    Looking good this morning. Still working on Epi- we may have FS 
today. Burn box cleaned this morning. . AMAT wafers being evaluated.
TEL first quote in and PO in progress. Image capture for SEM waiting 
Quote. No other issues at this time.

Diffusion 	  	  	  	  	 
  	Date: 	12/8/06 	THICKNESS-Change at 	  	 
Tube Name/Number 	Status 	Comments 	  	  	 
Tylan 1 	Up 	  	  	  	 
Tylan 2 	Up 	  	  	  	 
Tylan 3 	Up 	  	  	  	 
Tylan 4 	Up 	  	  	  	 
Tylan 5-BBr3 	Up 	  	  	  	 
Tylan 6-POCl3 	Up 	  	  	  	 
Tylan 7-TEOS2 	Up 	  	9.25/30 	  	 
Tylan 8-SiGe 	Up 	  	9.48/30 	  	 
Tylan 9-Poly 	Up 	  	18.78/30 	  	 
Tylan 10-Nitride 	Up 	  	27.49/30 	  	 
Tylan 11-BPSG-LTO 	UP 	  	28.63/30 	  	 
Tylan 12-FGA 	Up 	  	  	  	 
  	  	  	  	  	 
Thermco 1 	Up 	  	  	  	 
Thermco 2 	Up 	  	  	  	 
Thermco Poly 	Up 	  	  	  	 
Thermco Nitride 	Up 	  	  	  	 
Epi 	down 	leak testing 	  	  	 
  	
	
	
	
	
Burn Box 	up 	  	  	  	 
ZYGO 	Up 	  	  	  	 
  	up 	  	   	  	 
GAAS 22 	  	  	  	  	 
GAAS 23 	UP 	  	  	  	 
SiH4 for furnaces 	up 	  	  	  	 

	  	A on line 540 psi 	 changeover working well  	  	 


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20061208/a9c25cf5/attachment.html>


More information about the diffusion mailing list