Subject: Re: Shutdown raith SNF 2012-10-11 13:02:34: I/O trip
From: jwc@snf.stanford.edu

water cooling shut down due to low level water in Hascres chiller.
checked for leaks and found none, possibly increased evaporation rate from basement
ventilation changes...
resume pump and ebeam control package and am bringing FE-Gun back on line slowly.
Should be ready for users after 4:30 to 5 PM.
Call me if you have questions.
James