Shutdown asml SNF 2012-04-11 08:49:10: Wafer Stage won't Initialize

gsosa at gsosa at
Wed Apr 11 11:14:36 PDT 2012

ASM-L vendors checked and adjusted reciever voltages on both  X and Y axis. Stage initialized OK. IQC  test OK. Vendors to follow up by checking the laser intensity and prepare for a possible laser change. System OK to use now.

More information about the asml-pcs mailing list