Good morning All.... Here is the morning Litho status report. Please check back in Coral for the latest tool updates and current equipment status. Thanks.... The Litho Team Photolithography Quick Snapshot Monday, November 12, 2012 New Issues None over the Weekend- Old Issues- Ongoing YES Oven- Intermittent pumpdown problem. Fails to achieve setpoint. leakcheck on 9/28). Identified a leak in the chamber( rear/lower right corner). Making plans to have chamber repaired over the annual Stanford shutdown at the end of the year. KSCoat -Problem: Robot wafer pickup at load station. OK to process 4" wafers. Still need to check 3", 5" 6" and 8" wafer sized and re-teach as needed. KS Coat- Problem: User "lindaohara" reports a coolant water flow problem. Investigated and found the water pump to be bad. Motor is OK. Water pump replaced on 11/2. Good water flow. Cannot reach setpoint of 21 degrees C.. Suspect bad chiller. Will investigate further. Resolved Issues ASML Stepper- Shutdown: Room temperature at stepper location was 24.8 deg.C. On Wednesday. Facilities corrected problem with temperature. Stepper not stable til Friday(11/9)am. Focus checked and adjusted. Daily qual performed-OK. Tool released Friday @ 5:30pm Photolithography Area Status Monday, November 12, 2012 General Information / Lab Activities Mahnaz - Vacation(10/29 - 11/13) Exposure Tools Status Comments Priority ASML Stepper UP EVAlign PROBLEM Intermittent joystick problem 4 EVAlign2 UP EVG-Imprint PROBLEM Tool idle til needed Karl Suss 1 UP Karl Suss 2 UP Manual Coaters Status EVGSpraycoat UP Headway UP Laurel UP Coaters Process Status SVGCoat 3612 Process Up 220-3 Process Up 220-7 Process Up SVGCoat2 3612 Process Up 3617 Process Up 955-0.7 Process Up Developers Status SVGDEV UP SVGDEV2 UP Ovens / Hotplates Status BLUEM UP Blue M 90 C. UP Blue M 110 C UP Blue M 150 C UP Fusion UP UV-Cure UP White-Oven UP YES Vapor Prime PROBLEM Intermittent vacuum problem 1 Hotplates- Laurel-left UP Laurel- right UP Wenesco- Left UP 90 Deg C UP 115 Deg C UP Wenesco- Right UP Metrology/Inspection Status AFM UP Alpha-Step 500 UP Flexus Stresstest UP Nanospec 1-Etch UP Nanospec 2-Litho UP Prometrix UP P2 Profiler UP Rudolph Ellipsometer UP Surfscan 4500 UP Woolam UP Zygo UP Microscpoes- #1 Leica/ UP #2 Ergolux/Drytek2 UP #3 Olympus/Litho UP #4 Nikon Optiphot/Litho UP #5 Nikon/Litho UP #6 Leitz/Bosch UP #7 Leitz/Diffusion UP #8 Olympus/Litho UP #9Olympus/Litho UP Miscellaneous Status EVBond PROBLEM Clamps are stiff 2 KSBonder UP KSCoat PROBLEM Coolant flow problem 3 Litho SRD UP Mask Cleaner UP
|
Monday, November 12, 2012 |
||||
|
New Issues |
|
|
|
|
|
None over the Weekend- |
||||
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
Old Issues- Ongoing |
|
|||
|
YES Oven- Intermittent pumpdown problem. Fails to achieve setpoint. leakcheck |
||||
|
on 9/28). Identified a leak in the chamber( rear/lower right corner). Making plans to have |
||||
|
chamber repaired over the annual Stanford shutdown at the end of the year. |
||||
|
|
||||
|
KSCoat-Problem: Robot wafer pickup at load station. OK to process 4" wafers. Still need |
||||
|
to check 3", 5" 6" and 8" wafer sized and re-teach as needed. |
||||
|
|
||||
|
KS Coat- Problem: User "lindaohara" reports a coolant water flow problem. Investigated |
||||
|
and found the water pump to be bad. Motor is OK. Water pump replaced on 11/2. Good water |
||||
|
flow. Cannot reach setpoint of 21 degrees C.. Suspect bad chiller. Will investigate further. |
||||
|
|
||||
|
|
|
|||
|
Resolved Issues |
|
|
|
|
|
ASML Stepper- Shutdown: Room temperature at stepper location was 24.8 deg.C. On Wednesday. |
||||
|
Facilities corrected problem with temperature. Stepper not stable til Friday(11/9)am. Focus |
||||
|
checked and adjusted. Daily qual performed-OK. Tool released Friday @ 5:30pm |
|
|||
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
Photolithography Area Status |
Monday, November 12, 2012 |
|||
|
General Information / Lab Activities |
|
|
|
|
|
Mahnaz- Vacation(10/29 - 11/13) |
||||
|
|
||||
|
|
||||
|
|
||||
|
|
||||
|
Exposure Tools |
Status |
Comments |
Priority |
|
|
ASML Stepper |
UP |
|
|
|
|
EVAlign |
PROBLEM |
Intermittent joystick problem |
4 |
|
|
EVAlign2 |
UP |
|
|
|
|
EVG-Imprint |
PROBLEM |
Tool idle til needed |
|
|
|
Karl Suss 1 |
UP |
|
|
|
|
Karl Suss 2 |
UP |
|
|
|
|
Manual Coaters |
Status |
|
|
|
|
EVGSpraycoat |
UP |
|
|
|
|
Headway |
UP |
|
|
|
|
Laurel |
UP |
|
|
|
|
Coaters |
Process Status |
|
|
|
|
SVGCoat |
3612 Process |
Up |
|
|
|
220-3 Process |
Up |
|
|
|
|
220-7 Process |
Up |
|
|
|
|
SVGCoat2 |
3612 Process |
Up |
|
|
|
3617 Process |
Up |
|
|
|
|
955-0.7 Process |
Up |
|
|
|
|
Developers |
Status |
|
|
|
|
SVGDEV |
UP |
|
|
|
|
SVGDEV2 |
UP |
|
|
|
|
Ovens / Hotplates |
Status |
|
|
|
|
BLUEM |
UP |
|
|
|
|
Blue M 90 C. |
UP |
|
|
|
|
Blue M 110 C |
UP |
|
|
|
|
Blue M 150 C |
UP |
|
|
|
|
Fusion |
UP |
|
|
|
|
UV-Cure |
UP |
|
|
|
|
White-Oven |
UP |
|
|
|
|
YES Vapor Prime |
PROBLEM |
Intermittent vacuum problem |
1 |
|
|
Hotplates- |
|
|
|
|
|
Laurel-left |
UP |
|
|
|
|
Laurel- right |
UP |
|
|
|
|
Wenesco- Left |
UP |
|
|
|
|
90 Deg C |
UP |
|
|
|
|
115 Deg C |
UP |
|
|
|
|
Wenesco- Right |
UP |
|
|
|
|
Metrology/Inspection |
Status |
|
|
|
|
AFM |
UP |
|
|
|
|
Alpha-Step 500 |
UP |
|
|
|
|
Flexus Stresstest |
UP |
|
|
|
|
Nanospec 1-Etch |
UP |
|
|
|
|
Nanospec 2-Litho |
UP |
|
|
|
|
Prometrix |
UP |
|
|
|
|
P2 Profiler |
UP |
|
|
|
|
Rudolph Ellipsometer |
UP |
|
|
|
|
Surfscan 4500 |
UP |
|
|
|
|
Woolam |
UP |
|
|
|
|
Zygo |
UP |
|
|
|
|
Microscpoes- |
|
|
|
|
|
#1 Leica/ |
UP |
|
|
|
|
#2 Ergolux/Drytek2 |
UP |
|
|
|
|
#3 Olympus/Litho |
UP |
|
|
|
|
#4 Nikon Optiphot/Litho |
UP |
|
|
|
|
#5 Nikon/Litho |
UP |
|
|
|
|
#6 Leitz/Bosch |
UP |
|
|
|
|
#7 Leitz/Diffusion |
UP |
|
|
|
|
#8 Olympus/Litho |
UP |
|
|
|
|
#9Olympus/Litho |
UP |
|
|
|
|
Miscellaneous |
Status |
|
|
|
|
EVBond |
PROBLEM |
Clamps are stiff |
2 |
|
|
KSBonder |
UP |
|
|
|
|
KSCoat |
PROBLEM |
Coolant flow problem |
3 |
|
|
Litho SRD |
UP |
|
|
|
|
Mask Cleaner |
UP |
|
|
|
|
|
|
|
|
|