Diffusion Morning Report 02/08/05
Ted Berg
tberg at snf.stanford.edu
Tue Feb 8 06:34:18 PST 2005
Good Morning All,
Looking pretty good this morning. SiGe tube was changed due to
cracked sheaths, SiH4 MFC was changed. It will need a coat and test.
Epi is down again for safety B- looking into it. Ebeam is still in High
Vac and Paul J is working on it. Injector was changed on Tylan 1..
Everything else looks OK for now.
Date: 2/8/2005 THICKNESS-Change at
Tube Name/Number Status Comments
Tylan 1 Up
Tylan 2 Up
Tylan 3 Up
Tylan 4 Up
Tylan 5-BBr3 Up
Tylan 6-POCl3 Up
Tylan 7-TEOS2 down Qual testing
Tylan 8-SiGe down Tube pulled and MFC changed
0/30
Tylan 9-Poly Up 18.82/30
Tylan 10-Nitride Up 12.56/30
Tylan 11-BPSG-LTO Up 21.45/30
Tylan 12-FGA Up
Tystar yellow 3.73/30
Doped Poly GONE
TEOS up
Tylan 16 N/A
Thermco 1 Up
Thermco 2 Up
Thermco Poly yellow testing doped
Thermco Nitride Down Waiting
Burn Box Up
ZYGO up
GAAS 22 UP
GAAS 23 UP
SiH4 for furnaces Auto changeover working well A on line 460 PSI
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20050208/1bda52f7/attachment.html>
More information about the diffusion
mailing list