Subject: Shutdown evbond 2002-02-19 15:47:31: PM - per Mahnaz's instruction.
From: dton@snf.stanford.edu
Date: Feb 19, 2002 3:47:33 PM

Shutdown system per Mahnaz's instruction.  
Mike needs to requalify the system before next user.
Renee was having problem with anodic bonding -
some short when voltage applied (a lot of current
flow w/out much voltage).
Dinh