From tberg at stanford.edu Tue Aug 1 06:40:36 2006 From: tberg at stanford.edu (Ted Berg) Date: Tue, 01 Aug 2006 06:40:36 -0700 Subject: Diffusion Morning Report 08/01/06 Message-ID: <44CF59D4.8020802@stanford.edu> Good Morning All, Happy August. Looking good this morning. Tylan 2 has TC issues-checking it out. Everything else looks OK for now. AMAT is supposed to have someone here this week to carry on. Diffusion Mike,Ray, Ted Date: 8/1/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 down tc problems Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 1.8/30 Tylan 8-SiGe yellow needs test 0/30 Tylan 9-Poly Up 19.22/30 Tylan 10-Nitride Up 20.59/30 Tylan 11-BPSG-LTO Up 23.19/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 740 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Wed Aug 2 06:45:12 2006 From: tberg at stanford.edu (Ted Berg) Date: Wed, 02 Aug 2006 06:45:12 -0700 Subject: Diffusion Morning Report 08/02/06 Message-ID: <44D0AC68.5090203@stanford.edu> Good Morning All, Looking OK this morning. THermco Poly has possible pressure control issues. LTO had a low dep rate. 2 more broken vacuum wands- WHY?? Whats going on with SiGe after all of the crying to get it back up?? Everything erlsew looks OK for now. Diffusion Mike,Ray, Ted Date: 8/2/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 1.8/30 Tylan 8-SiGe yellow needs test 0/30 Tylan 9-Poly Up 19.59/30 Tylan 10-Nitride Up 21.1/30 Tylan 11-BPSG-LTO yellow possible low dep rate 27.19/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly yellow pressure issue Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 670 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Thu Aug 3 06:28:20 2006 From: tberg at stanford.edu (Ted Berg) Date: Thu, 03 Aug 2006 06:28:20 -0700 Subject: Diffusion Morning Report 08/03/06 Message-ID: <44D1F9F4.7030905@stanford.edu> Good Morning All, Looking good this morning. Tylan 2 still needs a test after temperature fix. Thermco Poly has a broken TC sheath. No broken vacuum wands today. AMAT epi not moving. LTO going down on Monday for pull and clean. Diffusion Mike,Ray, Ted Date: 8/2/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 down Still needs test after temperature Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 1.8/30 Tylan 8-SiGe yellow needs test 0/30 Tylan 9-Poly Up 19.59/30 Tylan 10-Nitride Up 21.1/30 Tylan 11-BPSG-LTO Up 31.29/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly down Broken TC sheath Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 670 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Mon Aug 7 06:50:19 2006 From: tberg at stanford.edu (Ted Berg) Date: Mon, 07 Aug 2006 06:50:19 -0700 Subject: Diffusion Morning Report 08/07/06 Message-ID: <44D7451B.8040500@stanford.edu> Good Morning All, Looking good this morning. LTO is down for Pull and Clean. TEOS is down for ampule change. AMAT creeping along. Everything else looks OK for now. Diffusion Mike,Ray, Ted Date: 8/7/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down ampule change 1.8/30 Tylan 8-SiGe yellow needs test 0/30 Tylan 9-Poly Up 19.59/30 Tylan 10-Nitride Up 21.1/30 Tylan 11-BPSG-LTO down pull and clean 0/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 670 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Tue Aug 8 06:34:07 2006 From: tberg at stanford.edu (Ted Berg) Date: Tue, 08 Aug 2006 06:34:07 -0700 Subject: Diffusion Morning Report 08/08/06 Message-ID: <44D892CF.70109@stanford.edu> Good Morning All, Looking OK this morning. LTO is back up after P& C. Teos has dep issues, Nitride has dep issues. Operator could not load Polyemit. Everything else looks OK for now. Diffusion Mike,Ray, Ted Date: 8/8/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down no apparent dep 1.8/30 Tylan 8-SiGe Up 1.2/30 Tylan 9-Poly Up 19.91/30 Tylan 10-Nitride yellow low dep 21.59/30 Tylan 11-BPSG-LTO up .18/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 660 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Wed Aug 9 06:28:43 2006 From: tberg at stanford.edu (Ted Berg) Date: Wed, 09 Aug 2006 06:28:43 -0700 Subject: Diffusion Morning Report 08/09/06 Message-ID: <44D9E30B.2040507@stanford.edu> Good Morning All, Looking good this Morning. Teos still needs a test. Everything else looks OK for now. AMAT Epi permit is almost completed final inspection today. Startup moving along again. Diffusion Mike,Ray, Ted Date: 8/9/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down no apparent dep 8.8/30 Tylan 8-SiGe Up 1.2/30 Tylan 9-Poly Up 20.17/30 Tylan 10-Nitride Up 21.7/30 Tylan 11-BPSG-LTO up .38/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 660 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Thu Aug 10 06:37:38 2006 From: tberg at stanford.edu (Ted Berg) Date: Thu, 10 Aug 2006 06:37:38 -0700 Subject: Diffusion Morning Report 08/10/06 Message-ID: <44DB36A2.2030608@stanford.edu> Good Morning All, Looking OK this morning. Ebeam is down hard system will not reboot. Epi has wafer stuck inside. TEOS test needs evaluation. AMAT epi moving Ahead again. Everything else looks OK for now. Diffusion Mike,Ray, Ted Date: 8/9/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 down no apparent dep 8.8/30 Tylan 8-SiGe Up 1.55/30 Tylan 9-Poly Up 20.32/30 Tylan 10-Nitride Up 21.7/30 Tylan 11-BPSG-LTO up .7/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi down wafer stuck Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 660 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Fri Aug 11 07:20:28 2006 From: tberg at stanford.edu (Ted Berg) Date: Fri, 11 Aug 2006 07:20:28 -0700 Subject: Diffusion Morning Report 08/11/06 Message-ID: <44DC922C.1050104@stanford.edu> Good Morning All, Looking good this morning. No major problems other than The SRD flood. AMAT startup moving ahead. Diffusion Mike,Ray, Ted Date: 8/11/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.8/30 Tylan 8-SiGe Up 1.55/30 Tylan 9-Poly Up 20.32/30 Tylan 10-Nitride Up 21.7/30 Tylan 11-BPSG-LTO up 5.4/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up Cleaned this morning ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 640 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Mon Aug 14 07:45:16 2006 From: tberg at stanford.edu (Ted Berg) Date: Mon, 14 Aug 2006 07:45:16 -0700 Subject: DEKTAKS Message-ID: <44E08C7C.7040604@stanford.edu> Hello All, JUst wanted feedback on issues with the dektaks. FS will be in this week to work on them. Any issues or problems we will try and address them While he is here. I suppose you all noticed the alpha step is in the position where the gold dektak was. From tberg at stanford.edu Mon Aug 14 07:35:59 2006 From: tberg at stanford.edu (Ted Berg) Date: Mon, 14 Aug 2006 07:35:59 -0700 Subject: Diffusion Morning Report 08/14/06 Message-ID: <44E08A4F.3080309@stanford.edu> Good Morning All, Looking good this morning. Got ebeam back in high vac and checked beam OK. GeH4 back on for Epi. No Other major issues in the area. AMAT Epi moving along. Diffusion Mike,Ray, Ted Date: 8/14/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.8/30 Tylan 8-SiGe Up 2.74/30 Tylan 9-Poly Up 21.3/30 Tylan 10-Nitride Up 21.7/30 Tylan 11-BPSG-LTO up 6.4/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 620 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Tue Aug 15 06:38:48 2006 From: tberg at stanford.edu (Ted Berg) Date: Tue, 15 Aug 2006 06:38:48 -0700 Subject: Diffusion Morning Report 08/15/06 Message-ID: <44E1CE68.2060400@stanford.edu> Good morning all, Looking Good this morning. Epi has a wafer stuck in the chamber. Everythingelse is OK for now, Amat epi moving along. Diffusion Mike,Ray, Ted Date: 8/15/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.8/30 Tylan 8-SiGe Up 2.92/30 Tylan 9-Poly Up 21.3/30 Tylan 10-Nitride Up 22.4/30 Tylan 11-BPSG-LTO up 7.76/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi down Wafer stuck in chamber Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 620 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Wed Aug 16 06:46:35 2006 From: tberg at stanford.edu (Ted Berg) Date: Wed, 16 Aug 2006 06:46:35 -0700 Subject: Diffusion Morning report 08/16/06 Message-ID: <44E321BB.5000202@stanford.edu> Good Morning All, Looking good this morning. Epi has exhaust issues. AMAT epi moving ahead. No Other issues at this time. Diffusion Mike,Ray, Ted Date: 8/16/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.8/30 Tylan 8-SiGe Up 3.58/30 Tylan 9-Poly Up 21.3/30 Tylan 10-Nitride Up 22.4/30 Tylan 11-BPSG-LTO up 8.47/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi down Exhaust issues Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 610 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Thu Aug 17 06:23:58 2006 From: tberg at stanford.edu (Ted Berg) Date: Thu, 17 Aug 2006 06:23:58 -0700 Subject: Diffusion Morning Report 08/17/06 Message-ID: <44E46DEE.3040904@stanford.edu> Good Morning All, Looking good this morning. Epi has wafers stuck in Load Lock. No other problems at this time. AMAT Epi Moving along slowly. Diffusion Mike,Ray, Ted Date: 8/17/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 3.86/30 Tylan 9-Poly Up 22/30 Tylan 10-Nitride Up 22.4/30 Tylan 11-BPSG-LTO up 8.49/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi yellow wafers in ll Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 590 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Fri Aug 18 06:26:09 2006 From: tberg at stanford.edu (Ted Berg) Date: Fri, 18 Aug 2006 06:26:09 -0700 Subject: Diffusion Morning Report 08/18/06 Message-ID: <44E5BFF1.3000100@stanford.edu> Good Morning All, Looking good this morning. No Major problems at this time. Burn box cleaned this morning. AMAT epi moving ahead. Diffusion Mike,Ray, Ted Date: 8/18/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 3.88/30 Tylan 9-Poly Up 22.16/30 Tylan 10-Nitride Up 22.4/30 Tylan 11-BPSG-LTO up 9.19/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi yellow Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 590 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Mon Aug 21 06:35:56 2006 From: tberg at stanford.edu (Ted Berg) Date: Mon, 21 Aug 2006 06:35:56 -0700 Subject: Diffusion Morning Report 08/21/06 Message-ID: <44E9B6BC.1080804@stanford.edu> Good Morning All, Looking OK this morning. Lto has a door opening issue. Epi is on leak check from last Friday's leak. Everything else looks OK for now. Diffusion Mike,Ray, Ted Date: 8/21/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 4.18/30 Tylan 9-Poly Up 22.7/30 Tylan 10-Nitride Up 22.6/30 Tylan 11-BPSG-LTO yellow door issue 9.53/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi down hcl leak in cabinet Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 590 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Tue Aug 22 06:22:47 2006 From: tberg at stanford.edu (Ted Berg) Date: Tue, 22 Aug 2006 06:22:47 -0700 Subject: Diffusion Morning Report 08/22/06 Message-ID: <44EB0527.1050601@stanford.edu> Good Morning All, Looking OK this morning. Epi Still down for HCl issues. No other major issues at this time.AMAT Epi Moving along slowly. Diffusion Mike,Ray, Ted Date: 8/22/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 4.2/30 Tylan 9-Poly Up 22.7/30 Tylan 10-Nitride Up 22.6/30 Tylan 11-BPSG-LTO Up 12.07/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi down hcl leak in cabinet Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 570 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From eBay-US.475053668.279137.4.ebay.com at plfiles.plfiles Tue Aug 22 17:27:58 2006 From: eBay-US.475053668.279137.4.ebay.com at plfiles.plfiles (eBay member terridawnn) Date: Tue, 22 Aug 2006 17:27:58 -0700 (PDT) Subject: Unpaid Item Reminder: #6888090768 Message-ID: <1156292878.15745.qmail@ebay.com> An HTML attachment was scrubbed... URL: From security.com at plfiles.plfiles Tue Aug 22 19:59:48 2006 From: security.com at plfiles.plfiles (PayPal Customer Support) Date: Tue, 22 Aug 2006 19:59:48 -0700 (PDT) Subject: PayPal Security Center Message-ID: <1156301988.15745.qmail@paypal.com> An HTML attachment was scrubbed... URL: From tberg at stanford.edu Wed Aug 23 08:24:07 2006 From: tberg at stanford.edu (Ted Berg) Date: Wed, 23 Aug 2006 08:24:07 -0700 Subject: Diffusion Morning Report 08/23/06 Message-ID: <44EC7317.2060000@stanford.edu> Good Morning All, Looking OK this Morning. Bside Epi HCl is on line. Changed TLC on Tylan 3. Hitachi is coming in today to look at 4160 photo issues. Everything else looks OK for now. Nitride going down tomorrow for pull and clean. AMAT epi idling not moving ahead. Diffusion Mike,Ray, Ted Date: 8/23/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 4.31/30 Tylan 9-Poly Up 22.7/30 Tylan 10-Nitride Up 22.6/30 Tylan 11-BPSG-LTO Up 13.35/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 560 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Thu Aug 24 06:38:44 2006 From: tberg at stanford.edu (Ted Berg) Date: Thu, 24 Aug 2006 06:38:44 -0700 Subject: Diffusion Morning Report 08/24/06 Message-ID: <44EDABE4.5010206@stanford.edu> Good Morning All, Looking Good this morning. Nitride down for scheduled Pull and clean. FS worked on 4160 for several hours yesterday trying to get Polaroid to work. AMAT Epi crawling along. No other problems at this time. Diffusion Mike,Ray, Ted Date: 8/24/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 4.57/30 Tylan 9-Poly Up 23.76/30 Tylan 10-Nitride Up 22.6/30 Tylan 11-BPSG-LTO Up 13.35/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 560 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From nanotech at nsti.org Thu Aug 24 07:13:07 2006 From: nanotech at nsti.org (Nanotech for Investors Summit) Date: Thu, 24 Aug 2006 07:13:07 -0700 Subject: 3rd Bi-Annual Summit - Zurich September 11 Message-ID: Nanotech for Investors 3rd Bi-Annual Summit September 11th 2006 Park Hyatt Hotel Beethovenstrasse 21, 8002 Zurich, Switzerland http://www.nanoforinv.com Global Investment Opportunities & Market Impact =============================================== The Third Bi-Annual Nanotech for Investors Summit brings together leading industry investors with top business and technology executives of nanotechnology growth companies. This intimate, executive-level event will provide an open and frank dialogue covering a financially-based outlook of how nanotechnology is, and will be, impacting global investments across various markets. Gain the foresight from world leaders to see where the opportunities and risks lie in the future. Jointly hosted by NanoDimension, a leading global venture capital firm in nanotechnology, and the Nano Science and Technology Institute, the largest industry and scientific organization focused exclusively on nanotechnology and organizer of the largest nanotechnology event in the United States. Speakers Include: ================= -Aymeric Sallin Founding & Managing Partner, NanoDimension AG -Alexandre Gauthier-Jaques Director, UBS Wealth Management -Sassan Zaker First Vice President, Bank Julius B?r -Tapesh Yadav Founder, Nanoproducts Corporation -Christopher Moore Chairman, Oxonica -Ayodhya Tiwari Chairman & CTO, FLISOM -Del Stark CEO, European Nanotechnology Trade Alliance (ENTA) -Jean-Pierre Braun Founder, CEO and Board Member, Crocus Technology SA -Antje Grobe Head of Division Nanotechnology, Risk-Dialogue Foundation Who Should Attend ================= Nanotech for Investors Summit provides institutional and private investors with an overview of investment opportunities available on the market today and to define investment guidelines in the field of nanotechnology. Financial Industry Executives, Fund Managers, Investors and Analysts interested in how nanotechnology will be changing their markets on a short and long-term basis are invited to participate. Register by September 1, and save! http://www.nsti.org/NanoInvestor2006/register.html Sponsors ======== Deutsche Borse Group Greater Zurich Area Executive Producers =================== NanoDimension Nano Science and Technolog Institute Supporting Organizations ======================== BusinessWire Swiss Financial Analysts Association NanoEurope The European Nanotechnology Trade Alliance ------------------------------------------- Nanotech for Investors 3rd Bi-Annual Summit September 11th 2006 Park Hyatt Hotel Beethovenstrasse 21, 8002 Zurich, Switzerland http://www.nanoforinv.com --- You are currently subscribed to nanotech as: diffusion at snf.stanford.edu To unsubscribe send a blank email to leave-nanotech-6754768W at spirit.sparklist.com -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Fri Aug 25 06:37:35 2006 From: tberg at stanford.edu (Ted Berg) Date: Fri, 25 Aug 2006 06:37:35 -0700 Subject: Diffusion Morning Report 08/25/06 Message-ID: <44EEFD1F.2060207@stanford.edu> Good Morning All, Looking good this morning. Nitride is still down for pull and clean. Tyhermco Poly is back up after TC sheath change. No other problems at this time. Diffusion Mike,Ray, Ted Date: 8/25/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 4.57/30 Tylan 9-Poly Up 23.76/30 Tylan 10-Nitride down pull and clean 0/30 Tylan 11-BPSG-LTO Up 14.49/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 550 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From nanotech at nsti.org Fri Aug 25 06:50:21 2006 From: nanotech at nsti.org (Nano World News) Date: Fri, 25 Aug 2006 06:50:21 -0700 Subject: Nano World News August 2006 Message-ID: An HTML attachment was scrubbed... URL: From tberg at stanford.edu Mon Aug 28 07:44:54 2006 From: tberg at stanford.edu (Ted Berg) Date: Mon, 28 Aug 2006 07:44:54 -0700 Subject: Diffusion Morning Report 08/28/06 Message-ID: <44F30166.8050005@stanford.edu> Good Morning All, Looking good this morning . Nitride is back together and needs a coat and test after pull and clean. No Other Major problems at this time. Diffusion Mike,Ray, Ted Date: 8/28/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 4.57/30 Tylan 9-Poly Up 24.21/30 Tylan 10-Nitride down pull and clean done needs coat 0/30 Tylan 11-BPSG-LTO Up 14.49/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 550 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Tue Aug 29 06:52:34 2006 From: tberg at stanford.edu (Ted Berg) Date: Tue, 29 Aug 2006 06:52:34 -0700 Subject: Diffusion Morning Report 08/29/06 Message-ID: <44F446A2.7030809@stanford.edu> Good Morning All, Looking good this morning. Removed wafer stuck in Epi chamber, Nitride is back up after pull and clean. No other major problems at this time. AMAT wizzard is supposed to be here today to continue with startup. Diffusion Mike,Ray, Ted Date: 8/29/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 5.45/30 Tylan 9-Poly Up 23.86/30 Tylan 10-Nitride Up 0/30 Tylan 11-BPSG-LTO Up 15.5/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up removed wafer from chamber Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 550 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Thu Aug 31 07:38:51 2006 From: tberg at stanford.edu (Ted Berg) Date: Thu, 31 Aug 2006 07:38:51 -0700 Subject: Diffusion Morning Report 08/31/06 Message-ID: <44F6F47B.2070304@stanford.edu> Good Morning All, Looking good this morning. No Major problems at this time. AMAT Epi not Moving ahead. Diffusion Mike,Ray, Ted Date: 8/31/06 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up 8.41/30 Tylan 8-SiGe Up 5.45/30 Tylan 9-Poly Up 23.86/30 Tylan 10-Nitride Up .68/30 Tylan 11-BPSG-LTO Up 19.88/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Up Epi Up Burn Box ZYGO Up up GAAS 22 GAAS 23 UP SiH4 for furnaces up B on line 550 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: