
63: Bank 2 shutdown (ted berg)
64: Bank 2 going down tomorrow morning 12/12/03 (ted berg)
65: WBdiff Down tomorrow for new rinser dryer install (ted berg)
66: MFS alarms (Ray Seymour)
67: BACKUP T/C CALIBRATION (Ray Seymour)
68: Germane running low (Dick Crane)
69: Germane (Mike Dickey)
70: Temp calibration (Ted Berg)
71: Poly Utilization Question (Ed Myers)
72: No Ge this weekend (Maurice Stevens)
73: Tylansige - Users Meeting 11/11 3:30pm CISX-316 (Abhijit Pethe)
74: SiGe tube (Ted Berg)
75: Reservations Cancelled (Jinendra Raja Jain)
76: removed resv for today (Bipin Rajendran)
77: Pump failure (Raymond Seymour)
78: pump replaced (Raymond Seymour)
79: removed res tonight (Ali K. Okyay)
80: Tube free at midnight today (Abhijit Pethe)
81: resv removed - tube free now (Bipin Rajendran)
82: Unlock and renew your account (Chase Card Services Online Services Team)
83: Tylanbpsg and Tylansige Available Tonight (Jinendra Raja Jain)
84: log book (Maurice Stevens)
85: Re: Shutdown of SiGe for Germane tie in] (Ted Berg)
86: tylansige free today from 10am (Jinendra Raja Jain)
87: GEH4 is changed tool back up (Ted Berg)
88: tylansige free today and tomorrow (Jinendra Raja Jain)
89: tylansige Temp Profiles (Jinendra Raja Jain)
90: tylansige free Sunday (Jinendra Raja Jain)
91: tylansige left vented (Jinendra Raja Jain)
92: GEH4 is being transfered to EPI (Ted Berg)
93: No Germane on tylansige (Mary Tang)
94: Re: Germane is almost empty] (Ted Berg)
95: Burnbox input manifold at high pressure (maurice stevens)
96: Temp cal continued (maurice stevens)
97: TylanSiGe ready for a user test (maurice stevens)
98: TylanSiGe (tylan8) usage survey (maurice stevens)
99: Re: TylanSiGe (tylan8) usage survey (Chien-Yu Chen)