Diffusion Morning Report 08/24/05

Ted Berg tberg at snf.stanford.edu
Wed Aug 24 06:22:41 PDT 2005


Good Morning All,
    Looking good this morning the Thermco furnace has finally moved into 
the fab and hopefully we will be allowed to turn gases back on
after inspection today.  Everything else looks OK for now.

  	Date: 	8/24/2005 	THICKNESS-Change at
Tube Name/Number 	Status 	Comments 	 
Tylan 1 	Up 	  	 
Tylan 2 	Up 	  	 
Tylan 3 	Up 	  	 
Tylan 4 	Up 	  	 
Tylan 5-BBr3 	Down 	Bank 4 move 	 
Tylan 6-POCl3 	Down 	Bank 4 move 	 
Tylan 7-TEOS2 	Down 	Bank 4 move 	 
Tylan 8-SiGe 	Down 	Bank 4 move 	4.67/30
Tylan 9-Poly 	Down 	Bank 4 move 	18.94/30
Tylan 10-Nitride 	Down 	Bank 4 move 	10.29/30
Tylan 11-BPSG-LTO 	Down 	Bank 4 move 	5.41/30
Tylan 12-FGA 	Down 	Bank 4 move 	 
Tystar 	GONE 	Bank 4 move 	 
Doped Poly 	GONE 	Bank 4 move 	 
TEOS 	GONE 	Bank 4 move 	 
Tylan 16 	N/A 	  	 
Thermco 1 	Down 	Bank 4 move 	 
Thermco 2 	Down 	Bank 4 move 	 
Thermco Poly 	Down 	Bank 4 move 	 
Thermco Nitride 	Down 	Waiting 	 
  	  	  	 
Burn Box 	Up 	  	 
ZYGO 	up 	  	.
  	  	  	 
GAAS 22 	UP 	  	 
GAAS 23 	UP 	  	 
  	  	  	 


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20050824/1d757185/attachment.html>


More information about the diffusion mailing list