Diffusion Morning Report 12/12/05

Ted Berg tberg at snf.stanford.edu
Tue Dec 13 06:49:35 PST 2005


Good Morning All,
    Looking good this morning. Sige didn't vent -looking into it.  
Everything else looks OK for now.

  	Date: 	12/13/2005 	THICKNESS-Change at
Tube Name/Number 	Status 	Comments 	 
Tylan 1 	Up 	  	 
Tylan 2 	Up 	  	 
Tylan 3 	Up 	  	 
Tylan 4 	Up 	  	 
Tylan 5-BBr3 	Up 	  	 
Tylan 6-POCl3 	Up 	  	 
Tylan 7-TEOS2 	Up 	  	 
Tylan 8-SiGe 	yellow 	didn't vent 	13.4/30
Tylan 9-Poly 	Up 	  	1.18/30
Tylan 10-Nitride 	Up 	  	12.85/30 
Tylan 11-BPSG-LTO 	Up 	  	10.74/30
Tylan 12-FGA 	Up 	  	 
  	  	  	 
Thermco 1 	yellow 	problem with front zone temp 	 
Thermco 2 	Up 	  	 
Thermco Poly 	Up 	  	 
Thermco Nitride 	Down 	Testing 	 
  	  	  	 
Burn Box 	Up 	  	 
ZYGO 	up 	  	  
  	  	  	 
GAAS 22 	UP 	  	 
GAAS 23 	UP 	  	 
  	  	  	 
SiH4 for furnaces 	  	B on line 200 	 changeover working well 


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20051213/f6dd2b60/attachment.html>


More information about the diffusion mailing list