Shutdown asml SNF 2008-10-01 09:34:31: fse working on the stage

gsosa at gsosa at
Wed Oct 1 13:07:57 PDT 2008

FSE will continue working on stage at a later time. He needs to gather some additional hardware. System is stabilized and IQC test looks good. System up and ready to use.

More information about the asml-pcs mailing list