From tberg at snf.stanford.edu Mon Nov 3 06:58:32 2003 From: tberg at snf.stanford.edu (ted berg) Date: Mon, 03 Nov 2003 06:58:32 -0800 Subject: Diffusion Morning Report 11/03/03 Message-ID: <3FA66D18.1000207@snf.stanford.edu> Good Morning All, Looking very good this morning. Everything is up. One mention of bubbles on Nitride?? Diffusion Date: 1/3/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 12.6/30 Tylan 9-Poly Up 7.9/30 Tylan 10-Nitride Up 10.1/30 Tylan 11-BPSG-LTO Up 24.16/30 Tylan 12-FGA Up Tystar Up 0/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 460- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Nov 4 06:27:52 2003 From: tberg at snf.stanford.edu (ted berg) Date: Tue, 04 Nov 2003 06:27:52 -0800 Subject: Diffusion Morning Report 11/04/03 Message-ID: <3FA7B768.8080608@snf.stanford.edu> Good Morning All, Things are looking good this morning. Not sure what is going on with Nitride. Everything else looking good. Diffusion Date: 11/4/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 12.6/30 Tylan 9-Poly Up 7.9/30 Tylan 10-Nitride Up 12.1/30 Tylan 11-BPSG-LTO Up 24.24/30 Tylan 12-FGA Up Tystar Up .1/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up Checked today ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 430- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Nov 5 07:29:16 2003 From: tberg at snf.stanford.edu (ted berg) Date: Wed, 05 Nov 2003 07:29:16 -0800 Subject: Diffusion Morning Report 11/05/03 Message-ID: <3FA9174C.6040209@snf.stanford.edu> Good Morning All, Things are looking good this morning. No problems other than Implant. Looking into it Diffusion Date: 11/5/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 12.6/30 Tylan 9-Poly Up 7.9/30 Tylan 10-Nitride Up 12.6/30 Tylan 11-BPSG-LTO Up 25.8/30 Tylan 12-FGA Up Tystar Up 6.2/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 430- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Nov 6 07:39:44 2003 From: tberg at snf.stanford.edu (ted berg) Date: Thu, 06 Nov 2003 07:39:44 -0800 Subject: Diffusion Morning Report 11/06/03 Message-ID: <3FAA6B40.2060708@snf.stanford.edu> Good Morning All, Looking good this morning. Replaced front panel controler for TEOS- for temp issues. Ray adjusted Zeros on SIGE. Parts for Implanter power supply ordered. Everything else looking good. Diffusion Date: 11/6/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up Adjusted Zeros 12.6/30 Tylan 9-Poly Up 7.9/30 Tylan 10-Nitride Up 13.8/30 Tylan 11-BPSG-LTO Up 27.7/30 Tylan 12-FGA Up Tystar Up 6.6/30 Doped Poly GONE TEOS yellow Replaced front panel controller Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 430- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Nov 7 06:56:48 2003 From: tberg at snf.stanford.edu (ted berg) Date: Fri, 07 Nov 2003 06:56:48 -0800 Subject: Diffusion Morning Report 11/07/03 Message-ID: <3FABB2B0.3070202@snf.stanford.edu> Good Morning All, Looking Good This Morning. TEOS seems to be stable. Implanter still has issues. Everything else looking good. Diffusion Date: 11/7/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.5/30 Tylan 9-Poly Up 7.9/30 Tylan 10-Nitride Up 14.3/30 Tylan 11-BPSG-LTO Up 27.8/30 Tylan 12-FGA Up Tystar Up 7.7/30 Doped Poly GONE TEOS yellow Temp seems to be stable Tylan 16 N/A Burn Box Up Cleaned this morning ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 430- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Nov 10 06:56:17 2003 From: tberg at snf.stanford.edu (ted berg) Date: Mon, 10 Nov 2003 06:56:17 -0800 Subject: Diffusion Morning Report 11/10/03 Message-ID: <3FAFA711.5070103@snf.stanford.edu> Good Morning All, Looking fair this morning. Tylan 3 has loader issues. LTO pump is out of oil and off. Implanter still has issues. Everything else looking good. LTO is getting close to pull and clean. Diffusion Date: 11/10/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 yellow Loader does not come out Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.5/30 Tylan 9-Poly Up 8.7/30 Tylan 10-Nitride Up 14.3/30 Tylan 11-BPSG-LTO down Pump oil all over, pump off 27.8/30 Tylan 12-FGA Up Tystar Up 7.7/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 430- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Nov 11 06:34:13 2003 From: tberg at snf.stanford.edu (ted berg) Date: Tue, 11 Nov 2003 06:34:13 -0800 Subject: Diffusion Morning Report 11/11/03 Message-ID: <3FB0F365.3010101@snf.stanford.edu> Good Morning All, Things are looking good this morning. Implanter still has issues. Everything else looking good. WE have reserved LTO for next Monday for pull and clean.. Diffusion Date: 11/11/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.5/30 Tylan 9-Poly Up 8.7/30 Tylan 10-Nitride Up 14.9/30 Tylan 11-BPSG-LTO Up 28.2/30 Tylan 12-FGA Up Tystar Up 7.7/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 430- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Nov 12 06:24:15 2003 From: tberg at snf.stanford.edu (ted berg) Date: Wed, 12 Nov 2003 06:24:15 -0800 Subject: Diffusion Morning Report 11/12/03 Message-ID: <3FB2428F.10503@snf.stanford.edu> Good Morning All, Looking good today. Nitride Bubble issue observing. Implanter is being worked on by Dick and John Everything else looking good. Diffusion Date: 11/12/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.5/30 Tylan 9-Poly Up 8.7/30 Tylan 10-Nitride Up 17.6/30 Tylan 11-BPSG-LTO Up 28.4/30 Tylan 12-FGA Up Tystar Up 7.7/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 430- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Nov 13 06:55:15 2003 From: tberg at snf.stanford.edu (ted berg) Date: Thu, 13 Nov 2003 06:55:15 -0800 Subject: Diffusion Morning Report 11/13/03 Message-ID: <3FB39B53.3000009@snf.stanford.edu> Good Morning All, Looking pretty good this morning. Some problems with nitride looking into them. Implanter seems to be running . Everything else looking good. Diffusion Date: 11/13/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.9/30 Tylan 9-Poly Up 9.2/30 Tylan 10-Nitride Up 17.6/30 Tylan 11-BPSG-LTO Up 28.5/30 Tylan 12-FGA Up Tystar Up 7.7/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 430- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Nov 14 06:32:07 2003 From: tberg at snf.stanford.edu (ted berg) Date: Fri, 14 Nov 2003 06:32:07 -0800 Subject: Diffusion Morning Report 11/14/03 Message-ID: <3FB4E767.5090707@snf.stanford.edu> Good Morning all, Looking Good this morning. LTO won't pump down- looking into it. Burn box cleaned this morning. Diffusion Date: 11/14/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.9/30 Tylan 9-Poly Up 9.3/30 Tylan 10-Nitride Up 17.6/30 Tylan 11-BPSG-LTO down Won't pump down 28.5/30 Tylan 12-FGA Up Tystar Up 7.7/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up Checked this Morning ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 425- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Nov 17 06:34:27 2003 From: tberg at snf.stanford.edu (ted berg) Date: Mon, 17 Nov 2003 06:34:27 -0800 Subject: Diffusion Morning Report 11/17/03 Message-ID: <3FB8DC73.8010509@snf.stanford.edu> Good Morning All, Looking pretty good this morning. Bpsg is down for scheduled pull and clean. Nitride has some pumping issues. Everything else looking good. Diffusion Date: 11/17/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.9/30 Tylan 9-Poly Up 10.1/30 Tylan 10-Nitride yellow problems pumping down 17.6/30 Tylan 11-BPSG-LTO down pull and clean 0/30 Tylan 12-FGA Up Tystar Up 10.7/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 400- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Nov 18 06:55:26 2003 From: tberg at snf.stanford.edu (ted berg) Date: Tue, 18 Nov 2003 06:55:26 -0800 Subject: Diffusion Morning Report 11/18/03 Message-ID: <3FBA32DE.8010905@snf.stanford.edu> Good Morning All, Looking OK this morning. LTO is back together waiting for a test, Nitride had some temp problems yesterday but looks ok now. HCl for epi is being changed this morning since there was a break in the schedule. Everything else looks ok. Diffusion Date: 11/18/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.9/30 Tylan 9-Poly Up 9.8/30 Tylan 10-Nitride yellow temp problem yesterday 17.9/30 Tylan 11-BPSG-LTO down pull and clean 0/30 Tylan 12-FGA Up Tystar Up 11.4/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 385- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Nov 19 06:26:15 2003 From: tberg at snf.stanford.edu (ted berg) Date: Wed, 19 Nov 2003 06:26:15 -0800 Subject: Diffusion Morning Report 11/19/03 Message-ID: <3FBB7D87.4010800@snf.stanford.edu> Good Morning All, Looking good this morning. HCl leakrate good for Epi. LTO back up from Pull and clean. No problems noted on Nitride-still monitoring.. Everything else ok. Diffusion Date: 11/19/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.9/30 Tylan 9-Poly Up 10.1/30 Tylan 10-Nitride yellow temp problem observation 17.9/30 Tylan 11-BPSG-LTO Up .34/30 Tylan 12-FGA Up Tystar Up 11.4/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 385- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Nov 20 07:08:26 2003 From: tberg at snf.stanford.edu (ted berg) Date: Thu, 20 Nov 2003 07:08:26 -0800 Subject: Diffusion Morning Report 11/20/03 Message-ID: <3FBCD8EA.6070800@snf.stanford.edu> Good Morning All, Looking Good this morning. No problems noted with nitride temp. Everything else looking good. Diffusion Date: 11/20/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.9/30 Tylan 9-Poly Up 10.1/30 Tylan 10-Nitride yellow temp problem observation 18.2/30 Tylan 11-BPSG-LTO Up 2.5/30 Tylan 12-FGA Up Tystar Up 11.4/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 380- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From alhaji_m1 at myway.com Thu Nov 20 19:51:35 2003 From: alhaji_m1 at myway.com (ALHAJI MOHAMMED ABACHA) Date: Fri, 21 Nov 2003 03:51:35 +0000 Subject: PROPOSA Message-ID: ALHAJI MOHAMMED ABACHA 2/8 GIDADO DRIVE,GRA, KANO - NIGERIA. PLEASE AS YOU READ KINDLY OPEN THE WEBSITE FOR THISDAY NEWSPAPER OF TUESDAY,SEPTEMBER 24TH.,2002. VOL 8,NO.2711 FRONT PAGE. AT (WWW.THISDAYONLINE.COM).PLEASE EXCUSE MY INTRUSION INTO YOUR PRIVATE LIFE AS I WRITE YOU THIS LETTER IN GOOD FAITH AND TO THE GLORY OF ALMIGHTY GOD WHO THUS BROUGHT ME OUT CLEAN AFTER ALL THE ALLEGATIONS LEVELLED AGAINST ME AFTER THE DEATH OF MY FATHER GENERAL SANI ABACHA (FORMER NIGERIAN MILITARY HEAD OF STATES).MY RELEASE FROM PRISON WAS NECESSITATED BY THE EFFORTS OF THE SENATE PRESIDENT CHIEF ANYIM PIUS ANYIM AND THE SPEAKER OF THE LOWER HOUSE ALHAJI GHALI NA'ABBA. SINCE MY FATHER'S DEATH AND MY DETENTION FOR CLOSE TO THREE YEARS, MY FAMILY HAS BEEN LOOSING A LOT OF MONEY DUE TO VINDICTIVE GOVERNMENT OFFICIALS WHO ARE BENT ON DEALING WITH OUR FAMILY. AFTER MY RELEASE THE FEDERAL GOVERNMENT OF NIGERIA HAS MADE ME SIGN SOME DOCUMENTS THAT WILL ENABLE THEM EXTRACT THE SUM OF ONE BILLION FIVE HUNDRED MILLION US DOLLARS FROM MY FATHER?S BANK ACCOUNTS IN LONDON,SWITZERLAND,LUXEMBIURG,LIECHTENSTEIN AND JESEY ETC. MY FAMILY AND I ARE LOOKING FOR A TRUSTWORTHY FOREIGN PARTNER WHO CAN ASSIST US BY TAKING POSESSION OF THE TOTAL SUM OF US$25,000,000.00 ( TWENTY FIVE MILLION UNITED STATES DOLLARS ), WHICH THE GOVERNMENT DID NOT KNOW ABOUT. BECAUSE IN THEIR THINKING THEY WANT TO LEAVE ONLY ONE HUNDRED MILLION TO MY FAMILY THIS MONEY IS PRESENTLY IN THE POSSESSION OF A SECURITY COMPANY ABROAD. THIS MONEY WAS OF COURSE, ACQUIRED BY MY LATE FATHER AND IS NOW KEPT SECRETLY BY THE FAMILY. THE SWISS GOVERNMENT HAS ALREADY FROZEN ALL OTHER ACCOUNTS OF MY FAMILY IN SWITZERLAND, AND SOME OTHER COUNTRIES ALSO TRIED DOING LIKE WISE. THIS BID BY SOME GOVERNMENT OFFICIALS TO DEAL WITH THIS FAMILY HAS MADE IT NECESSARY THAT I SEEK YOUR ASSISITANCE IN RECEIVING THIS MONEY AND IN INVESTING IT ON BEHALF OF MY FAMILY. THIS MUST BE A JOINT VENTURE TRANSACTION AND WE MUST ALL WORK TOGETHER. SINCE THIS MONEY IS STILL CASH,EXTRA SECURITY MEASURES HAVE BEEN TAKEN TO PROTECT IT FROM THEFT OR SEIZURE. I HAVE PERSONALLY WORKED OUT ALL MODALITIES FOR THE PEACEFUL CONCLUSION OF THIS TRANSACTION WITH THE SECUITY COMPANY. HOWEVER, BASED ON THE GROUNDS THAT YOU ARE WILLING TO WORK WITH ME AND ALSO ALL CONTENTIOUS ISSUES DISCUSSED BEFORE THE COMMENCEMENT OF THIS TRANSACTION. YOU MAY ALSO DISCUSS YOUR PERCENTAGE BEFORE WE START TO WORK.AS SOON AS I HEAR FROM YOU, I WILL GIVE YOU ALL NECESSARY DETAILS AS TO HOW WE INTEND TO CARRY OUT THE WHOLE TRANSACTION. PLEASE, DO NOT ENTERTAIN ANY FEARS, AS ALL NECESSARY MODALITIES ARE IN PLACE, AND I ASSURE YOU OF ALL SUCCESS AND SAFETY IN THIS TRANSACTION.PLEASE, THIS TRANSACTION REQUIRES ABSOLUTE CONFIDENTIALITY AND YOU WOULD BE EXPECTED TO TREAT IT AS SUCH. IF YOU ARE INTERESTED IN ASSISTING ME PLEASE SEND ME YOUR CONCENT AND TELEPHONE NUMBER. PLEASE, YOU MAY ALSO IGNORE THIS LETTER AND RESPECT MY TRUST IN YOU BY NOT EXPOSING THIS TRANSACTION, SHOULD YOU NOT BE INTERESTED. I LOOK FORWARD TO WORKING WITH YOU. THANK YOU ALHAJI MOHAMMED ABACHA From tberg at snf.stanford.edu Fri Nov 21 06:35:23 2003 From: tberg at snf.stanford.edu (ted berg) Date: Fri, 21 Nov 2003 06:35:23 -0800 Subject: Diffusion Morning Report 11/21/03 Message-ID: <3FBE22AB.8060506@snf.stanford.edu> Good Morning All, Things are looking good today. Still observing Nitride temp so far no problems. Everything else looking good. Diffusion Date: 11/21/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.9/30 Tylan 9-Poly Up 10.1/30 Tylan 10-Nitride yellow temp problem observation 18.7/30 Tylan 11-BPSG-LTO Up 2.7/30 Tylan 12-FGA Up Tystar Up 11.4/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 370- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From seymour at snf.stanford.edu Mon Nov 24 07:34:18 2003 From: seymour at snf.stanford.edu (Ray Seymour) Date: Mon, 24 Nov 2003 07:34:18 -0800 Subject: Diffusion Morning report 11/24/03 Message-ID: <3FC224F9.6AA8A04D@snf.stanford.edu> Morning all, Ted is out this week. Diffusion Date: 11/24/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.93/30 Tylan 9-Poly Up 10.68/15 Tylan 10-Nitride yellow temp problem observation 18.85/30 Tylan 11-BPSG-LTO Up Particles reported 5.22/30 Tylan 12-FGA Up Tystar Up 12.00/30 Doped Poly GONE TEOS yellow Temp control problems Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 350- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From seymour at snf.stanford.edu Tue Nov 25 08:20:06 2003 From: seymour at snf.stanford.edu (Ray Seymour) Date: Tue, 25 Nov 2003 08:20:06 -0800 Subject: Diffusion Morning Report Message-ID: <3FC38136.7AD81639@snf.stanford.edu> Morning all, Ted is out this week. TEOS has a temperature control problem with the center zone Diffusion Date: 11/25/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.93/30 Tylan 9-Poly Up 10.68/15 Tylan 10-Nitride yellow Temp problem, observation 18.85/30 Tylan 11-BPSG-LTO Up 7.7/30 Tylan 12-FGA Up Tystar Up 12.4/30 Doped Poly GONE TEOS RED Temp control problems Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 350- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From seymour at snf.stanford.edu Wed Nov 26 08:18:48 2003 From: seymour at snf.stanford.edu (Ray Seymour) Date: Wed, 26 Nov 2003 08:18:48 -0800 Subject: Diffusion Morning Report Message-ID: <3FC4D268.948528A5@snf.stanford.edu> Morning all, Ted is out this week. TEOS temperature control is being monotored Diffusion Date: 11/25/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.93/30 Tylan 9-Poly Up 10.68/15 Tylan 10-Nitride Up 18.85/30 Tylan 11-BPSG-LTO Up 7.7/30 Tylan 12-FGA Up Tystar Up 12.5/30 Doped Poly GONE TEOS RED Temp control problems, observation Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 350- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: From seymour at snf.stanford.edu Wed Nov 26 08:22:31 2003 From: seymour at snf.stanford.edu (Ray Seymour) Date: Wed, 26 Nov 2003 08:22:31 -0800 Subject: Diffusion Morning Report Nov. 26, 03 Message-ID: <3FC4D347.728201A9@snf.stanford.edu> Morning all, Ted is out this week. TEOS temperature control is being monotored Diffusion Date: 11/26/2003 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-Dirty Ox Up Tylan 8-SiGe Up 13.93/30 Tylan 9-Poly Up 10.68/15 Tylan 10-Nitride Up 18.85/30 Tylan 11-BPSG-LTO Up 7.7/30 Tylan 12-FGA Up Tystar Up 12.5/30 Doped Poly GONE TEOS RED Temp control problems, observation Tylan 16 N/A Burn Box Up ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well Currently 350- B(c4) on line -------------- next part -------------- An HTML attachment was scrubbed... URL: