Good Morning all,
Ted is out this morning. Everything looking pretty good this morning.
The burnbox was cleaned this morning. The Silane flow issue with SIGE
has been addressed, there was a flow error with the backfill on step 140
during yesterday's test. Have a safe holiday.
Diffusion Date: 2/18/2005
Tube Name/Number Status
Comments THICKNESS-Change at
Tylan 1 Up
Tylan 2 Up
Tylan 3 Up
Tylan 4 Up
Tylan 5-BBr3 Up
Tylan 6-POCl3 Up
Tylan 7-TEOS2 down Qual testing
Tylan 8-SiGe Yellow Gas flow
issues ?/30
Tylan 9-Poly
Up
21.25/30
Tylan 10-Nitride
Up
19.07/30
Tylan 11-BPSG-LTO
Up
27.06/30
Tylan 12-FGA Up
Tystar
Up
18.37/30
Doped Poly GONE
TEOS Up
Tylan 16 N/A
Yhermco 1 UP
Thermco 1 UP
Thermco Poly Yellow
Thermco Nitride Down Waiting
Burn Box Up
ZYGO Up
GAAS 22 UP
GAAS 23 UP
SiH4 for furnaces Auto
changeover working well A on line 330 PSI
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20050218/b9aba566/attachment.html>
More information about the diffusion
mailing list