From mahnaz at snf.stanford.edu Thu Jun 14 09:06:22 2007 From: mahnaz at snf.stanford.edu (mahnaz at snf.stanford.edu) Date: Thu, 14 Jun 2007 09:06:22 -0700 Subject: Comment asml SNF 2007-06-14 09:06:21: mario and I need to be shown how to refil Message-ID: water From rissman at snf.stanford.edu Mon Jun 18 08:46:28 2007 From: rissman at snf.stanford.edu (rissman at snf.stanford.edu) Date: Mon, 18 Jun 2007 08:46:28 -0700 Subject: Problem asml SNF 2007-03-23 09:54:34: system is in set up Message-ID: System ran first wafers for users on 6/15. From mahnaz at snf.stanford.edu Thu Jun 21 10:18:54 2007 From: mahnaz at snf.stanford.edu (mahnaz at snf.stanford.edu) Date: Thu, 21 Jun 2007 10:18:54 -0700 Subject: Problem asml SNF 2007-06-21 10:18:54: calibration Message-ID: during conversion and calibration failed (carrier height take overcal failed due to optical light lever too low), called FSE, waiting for response From mahnaz at snf.stanford.edu Thu Jun 21 10:21:07 2007 From: mahnaz at snf.stanford.edu (mahnaz at snf.stanford.edu) Date: Thu, 21 Jun 2007 10:21:07 -0700 Subject: Shutdown asml SNF 2007-06-21 10:21:07: Message-ID: during conversion and calibration failed (carrier height take overcal failed due to optical light lever too low), called FSE, waiting for response From mahnaz at snf.stanford.edu Thu Jun 21 16:23:42 2007 From: mahnaz at snf.stanford.edu (mahnaz at snf.stanford.edu) Date: Thu, 21 Jun 2007 16:23:42 -0700 Subject: Problem asml SNF 2007-06-21 10:18:54: calibration Message-ID: Alex FSE adjusted the laser for wafer detection for indexer and performed caliberation. Other tests still needs to be performed. From mahnaz at snf.stanford.edu Thu Jun 21 16:24:18 2007 From: mahnaz at snf.stanford.edu (mahnaz at snf.stanford.edu) Date: Thu, 21 Jun 2007 16:24:18 -0700 Subject: Shutdown asml SNF 2007-06-21 10:21:07: Message-ID: Alex FSE adjusted the laser for wafer detection for indexer and performed caliberation. Other tests still needs to be performed. From mahnaz at snf.stanford.edu Fri Jun 22 13:28:20 2007 From: mahnaz at snf.stanford.edu (mahnaz at snf.stanford.edu) Date: Fri, 22 Jun 2007 13:28:20 -0700 Subject: Problem asml SNF 2007-06-22 13:28:20: chilled water and compressed air Message-ID: Was lost last night for a period of say 1 hour. Lamp was shut down, Cd unit was off and focus has drifted. As of right now the unit would be ready around 2 pm. Binder and Michael were here to help.