Diffusion Morning Report 02/25/05
Ted Berg
tberg at snf.stanford.edu
Fri Feb 25 07:15:45 PST 2005
Good Morning All,
Looking Good this morning. LTO is going back together after pull
and clean. TEOS-replaced Throttle valve. Burn box cleaned this
morning. Everything else looking OK for now.
Date: 2/25/2005 THICKNESS-Change at
Tube Name/Number Status Comments
Tylan 1 Up
Tylan 2 Up
Tylan 3 Up
Tylan 4 Up
Tylan 5-BBr3 Up
Tylan 6-POCl3 Up
Tylan 7-TEOS2 down Qual testing
Tylan 8-SiGe Up .92/30
Tylan 9-Poly Up 21.81/30
Tylan 10-Nitride Up 22.47/30
Tylan 11-BPSG-LTO down pull and clean 0/30
Tylan 12-FGA Up
Tystar yellow 26.51/30
Doped Poly GONE
TEOS yellow Replaced Throttle valve
Tylan 16 N/A
Thermco 1 Up
Thermco 2 Up
Thermco Poly yellow testing doped
Thermco Nitride Down Waiting
Burn Box Up Cleaned this morning
ZYGO up
GAAS 22 UP
GAAS 23 UP
SiH4 for furnaces Auto changeover working well A on line 220 PSI
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20050225/5491dea0/attachment.html>
More information about the diffusion
mailing list