Subject: Raith ready for next user
From: Ryan Tu <ryantu@stanford.edu>
Date: Fri, 8 Sep 2006 11:32:04 -0700

Dear All,

Not a full qualification, but the system seems to be performing normally.  I
have tested the beam at only 10kV with 10um and 30um apertures.  Stage is
now unloaded for the next available user.  Thanks to Dick Crane for helping
bring the system back up.