Good Morning All,
    Looking pretty good this morning.  Nitride is getting  a lot of use. 
Tylan 1 is still down for I/O error even after several board changes.
TEOS 2 mfc is in and functional waiting for last parts for plasma trap. 
All Lp tubes are getting close to change- should we take one
down early?  Burn box is at 0 looks like long runs are brutal.  Thermco 
poly pump replaced yesterday-oil leak.  Everything else
looks OK.

Diffusion 	Date: 	5/4/2004 	 
Tube Name/Number 	Status 	Comments 	THICKNESS-Change at
Tylan 1 	down 	I/O error 	 
Tylan 2 	Up 	  	 
Tylan 3 	Up 	  	 
Tylan 4 	Up 	  	 
Tylan 5-BBr3 	Up 	  	 
Tylan 6-POCl3 	Up 	  	 
Tylan 7-TEOS2 	down 	MFC is  installed testing 	 
Tylan 8-SiGe 	Up 	  	6.6/30
Tylan 9-Poly 	Up 	  	26.3/30
Tylan 10-Nitride 	yellow 	particles-better??;long runs? 	24.6/30
Tylan 11-BPSG-LTO 	Up 	  	25.9/30
Tylan 12-FGA 	Up 	  	 
Tystar 	Up 	  	11.2/30
Doped Poly 	GONE 	  	 
TEOS 	yellow 	 running 	 
Tylan 16 	N/A 	  	 
Burn Box 	Up 	  	 
ZYGO 	Up 	  	 
  	  	  	 
GAAS 22 	UP 	  	 
GAAS 23 	UP 	  	 
  	  	  	 
SiH4 for furnaces 	  	Auto changeover working well 	A on line 565 PSI


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20040504/072ee002/attachment.html>


More information about the diffusion mailing list