Diffusion Morning Report 02/11/05
Ted Berg
tberg at snf.stanford.edu
Fri Feb 11 06:35:45 PST 2005
Good Morning All,
Looking pretty good this morning. Epi is back up after brief
meltdown-thanks Mike. Sige still has some issues with flows. Burn box
cleaned this
morning. TEOS 2 and Thermco Poly Testing. Everything else looks OK
for now.
Date: 2/11/2005 THICKNESS-Change at
Tube Name/Number Status Comments
Tylan 1 Up
Tylan 2 Up
Tylan 3 Up
Tylan 4 Up
Tylan 5-BBr3 Up
Tylan 6-POCl3 Up
Tylan 7-TEOS2 down Qual testing
Tylan 8-SiGe down needs test-Flow issues
0/30
Tylan 9-Poly Up 19.5/30
Tylan 10-Nitride Up 12.6/30
Tylan 11-BPSG-LTO Up 22.58/30
Tylan 12-FGA Up
Tystar yellow 6.93/30
Doped Poly GONE
TEOS up
Tylan 16 N/A
Thermco 1 Up
Thermco 2 Up
Thermco Poly yellow testing doped
Thermco Nitride Down Waiting
Burn Box Up Cleaned this morning
ZYGO up
GAAS 22 UP
GAAS 23 UP
SiH4 for furnaces Auto changeover working well A on line 430 PSI
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20050211/1e4556bb/attachment.html>
More information about the diffusion
mailing list