From uli at snf.stanford.edu Fri Dec 2 15:47:02 2005 From: uli at snf.stanford.edu (uli at snf.stanford.edu) Date: Fri, 2 Dec 2005 15:47:02 -0800 Subject: Problem cpd SNF 2005-11-30 01:17:38: not dry completely Message-ID: Changed o-ring and backing ring. Ran a test, system works fine again. From iwjung at snf.stanford.edu Thu Dec 15 01:51:19 2005 From: iwjung at snf.stanford.edu (iwjung at snf.stanford.edu) Date: Thu, 15 Dec 2005 01:51:19 -0800 Subject: Shutdown cpd SNF 2005-12-15 01:51:18: bottle empty Message-ID: My run has failed to reach critical point although the bottle had more than 150lbs. Bottle B seems to be emptly. Please change to bottle A. From uli at snf.stanford.edu Thu Dec 15 15:18:08 2005 From: uli at snf.stanford.edu (uli at snf.stanford.edu) Date: Thu, 15 Dec 2005 15:18:08 -0800 Subject: Shutdown cpd SNF 2005-12-15 01:51:18: bottle empty Message-ID: Bottle A is now connected.