Shutdown asml SNF 2008-02-27 16:46:25: a wafer lost in p-chuck

gsosa at gsosa at
Thu Feb 28 08:22:06 PST 2008

Removed users wafer from the P-chuck. Cleaned the P-chuck and robot arm. tested transfer with 8 dummy wafers. all OK. Users quartz wafer tested on UTS granite. Wafer did not float. Suspect bowed or warped wafer. Did daily checks. All OK.

More information about the asml-pcs mailing list