Cooling water system back online now. Restarted the C&T unit on stepper and did a full start-up. Estimated time for stepper to be fully stable is 12/11/11at 14:09. Until then, system can be used for non critical processing. As of 12:45 the focus is at about .3um of nominal. If possible shoot test wafers to verify process. 