Diffusion Morning Report 01/08/04

ted berg tberg at snf.stanford.edu
Thu Jan 8 06:31:26 PST 2004


Good Morning All,
    Looking pretty good this morning.  Still waiting for results from 
TYlan 5 and 6.  SiGe is in final assembly and will then need a test.
TEOS is moving along.  Trying to get time to work on signs.  Everything 
else is ok.
Diffusion 	Date: 	1/8/2004 	 
Tube Name/Number 	Status 	Comments 	THICKNESS-Change at
Tylan 1 	Up 	  	 
Tylan 2 	Up 	  	 
Tylan 3 	Up 	  	 
Tylan 4 	Up 	  	 
Tylan 5-BBr3 	down 	needs test 	 
Tylan 6-POCl3 	down 	needs test 	 
Tylan 7-Dirty Ox 	down 	TEOS Conversion 	 
Tylan 8-SiGe 	down 	bank 2 conversion 	0/30
Tylan 9-Poly 	Up 	  	12.17/30
Tylan 10-Nitride 	Up 	  	16.22/30
Tylan 11-BPSG-LTO 	Up 	  	2.2/30
Tylan 12-FGA 	Up 	  	 
Tystar 	Up 	  	16.9/30
Doped Poly 	GONE 	  	 
TEOS 	yellow 	needs test 	 
Tylan 16 	N/A 	  	 
Burn Box 	Up 	  	 
ZYGO 	Up 	  	 
  	  	  	 
GAAS 22 	UP 	  	 
GAAS 23 	UP 	  	 
  	  	  	 
SiH4 for furnaces 	  	Auto changeover working well 	Currently 295- B(c4) 
on line

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20040108/7da81e37/attachment.html>


More information about the diffusion mailing list