Good Morning all,
    Looking good this morning . LTO has a pumping problem-looking into 
it. SiGe is doing temp cal-very slowly.  Ebeam has a beam again.
Hitachi will be here Monday to make the system wonderful.  Burn box 
cleaned this morning.  Everything else looks OK for now. 

  	Date: 	3/11/2005 	THICKNESS-Change at
Tube Name/Number 	Status 	Comments 	 
Tylan 1 	Up 	  	 
Tylan 2 	Up 	  	 
Tylan 3 	Up 	  	 
Tylan 4 	Up 	  	 
Tylan 5-BBr3 	Up 	  	 
Tylan 6-POCl3 	Up 	  	 
Tylan 7-TEOS2 	down 	Qual testing 	 
Tylan 8-SiGe 	yellow 	Temp Stab Problem 	2.58/30
Tylan 9-Poly 	Up 	  	27.72/30
Tylan 10-Nitride 	Up 	  	24.2/30
Tylan 11-BPSG-LTO 	Down 	Won't pump down
	10.68/30
Tylan 12-FGA 	Up 	  	 
Tystar 	Up 	  	5.23/30
Doped Poly 	GONE 	  	 
TEOS 	yellow 	  	 
Tylan 16 	N/A 	  	 
Thermco 1 	Up 	  	 
Thermco 2 	Up 	  	 
Thermco Poly 	yellow 	testing doped 	 
Thermco Nitride 	Down 	Waiting 	 
  	  	  	 
Burn Box 	Up 	 Cleaned this morning
	 
ZYGO 	up 	  	 
  	  	  	 
GAAS 22 	UP 	  	 
GAAS 23 	UP 	  	 
  	  	  	 
SiH4 for furnaces 	  	Auto changeover working well  	B on line 700 PSI


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20050311/11b818df/attachment.html>


More information about the diffusion mailing list