Subject: Re: Problem raith SNF 2008-11-17 18:27:41: system under qualification
From: jwc@snf.stanford.edu
Date: Tue, 18 Nov 2008 08:52:20 -0800

system [passed qualification with excellent stitching and resolution on the USH sample
holder with leveling the piezo post.
wafer subnitted for metal deposition and lift off before adding level two structures
to test overlay and stitching
happy happy, let the queue resume.
JWC