From tberg at snf.stanford.edu Fri Oct 1 06:40:10 2004 From: tberg at snf.stanford.edu (tberg) Date: Fri, 01 Oct 2004 06:40:10 -0700 Subject: Diffusion Morning Report 10/01/04 Message-ID: <415D5E3A.8020004@snf.stanford.edu> Good Morning All, Looking pretty good this morning. Nitride is back up after pull and clean-still some particle issues. Poly is still under observation and looking fine. TEOS2 and Thermco Poly are testing. Epi still has haze issues. Burnbox cleaned this morning. Everything else OK for now. Diffusion Date: 10/1/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 12.17/30 Tylan 10-Nitride Up .2/30 Tylan 11-BPSG-LTO Up 12.33/30 Tylan 12-FGA Up Tystar Up 4.21/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up Cleaned this morning ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 600 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Oct 4 06:50:05 2004 From: tberg at snf.stanford.edu (tberg) Date: Mon, 04 Oct 2004 06:50:05 -0700 Subject: Diffusion Morning Report 10/04/04 Message-ID: <4161550D.5020802@snf.stanford.edu> Good Morning All, Looking OK for a Monday. Poly and Nitride under observation. TEOS2 and Thermco poly testing. Epi is having temp problems. Everything else looks OK for now. Diffusion Date: 10/4/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 12.17/30 Tylan 10-Nitride Up .26/30 Tylan 11-BPSG-LTO Up 12.78/30 Tylan 12-FGA Up Tystar Up 4.21/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 600 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Oct 5 06:32:31 2004 From: tberg at snf.stanford.edu (tberg) Date: Tue, 05 Oct 2004 06:32:31 -0700 Subject: Diffusion Morning Report 10/05/04 Message-ID: <4162A26F.6050007@snf.stanford.edu> Good Morning All, Looking pretty good this morning. Poly and Nitride are under observation Maurice tested Nitride yesterday. Epi is having Temp problems. TEOS2 and Thermco Poly are testing. Everything else looks ok for now. Diffusion Date: 10/5/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 12.17/30 Tylan 10-Nitride yellow possible particle issues .54/30 Tylan 11-BPSG-LTO Up 12.78/30 Tylan 12-FGA Up Tystar Up 4.33/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 590 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Oct 6 06:27:00 2004 From: tberg at snf.stanford.edu (tberg) Date: Wed, 06 Oct 2004 06:27:00 -0700 Subject: Diffusion Morning Report 10/06/04 Message-ID: <4163F2A4.8000600@snf.stanford.edu> Good Morning All, Looking good this morning . Poly is back to gren after a month of observation. Nitride is still under observation. Epi is wonderful again. Everything else looking good for now. WBsilicide will most likely be moving next week so be prepared. Diffusion Date: 10/6/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing-changed TEOS Container Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly Up 17.27/30 Tylan 10-Nitride yellow possible particle issues 1.06/30 Tylan 11-BPSG-LTO Up 14.58/30 Tylan 12-FGA Up Tystar Up 4.33/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 560 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Oct 7 07:11:04 2004 From: tberg at snf.stanford.edu (tberg) Date: Thu, 07 Oct 2004 07:11:04 -0700 Subject: Diffusion Morning Report 10/07/04 Message-ID: <41654E78.4030709@snf.stanford.edu> Good Morning All, Lo0oking fair this morning. Poly has brown powder near the middle of the tube-investigating. Nitride under observation. Phosphine turned on to Thermco poly. TEOS 2 testing. WBsilicide will likely be moved next week. Everything else ok for now. Diffusion Date: 10/7/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing-changed TEOS Container Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly down brown dust on wafers 21.27/30 Tylan 10-Nitride yellow possible particle issues 1.33/30 Tylan 11-BPSG-LTO Up 14.94/30 Tylan 12-FGA Up Tystar Up 4.33/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 560 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Oct 8 07:29:41 2004 From: tberg at snf.stanford.edu (tberg) Date: Fri, 08 Oct 2004 07:29:41 -0700 Subject: Diffusion Morning Report 10/08/04 Message-ID: <4166A455.6010501@snf.stanford.edu> Good Morning All, Looking fair today. Poly has been coated and waiting test results after P & C. Epi had an HCL leak last night that was quite ugly-it is down while we figure out how much is damaged. Nitride is under observation. Burn box cleaned this morning. Everything else looks OK for now. Diffusion Date: 10/8/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing- Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly down Pull and Clean-waiting test 0/30 Tylan 10-Nitride yellow possible particle issues 1.39/30 Tylan 11-BPSG-LTO Up 14.94/30 Tylan 12-FGA Up Tystar Up 4.33/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up Cleaned this morning ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 560 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Oct 11 07:00:02 2004 From: tberg at snf.stanford.edu (tberg) Date: Mon, 11 Oct 2004 07:00:02 -0700 Subject: Diffusion Morning Report 10/11/04 Message-ID: <416A91E2.2050108@snf.stanford.edu> Good Morning All, Looking pretty good this morning. Nitride had a temp alarm-reseated connector. Poly is under observation. Epi is down waiting parts after HCl leak. TEOS2 and Thermco poly testing. Everything else looks ok for now. Diffusion Date: 10/8/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing-changed TEOS Container Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation .26/30 Tylan 10-Nitride yellow possible particle issues 1.39/30 Tylan 11-BPSG-LTO Up 14.94/30 Tylan 12-FGA Up Tystar Up 4.33/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 560 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From gotopatches at earthlink.net Tue Oct 12 06:01:52 2004 From: gotopatches at earthlink.net (gotopatches at earthlink.net) Date: 12 Oct 2004 06:01:52 -0700 Subject: Brighten Up Your Smile - ComplimentaryTrial Message-ID: <20041012060152.BD348A0340779B7D@earthlink.net> Arctic White's patented system whitens your teeth below the surface, by up to 8 shades, for a full year. Simply use it for 10 minutes a day for 10 days. Developed by a leading dental laboratory for celebrity clients, Arctic White's formulas are in premeasured vials, making them safe and easy to use. Try the complimentary trial today It's a simple 3-step process: ? Condition: Use the unique rinse to open the teeth's pores. ? Whiten: A 6% hydrogen peroxide formula whitens within. ? Strengthen: Finally, a special wash closes pores, strengthening teeth. TRY IT NOW! ? **If this e-mail has reached you in error or if you would like to be removed from the database please reply to this e-mail with "remove" in the subject line or e-mail gotopatches at earthlink.net with the request.** 12280 Saratoga-Sunnyvale Rd., Suite - 105, Saratoga, CA, 95070 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: aw_trial_600x449_1.jpg Type: image/jpeg Size: 39723 bytes Desc: not available URL: From tberg at snf.stanford.edu Tue Oct 12 06:37:02 2004 From: tberg at snf.stanford.edu (tberg) Date: Tue, 12 Oct 2004 06:37:02 -0700 Subject: Diffusion Morning Report 10/12/04 Message-ID: <416BDDFE.1060508@snf.stanford.edu> Good Morning All, Looking pretty good this morning. 7 microns of poly added yesterday-still observing. Nitride under observation for particles. Epi is waiting for parts. TEOS 2 and Thermco Poly testing. WB silicide will move next week beginning on Tuesday- we will shut it down for decon on Monday. Everything else looks OK for now. . Date: 10/12/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing-changed TEOS Container Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 7.26/30 Tylan 10-Nitride yellow possible particle issues 1.48/30 Tylan 11-BPSG-LTO Up 14.99/30 Tylan 12-FGA Up Tystar Up 4.33/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 560 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From maurice at snf.stanford.edu Tue Oct 12 09:29:29 2004 From: maurice at snf.stanford.edu (Maurice Stevens) Date: Tue, 12 Oct 2004 09:29:29 -0700 Subject: NITRIDE2 test In-Reply-To: <416BDDFE.1060508@snf.stanford.edu> References: <416BDDFE.1060508@snf.stanford.edu> Message-ID: <416C0669.3060307@snf.stanford.edu> Hi, Maurice: I did NITRIDE2 just now. I put two wafers face to face in the middle tray, it comes out that they have less particles (tens per field) than the wafers in the right-hand-side tray (hundreds per field). Maybe this happens just by chance, but maybe putting wafers closer together could reduce the number of particles. Jia tberg wrote: > Good Morning All, > Looking pretty good this morning. 7 microns of poly added > yesterday-still observing. Nitride under observation for particles. > Epi is waiting > for parts. TEOS 2 and Thermco Poly testing. WB silicide will move > next week beginning on Tuesday- we will shut it down for decon on Monday. > Everything else looks OK for now. > > . Date: 10/12/2004 > Tube Name/Number Status Comments THICKNESS-Change at > Tylan 1 Up > Tylan 2 Up > Tylan 3 Up > Tylan 4 Up > Tylan 5-BBr3 Up > Tylan 6-POCl3 Up > Tylan 7-TEOS2 down Qual testing-changed TEOS Container > Tylan 8-SiGe Up 12.33/30 > Tylan 9-Poly yellow observation 7.26/30 > Tylan 10-Nitride yellow possible particle issues 1.48/30 > Tylan 11-BPSG-LTO Up 14.99/30 > Tylan 12-FGA Up > Tystar Up 4.33/30 > Doped Poly GONE > TEOS up > Tylan 16 N/A > Thermco 1 Up > Thermco 2 Up > Thermco Poly yellow Testing > Thermco Nitride Down Waiting > > Burn Box Up > ZYGO up > > GAAS 22 UP > GAAS 23 UP > > SiH4 for furnaces Auto changeover working well B on line 560 PSI > > -- maurice at stanford.edu Maurice Stevens Stanford Nanofabrication Facility CIS Room 142, Mail Code 4070 Stanford, CA 94305 P. (650)725-3660 F. (650)725.6278 -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Oct 13 06:38:32 2004 From: tberg at snf.stanford.edu (tberg) Date: Wed, 13 Oct 2004 06:38:32 -0700 Subject: Diffusion Morning Report 10/13/04 Message-ID: <416D2FD8.8020409@snf.stanford.edu> Good Morning All, Looking good this morning. Poly and Nitride under observation. Epi is waiting for parts. TEOS2 and Thermco Poly testing. Everything else looking OK for now. . Date: 10/13/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing-changed TEOS Container Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 7.48//30 Tylan 10-Nitride yellow possible particle issues 1.62/30 Tylan 11-BPSG-LTO Up 19.29/30 Tylan 12-FGA Up Tystar Up 4.33/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 560 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Oct 14 06:22:53 2004 From: tberg at snf.stanford.edu (tberg) Date: Thu, 14 Oct 2004 06:22:53 -0700 Subject: Diffusion Morning Report 10/14/04 Message-ID: <416E7DAD.5000701@snf.stanford.edu> Good Morning All, Looking pretty good this morning. Poly and Nitride under observation. Epi waiting parts. TEOS2 and Thermco poly testing. Everything else looks ok for now. . Date: 10/14/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Possible uniformity problems _injector replaced Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing-changed TEOS Container Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 8.15//30 Tylan 10-Nitride yellow possible particle issues 1.78/30 Tylan 11-BPSG-LTO Up 19.29/30 Tylan 12-FGA Up Tystar Up 4.33/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 555 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From nanotech at nsti.org Thu Oct 14 21:07:14 2004 From: nanotech at nsti.org (Nano Science and Technology Institute) Date: Thu, 14 Oct 2004 21:07:14 -0700 Subject: Nanotech 2005, Abstract & Exhibitor Call Message-ID: An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Oct 15 06:53:05 2004 From: tberg at snf.stanford.edu (tberg) Date: Fri, 15 Oct 2004 06:53:05 -0700 Subject: Diffusion Morning Report 10/15/04 Message-ID: <416FD641.6030302@snf.stanford.edu> Good Morning All, Looking good this morning. Nitride and Poly under observation TEOS2 and Thermco poly testing. WBsilicicide down on Monday for move Burn box cleaned this morning. Rebuilt epi Reg should be back early next week.. Everything else looking ok for now. . Date: 10/15/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing-changed TEOS Container Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 9.05//30 Tylan 10-Nitride yellow possible particle issues 1.82/30 Tylan 11-BPSG-LTO Up 20.9/30 Tylan 12-FGA Up Tystar Up 4.33/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up cleaned this morning ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 545 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Oct 18 07:37:32 2004 From: tberg at snf.stanford.edu (tberg) Date: Mon, 18 Oct 2004 07:37:32 -0700 Subject: Diffusion Morning Report 10/18/04 Message-ID: <4173D52C.7060008@snf.stanford.edu> Good Morning All, Looking pretty good this morning. Nitride and poly are under observation. LTOs pump was off-looking into it. Tylan 2 had temp issues -remade TC connections-ok now. WBsilicide shutdown for decon in prep for move. Epi regulator is being rebuilt-hope for return this week. Everything else looking OK for now. > . Date: 10/18/2004 > Tube Name/Number Status Comments THICKNESS-Change at > Tylan 1 Up > Tylan 2 Up > Tylan 3 Up > Tylan 4 Up > Tylan 5-BBr3 Up > Tylan 6-POCl3 Up > Tylan 7-TEOS2 down Qual testing > Tylan 8-SiGe Up 12.33/30 > Tylan 9-Poly yellow observation 11.87//30 > Tylan 10-Nitride yellow possible particle issues 2.79/30 > Tylan 11-BPSG-LTO down Pump was off investigating 21.1/30 > Tylan 12-FGA Up > Tystar Up 7.46/30 > Doped Poly GONE > TEOS up > Tylan 16 N/A > Thermco 1 Up > Thermco 2 Up > Thermco Poly yellow Testing > Thermco Nitride Down Waiting > > Burn Box Up > ZYGO up > > GAAS 22 UP > GAAS 23 UP > > SiH4 for furnaces Auto changeover working well B on line 520 PSI > -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Oct 19 06:50:07 2004 From: tberg at snf.stanford.edu (tberg) Date: Tue, 19 Oct 2004 06:50:07 -0700 Subject: Diffusion Morning Report 10/19/04 Message-ID: <41751B8F.2080701@snf.stanford.edu> Good Morning All, Looking pretty good this morning. Nitride and poly under observation. LTO is back up after pump change. TEOS2 and Thermco Poly are testing. EPI parts should be here this week. WB silicide is deconed and move begins this morning-it may be a bit hectic around banks 3 and 4. Everything else looks OK for now. . Date: 10/1/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 11.98//30 Tylan 10-Nitride yellow possible particle issues 2.89/30 Tylan 11-BPSG-LTO Up Pump replaced 23.07/30 Tylan 12-FGA Up Tystar Up 7.46/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 520 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Oct 20 06:46:39 2004 From: tberg at snf.stanford.edu (tberg) Date: Wed, 20 Oct 2004 06:46:39 -0700 Subject: Diffusion Morning Report 10/20/04 Message-ID: <41766C3F.7030204@snf.stanford.edu> Good Morning All, Looking OK this morning. Nitride and Poly under observation. WB silicide is in the process of moving. Epi parts should be here this week. Gas vault fans /sensor failed last night and all gases in the vaults went off-back on now. Please check runs from 12:00am until 6:00am this morning for proper thicknesses. TEOS2 and Thermco poly testing. Everything else seems ok for now. . Date: 10/20/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 11.98//30 Tylan 10-Nitride yellow possible particle issues 3.73/30 Tylan 11-BPSG-LTO Up 23.07/30 Tylan 12-FGA Up Tystar Up 7.46/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 510 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From gotopatches at earthlink.net Wed Oct 20 09:16:24 2004 From: gotopatches at earthlink.net (gotopatches at earthlink.net) Date: 20 Oct 2004 09:16:24 -0700 Subject: Lose Weight Now - Your Free Trial! Message-ID: <20041020091624.AD75E4166E1F3986@earthlink.net> **If this e-mail has reached you in error or if you would like to be removed from the database please reply to this e-mail with "remove" in the subject line or e-mail gotopatches at earthlink.net with the request.** 12280 Saratoga-Sunnyvale Rd., Suite - 105, Saratoga, CA, 95070 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: cort_600x543_1.jpg Type: image/jpeg Size: 77471 bytes Desc: not available URL: From tberg at snf.stanford.edu Thu Oct 21 06:45:11 2004 From: tberg at snf.stanford.edu (tberg) Date: Thu, 21 Oct 2004 06:45:11 -0700 Subject: Diffusion Morning Report 10/21/04 Message-ID: <4177BD67.4060704@snf.stanford.edu> Good Morning All, Looking Good this morning. WB silicide is in place and functional waiting for Permit approval and seismic anchoring before use. Nitride and poly under observation. Epi reg should be here today. TEOS2 and Thermco Poly testing. Everything else looks ok for now. . Date: 10/21/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 12.13//30 Tylan 10-Nitride yellow possible particle issues 4.08/30 Tylan 11-BPSG-LTO Up 23.88/30 Tylan 12-FGA Up Tystar Up 7.8/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 500 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Oct 22 06:35:46 2004 From: tberg at snf.stanford.edu (tberg) Date: Fri, 22 Oct 2004 06:35:46 -0700 Subject: Diffusion Morning Report 10/22/04 Message-ID: <41790CB2.8030401@snf.stanford.edu> Good Morning All, Looking good this morning. Nitride and Poly under observation. TEOS2 and Thermco poly testing. Epi regulator is in and in leak check. Everything else looks ok for now. . Date: 10/22/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 12.13//30 Tylan 10-Nitride yellow possible particle issues 4.19/30 Tylan 11-BPSG-LTO Up 24.7/30 Tylan 12-FGA Up Tystar Up 7.8/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up Cleaned this morning ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 500 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From seymour at snf.stanford.edu Mon Oct 25 08:29:20 2004 From: seymour at snf.stanford.edu (Ray Seymour) Date: Mon, 25 Oct 2004 08:29:20 -0700 Subject: Diffusion Morning Report Message-ID: <417D1BCF.9A28B959@snf.stanford.edu> Good Morning All, Ted is out today, I will endeavor to cover for him as best I can. Epi is back up except for Diborane use do to a sensor replacement and a period of observation on the new sensor. Thermco Poly and Nitride are much the same as last week. TylanBPSG is approaching its pull and clean and will be going down on Thursday morning for that. All else looks good today. Have a great day. Diffusion date: 10/25/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly Up observation 12.13/30 Tylan 10-Nitride yellow Particles? 4.19/30 Tylan 11-BPSG-LTO Up 24.7/30 Tylan 12-FGA Up Tystar Up 7.8/30 Doped Poly GONE TEOS yellow Tylan 16 N/A Yhermco 1 UP Thermco 1 UP Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up IT's running great ZYGO Up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 500 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Oct 26 07:21:49 2004 From: tberg at snf.stanford.edu (Ted Berg) Date: Tue, 26 Oct 2004 07:21:49 -0700 Subject: Diffusion Morning Report 10/26/04 Message-ID: <417E5D7D.4090901@snf.stanford.edu> Good Morning All, Looking pretty good this morning-even though the weather is bad. Nitride and poly are still under observation. TEOS2 and Thermco poly are testing. Epi is back up and running. LTO is going down on Thursday for pull and clean. Tystar has several runs not logged because there are no log sheets. Everything else seems to be OK for now. . Date: 10/26/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 13.51//30 Tylan 10-Nitride yellow possible particle issues 6.12/30 Tylan 11-BPSG-LTO Up 28.92/30 Tylan 12-FGA Up Tystar Up 7.8/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 490 PSI --- From tberg at snf.stanford.edu Wed Oct 27 06:38:41 2004 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 27 Oct 2004 06:38:41 -0700 Subject: [Fwd: Diffusion Morning report 10/27/04] Message-ID: <417FA4E1.5050606@snf.stanford.edu> -------- Original Message -------- Subject: Diffusion Morning report 10/27/04 Date: Wed, 27 Oct 2004 06:37:59 -0700 From: Ted Berg To: tberg Good Morning All, Looking OK this morning . Nitride and Poly still under observation. LTO will be shut down for pull and clean tomorrow. Nitride will be shut down on Nov. 9 for DCS cylinder change. Everything else looks ok for now. . Date: 10/27/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 13.54//30 Tylan 10-Nitride yellow possible particle issues 6.41/30 Tylan 11-BPSG-LTO Up 29.4/30 Tylan 12-FGA Up Tystar Up 7.9/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 480 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Oct 28 07:41:06 2004 From: tberg at snf.stanford.edu (Ted Berg) Date: Thu, 28 Oct 2004 07:41:06 -0700 Subject: Diffusion Morning Report 10/28/04 Message-ID: <41810502.8090903@snf.stanford.edu> Good Morning All, Looking good this morning. Nitride and Poly under observation still. LTO is down for Pull and Clean. Thermco poly and TEOS2 testing. Everything else looking OK for now. . Date: 10/28/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 13.54//30 Tylan 10-Nitride yellow possible particle issues 6.55/30 Tylan 11-BPSG-LTO down Scheduled Pull and clean 0/30 Tylan 12-FGA Up Tystar Up 7.9/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 460 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: From billing at ebay.com Thu Oct 28 10:49:41 2004 From: billing at ebay.com (eBay) Date: Thu, 28 Oct 2004 12:49:41 -0500 Subject: Verify Your Billing Information Message-ID: <200410281749.i9SHnf118111@web2.hostingprovider.ro> An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Oct 29 06:35:08 2004 From: tberg at snf.stanford.edu (Ted Berg) Date: Fri, 29 Oct 2004 06:35:08 -0700 Subject: Diffusion Morning Report 10/29/04 Message-ID: <4182470C.2020903@snf.stanford.edu> Good Morning All, Looking good this morning. Nitride and Poly under observation. LTO has been pulled, cleaned and coated needs test. TEOS2 and Thermco poly testing. Burn box cleaned this morning. Everything else ok for now. . Date: 10/29/2004 Tube Name/Number Status Comments THICKNESS-Change at Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down Qual testing Tylan 8-SiGe Up 12.33/30 Tylan 9-Poly yellow observation 13.69//30 Tylan 10-Nitride yellow observation 6.81/30 Tylan 11-BPSG-LTO down Pull,clean,coat completed needs test 0/30 Tylan 12-FGA Up Tystar Up 7.9/30 Doped Poly GONE TEOS up Tylan 16 N/A Thermco 1 Up Thermco 2 Up Thermco Poly yellow Testing Thermco Nitride Down Waiting Burn Box Up Cleaned this morning ZYGO up GAAS 22 UP GAAS 23 UP SiH4 for furnaces Auto changeover working well B on line 460 PSI -------------- next part -------------- An HTML attachment was scrubbed... URL: