From emyers at snf.stanford.edu Mon Oct 11 09:38:27 2010 From: emyers at snf.stanford.edu (emyers at snf.stanford.edu) Date: Mon, 11 Oct 2010 09:38:27 -0700 Subject: Shutdown aw610_l SNF 2010-10-11 09:38:26: water flow Message-ID: Water flow is half of what it was last week and it's discoloured. From emyers at snf.stanford.edu Tue Oct 12 10:24:44 2010 From: emyers at snf.stanford.edu (emyers at snf.stanford.edu) Date: Tue, 12 Oct 2010 10:24:44 -0700 Subject: Comment aw610_l SNF 2010-10-12 10:24:43: Repair Update, 10/12/10 Message-ID: I talked with Jim regarding our water flow problems. The chiller which we bought for the systems failed. As a result of the contamination we need to replace the water supply and return lines along with the flow meters and install a filter. Jim will also be ordering replacement pumps (which could take a week). After the water lines have been replace, we will test the old pumps and see if we can get the system functional in the short term. From emyers at snf.stanford.edu Mon Oct 18 08:30:31 2010 From: emyers at snf.stanford.edu (emyers at snf.stanford.edu) Date: Mon, 18 Oct 2010 08:30:31 -0700 Subject: Comment aw610_l SNF 2010-10-12 10:24:43: Repair Update, 10/12/10 Message-ID: Jim, cleaned up the chiller and replaced water supply lines with larger diameter tubing. Systems are available once again. From emyers at snf.stanford.edu Mon Oct 18 08:30:36 2010 From: emyers at snf.stanford.edu (emyers at snf.stanford.edu) Date: Mon, 18 Oct 2010 08:30:36 -0700 Subject: Shutdown aw610_l SNF 2010-10-11 09:38:26: water flow Message-ID: Jim, cleaned up the chiller and replaced water supply lines with larger diameter tubing. Systems are available once again.