Diffusion Morning Report 03/08/04
ted berg
tberg at snf.stanford.edu
Mon Mar 8 06:42:32 PST 2004
Good Morning All,
Looking pretty good this morning. Tystar is still down having pump
down issues. Ran a coat and first poly run on Thermco-it looked
not good.. Nitride still has particles intermittantly. TEOS 2 MFC
should be here on March 26th. WARNING: Tomorrow we will be shutting
down WBDIFF to install the new 2 stack rinser dryer-4/6" so the bench
will be down for several hours. Everything else looking OK
Diffusion Date: 3/8/2004
Tube Name/Number Status Comments THICKNESS-Change at
Tylan 1 Up
Tylan 2 Up
Tylan 3 Up
Tylan 4 Up
Tylan 5-BBr3 Up
Tylan 6-POCl3 Up
Tylan 7-TEOS2 down Waiting for Mfc-3/26 delivery
Tylan 8-SiGe Up 5.4/30
Tylan 9-Poly Up 1.64/30
Tylan 10-Nitride yellow particles 21.9/30
Tylan 11-BPSG-LTO Up 8.1/30
Tylan 12-FGA Up
Tystar down pull and clean-in work 0/30
Doped Poly GONE
TEOS yellow running
Tylan 16 N/A
Burn Box Up
ZYGO yellow keyboard problem
GAAS 22 UP
GAAS 23 UP
SiH4 for furnaces Auto changeover working well A on line 660 PSI
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20040308/c7fe9c4c/attachment.html>
More information about the diffusion
mailing list