Good Morning All,
Looking Ok this morning. Had a problem with new readout controller
was not allowing switch to main valve-replaced with old one
and tested. Tystar was coated and had leak fail -looking into it.
Everything else is ok.
Diffusion Date: 3/5/2004
Tube Name/Number Status Comments THICKNESS-Change at
Tylan 1 Up
Tylan 2 Up
Tylan 3 Up
Tylan 4 Up
Tylan 5-BBr3 Up
Tylan 6-POCl3 Up
Tylan 7-TEOS2 down Waiting for Mfc
Tylan 8-SiGe Up 5.4/30
Tylan 9-Poly Up 1.3/30
Tylan 10-Nitride yellow particles 20.8/30
Tylan 11-BPSG-LTO Up 7.14/30
Tylan 12-FGA Up
Tystar down pull and clean-in work 0/30
Doped Poly GONE
TEOS yellow running
Tylan 16 N/A
Burn Box Up
ZYGO yellow keyboard problem
GAAS 22 UP
GAAS 23 UP
SiH4 for furnaces Auto changeover working well A on line 660 PSI
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20040305/677dc6b8/attachment.html>
More information about the diffusion
mailing list