From amol at snf.stanford.edu Wed Apr 4 09:42:23 2001 From: amol at snf.stanford.edu (amol at snf.stanford.edu) Date: Apr 4, 2001 9:42:23 AM Subject: Shutdown amtetcher 2001-04-04 09:42:22: Hexode jog not working. Bell jar stuck. Message-ID: Hexode jog not working. Bell jar is stuck in up position. From booth at snf.stanford.edu Wed Apr 4 10:43:37 2001 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Apr 4, 2001 10:43:37 AM Subject: Shutdown amtetcher 2001-04-04 09:42:22: Hexode jog not working. Bell jar stuck. Message-ID: closed bell jar & put system in pump&hold. From mbadi at snf.stanford.edu Wed Apr 18 07:51:36 2001 From: mbadi at snf.stanford.edu (mbadi at snf.stanford.edu) Date: Apr 18, 2001 7:51:36 AM Subject: Problem amtetcher 2001-04-18 07:51:34: Program 25 has been overwritten -- it is now the same as program 3. Message-ID: From gilbert at snf.stanford.edu Thu Apr 19 09:30:43 2001 From: gilbert at snf.stanford.edu (gilbert at snf.stanford.edu) Date: Apr 19, 2001 9:30:43 AM Subject: Shutdown amtetcher 2001-04-19 09:30:42: arcing on seasoning run Message-ID: Program #3 (oxide etch). Electrode facing window -> bottom wafer -> top right corner Consistent flashing seemed to be coming from the gap between the plates. Flashing occured approximately every 5-10 seconds. From latta at snf.stanford.edu Thu Apr 19 09:41:39 2001 From: latta at snf.stanford.edu (latta at snf.stanford.edu) Date: Apr 19, 2001 9:41:39 AM Subject: Shutdown amtetcher 2001-04-19 09:30:42: arcing on seasoning run Message-ID: Just flashing, not to worry. From booth at snf.stanford.edu Fri Apr 20 01:38:58 2001 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Apr 20, 2001 1:38:58 PM Subject: Problem amtetcher 2001-04-18 07:51:34: Program 25 has been overwritten -- it is now the same as program 3. Message-ID: Program #25 is in memory now. From booth at snf.stanford.edu Mon Apr 23 07:12:38 2001 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Apr 23, 2001 7:12:38 AM Subject: Problem amtetcher 2001-04-23 07:12:37: Cryo regen is needed. Message-ID: From booth at snf.stanford.edu Mon Apr 23 11:21:56 2001 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Apr 23, 2001 11:21:56 AM Subject: Problem amtetcher 2001-04-23 07:12:37: Cryo regen is needed. Message-ID: cleared Cryo regen completed. From suzanne at snf.stanford.edu Tue Apr 24 12:20:32 2001 From: suzanne at snf.stanford.edu (suzanne at snf.stanford.edu) Date: Apr 24, 2001 12:20:32 PM Subject: Shutdown amtetcher 2001-04-24 12:20:28: Panel 2 latch Message-ID: Panel 2 latch is not flush..Tray feels tight now that I re-did it... From booth at snf.stanford.edu Tue Apr 24 02:48:59 2001 From: booth at snf.stanford.edu (booth at snf.stanford.edu) Date: Apr 24, 2001 2:48:59 PM Subject: Shutdown amtetcher 2001-04-24 12:20:28: Panel 2 latch Message-ID: could not see anything wrong with latch. It holds the tray tight, & latch is within 1mm of top of Hex.