Threads for September 2006
September 2006
[1] Re: Problem raith SNF 2006-08-26 11:00:34: Beam current measurement
[2] Re: Shutdown raith SNF 2006-09-06 15:30:25: power off
[1] Re: Comment raith SNF 2006-07-28 11:18:11: 30 kV test completed Users can use any ACCELERATION Voltage 0.3 to 30 KV
[2] Re: Comment raith SNF 2006-09-07 15:20:04: System on and stabilizing
[2] Re: Problem raith SNF 2006-09-08 08:16:59: Needs superuser checkout
[2] Re: Shutdown raith SNF 2006-09-08 16:37:43: sample can't be unloaded
[2] Re: Problem raith SNF 2006-09-11 11:02:12: system check out in progress .. coral schedule resumes this afternoon.
[1] Comment raith SNF 2006-09-12 17:41:12: Users requested to report their EBL results to raith@snf.stanford.edu
[1] Comment raith SNF 2006-09-13 17:34:21: excellent stitching and resolution on qualification test 9112006
[1] Comment raith SNF 2006-09-15 10:25:03: 120 um Gun alignment out of specification.
[2] Re: Problem raith SNF 2006-09-19 09:29:10: Raith right PC
[1] Shutdown raith SNF 2006-09-19 14:56:25: cooling water issues causing Gun trips
[1] Shutdown raith SNF 2006-09-19 15:55:35: elevated gun pressures after water flow failure
[2] Re: Problem raith SNF 2006-09-19 12:20:06: transient signals to Column Chamber Valve and problems measuring pico ammeter
[1] Shutdown raith SNF 2006-09-19 16:06:22: RAITH System off line for BAKE OUT OF GUN
[<<-]
[<-]
[->]
[->>]