Shutdown amtetcher SNF 2011-01-18 18:08:57: AMT power failure

eenriquez at eenriquez at
Wed Jan 19 12:16:54 PST 2011

Adjusted the bell jar lift brakes.  Reentered all system parameters and reprogrammed recipes 2 and 3.  Need to enter progaramming for all other recipes.  Chamber leak rate is 2 mT/min.  Cycled the bell jar up and down several times with no problems.  Ran standby recipes