Diffusion Morning Report 12/10/03

ted berg tberg at snf.stanford.edu
Wed Dec 10 06:53:22 PST 2003


Good Morning all,
    Looking good this morning.  Nitride is reassembled and coated.  
Needs test.  TEOS retro is moving along, getting new pieces every day.
Bank 2 will be shut down next Monday or sooner if there are no 
reservations.  Everything else looking good this morning.

Diffusion 	Date: 	12/10/2003 	 
Tube Name/Number 	Status 	Comments 	THICKNESS-Change at
Tylan 1 	Up 	  	 
Tylan 2 	Up 	  	 
Tylan 3 	Up 	  	 
Tylan 4 	Up 	  	 
Tylan 5-BBr3 	Up 	  	 
Tylan 6-POCl3 	Up 	  	 
Tylan 7-Dirty Ox 	down 	TEOS Conversion 	 
Tylan 8-SiGe 	Up 	  	13.9/30
Tylan 9-Poly 	Up 	  	11.6/30
Tylan 10-Nitride 	down 	Pull and Clean 	0/30
Tylan 11-BPSG-LTO 	Up 	  	15.1/30
Tylan 12-FGA 	Up 	  	 
Tystar 	Up 	  	16.4/30
Doped Poly 	GONE 	  	 
TEOS 	yellow 	  	 
Tylan 16 	N/A 	  	 
Burn Box 	Up 	  	 
ZYGO 	Up 	  	 
  	  	  	 
GAAS 22 	UP 	  	 
GAAS 23 	UP 	  	 
  	  	  	 
SiH4 for furnaces 	  	Auto changeover working well 	Currently 320- B(c4) 
on line


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20031210/eff748d3/attachment.html>


More information about the diffusion mailing list