Shutdown asml SNF 2008-03-14 11:17:07: Scheduled lamp change

gsosa at gsosa at
Fri Mar 14 15:19:17 PDT 2008

Lamp change completed. Also, unable to run IQC test due to database overflow. The database was backed up and a new DB established. System up and ready tu use. 