[<<-]
[<-]
[->]
[->>]
[Messages by date]
[SNF Home]
[SNF Archive Home]
[Subscribe To List]
[List FAQ]
Threads for February 2005
February 2005
[1] raith:16:00-23:00 is free
[1] RAITH STATUS AND notice of change in Limitations of Acceleration Voltage: No Operation above 20 kV.
[1] Raith Free until 7:30pm
[1] raith free. sample not ready. sorry
[1] cancel my reservation
[1] ZEP -520 A in anisole in the lab refrigerator: Note two viscousities
[1] Spinning 5% 495K MW PMMA With anisole today. 'Come and take a spin with me...'
[1] res cancle Thursday 6:00-10:00 pm
[1] res cancle: 2:00pm-6:00 pm Saturday
[1] Re: Raith: stage stuck in limbo
[1] Re: Problem raith SNF 2005-02-15 02:38:08: stage stuck in loadlock procedure]
[2] Re: Problem raith SNF 2005-02-08 09:39:24: Reports of increased scattering or leakage when blanked]
[1] Raith reservation removed Wed 2/16 8pm-12am
[1] Re: Problem raith SNF 2005-02-15 13:44:11: Elevated Gun pressures observed today BAKE YOUR RESIST TO SPECIFIED PROCESS TEMPS!
[2] Re: non-omogeneous PMMA?
[1] Re: Problem raith SNF 2005-02-15 13:44:11: Elevated Gun pressures observed today]
[1] Raith available midnight-4am TONIGHT
[2] Re: Dosing PMMA on a Cr layer
[2] Re: Problem raith SNF 2005-02-15 17:24:20: 20 um aperture scatter when blanked is above spec.]
[1] res removed 2:00-6:00 pm Saturday
[1] Raith Free from now to 2am
[1] Res cancelled 1000-1400 Monday
[1] Raith Free, Tues. 7am-11am
[1] Process for Oxygen Descum of PMMA
[1] e-beam lithography presentation
[1] Unidentified syringe in the lab
[1] NEW THREAD: 2% 950K MW PMMA -A (in Anisole solvent) data.
[1] Raith free from now to 12:00am
[1] raith available now
[1] Problem raith SNF 2005-02-27 01:17:12: EHT trip this afternoon: system back up at 0114
[<<-]
[<-]
[->]
[->>]
[Messages by date]
[SNF Home]
[SNF Archive Home]
[Subscribe To List]
[List FAQ]