From tberg at snf.stanford.edu Wed Feb 1 06:33:46 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 01 Feb 2006 06:33:46 -0800 Subject: Diffusion Morning Report 02/01/06 Message-ID: <43E0C6CA.3070507@snf.stanford.edu> Good Morning All, Looking good this morning. LTO is back up with new style boats. Nitride is down for pull and clean. Second FGA tube should be back up today after quartz repair. Everything else looks OK for now. Date: 2/1/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 15.7/30 Tylan 9-Poly Up 2.42/30 Tylan 10-Nitride Down pull and clean 0/30 Tylan 11-BPSG-LTO up ok with new boats 0/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 down Broken elephant & tube SiH4 for furnaces A on line 330 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Feb 2 07:04:58 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Thu, 02 Feb 2006 07:04:58 -0800 Subject: Diffusion Morning Report 02/02/06 Message-ID: <43E21F9A.1030002@snf.stanford.edu> Good Morning All, Looking good this morning. LTO is back up with new boats better than ever. Nitride has been pulled and cleaned needs a test. Second FGA tube is back up after quartz repairs. Everything else looks OK for now. Date: 2/2/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 15.7/30 Tylan 9-Poly Up 2.42/30 Tylan 10-Nitride Down pull and clean done needs test 0/30 Tylan 11-BPSG-LTO up 2.14/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up quartz repaired SiH4 for furnaces A on line 330 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Feb 3 06:40:09 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Fri, 03 Feb 2006 06:40:09 -0800 Subject: Diffusion Morning report 02/03/06 Message-ID: <43E36B49.3030800@snf.stanford.edu> Good Morning All, Looking good this morning. Nitride is back up after clean. Thermco 1 has a low dep rate-possible torch issue. HCL leak check was good so we will switch cylinders today. Everything else looks ok for now. Date: 2/3/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 15.7/30 Tylan 9-Poly Up 2.42/30 Tylan 10-Nitride Up .075/30 Tylan 11-BPSG-LTO up 2.42/30 Tylan 12-FGA Up Thermco 1 Down torch problem? Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up Cleaned this morning ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 330 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Feb 6 07:47:04 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Mon, 06 Feb 2006 07:47:04 -0800 Subject: Diffusion Morning Report 02/06/06 Message-ID: <43E76F78.10807@snf.stanford.edu> Good Morning All, Looking ok this morning. Addressed several issues from over the weekend tylan 1 and nitride door. Reset Epi doing leak check now. Several small problems. Everything else looks OK for now. Date: 2/6/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Checked out door issue Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 15.7/30 Tylan 9-Poly Up 4.2/30 Tylan 10-Nitride Up Adjusted door-observing 2.09/30 Tylan 11-BPSG-LTO up 4.02/30 Tylan 12-FGA Up Thermco 1 Down torch problem? Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 330 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From nanotech at nsti.org Mon Feb 6 10:19:14 2006 From: nanotech at nsti.org (NSTI Nanotech Ventures) Date: Mon, 6 Feb 2006 10:19:14 -0800 Subject: NSTI Nanotech Ventures 2006 - Call for Participation Message-ID: NSTI Nanotech Ventures 2006 May 7 ? 11, 2006 Hynes Convention Center Boston, Massachusetts, U.S.A. http://www.nsti.org/Nanotech2006/Development/ventures.html About NSTI Nanotech Ventures An ideal forum for ?seed? to ?early-stage? companies to showcase their technologies, market advantages, and to search for funding. Selected companies give 15 minute presentations, and benefit from on-site networking with the NSTI Nanotech Ventures Vetting Team, corporate capital, venture capital and multi-sector investment attendees. Join the Nanotech Ventures community in participating in the world?s largest nanotechnology venture forum. Important Dates Conference: May 7-11, 2006, Boston MA, USA Submission date: March 3rd, 2006 Notification date: March 17th, 2006 How To Participate: Submit an executive summary of your company for review by the NSTI-NIR team: http://www.nsti.org/Nanotech2006/Development/ventures.html --- You are currently subscribed to nanotech as: diffusion at snf.stanford.edu To unsubscribe send a blank email to leave-nanotech-6754768W at spirit.sparklist.com -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Feb 7 06:41:55 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Tue, 07 Feb 2006 06:41:55 -0800 Subject: Diffusion Morning Report 02/07/06 Message-ID: <43E8B1B3.5020902@snf.stanford.edu> Good morning All, Looking good this morning Thermco 1 still has a torch problem. SEMhitachi has a possible vacuum issue. 2nd set of new boats installed in LTO. Everything else looks OK for now. Date: 2/7/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 15.7/30 Tylan 9-Poly Up 4.17/30 Tylan 10-Nitride Up 2.09/30 Tylan 11-BPSG-LTO up 4.52/30 Tylan 12-FGA Up Thermco 1 Down torch problem? Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 330 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Feb 8 06:32:06 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 08 Feb 2006 06:32:06 -0800 Subject: Diffusion Morning Report 02/08/06 Message-ID: <43EA00E6.4060406@snf.stanford.edu> Good Morning All, Looking good this morning. Some complaints about Epi base pressure but people are still using it non-stop so it is impossible to address the vacuum issues. Still investigating the low dep issues on Thermco1. Everything else looks OK for now. Date: 2/8/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 15.7/30 Tylan 9-Poly Up 8.96/30 Tylan 10-Nitride Up 2.17/30 Tylan 11-BPSG-LTO up 7.48/30 Tylan 12-FGA Up Thermco 1 Down torch problem? Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 330 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Feb 9 07:47:48 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Thu, 09 Feb 2006 07:47:48 -0800 Subject: Diffusion Morning Report 02/09/06 Message-ID: <43EB6424.10801@snf.stanford.edu> Good Morning All, Looking good thid morning. Epi pressure and leak rate are good-observing HCl panel. Checking out low dep rate on Thermco1. LTO and Poly- long Deps. Everything else looks OK for now. Date: 2/9/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 15.7/30 Tylan 9-Poly Up 8.96/30 Tylan 10-Nitride Up 2.17/30 Tylan 11-BPSG-LTO up 7.48/30 Tylan 12-FGA Up Thermco 1 Down torch problem? Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 260 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Feb 10 06:30:38 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Fri, 10 Feb 2006 06:30:38 -0800 Subject: Diffusion Morning Report 02/10/06 Message-ID: <43ECA38E.8080706@snf.stanford.edu> Good Morning All, Looking good this morning . Epi is back up. Looking into low dep on Thermco 1. Everything else looks OK for now. Date: 2/10/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 15.7/30 Tylan 9-Poly Up 13.5/30 Tylan 10-Nitride Up 2.17/30 Tylan 11-BPSG-LTO up 11.52/30 Tylan 12-FGA Up Thermco 1 Down torch problem? Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up Cleaned this morning ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 260 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Feb 13 06:50:30 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Mon, 13 Feb 2006 06:50:30 -0800 Subject: Diffusion Morning Report 02/13/06 Message-ID: <43F09CB6.4060701@snf.stanford.edu> Good Morning All, Looking fair this morning. Quite a few problems over the weekend. Epis pump was off -low oil, TEOS ampule needs changing, Torch on Tylan 3 replaced-bad uniformity, Tylan 1 had TCU error-testing, Tylan2 had MFS error-testing. Everything else looks OK for now. Date: 2/11/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 yellow Had TCU error Tylan 2 yellow Had MFS alarm Tylan 3 yellow bad uniformity-changing torch Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Down teos change Tylan 8-SiGe Up 16.46/30 Tylan 9-Poly Up 16.67/30 Tylan 10-Nitride Up 2.17/30 Tylan 11-BPSG-LTO up 12.81/30 Tylan 12-FGA Up Thermco 1 Down torch problem? Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 250 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Feb 14 06:37:24 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Tue, 14 Feb 2006 06:37:24 -0800 Subject: Diffusion Morning Report 02/14/06 Message-ID: <43F1EB24.3000809@snf.stanford.edu> Good Morning All, Happy Valentines Day. Looking pretty good this morning. Tylan Nitride has door close issues. Waiting test results on Tylan 3 after injector change. Thermco 1 has torch/growth rate issues. Everything else looks OK for now. Date: 2/14/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 yellow injector changed-need test results Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up teos changed Tylan 8-SiGe Up 16.46/30 Tylan 9-Poly Up 16.68/30 Tylan 10-Nitride yellow door issue 2.52/30 Tylan 11-BPSG-LTO up 13.65/30 Tylan 12-FGA Up Thermco 1 Down torch problem? Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 240 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Feb 15 07:00:49 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 15 Feb 2006 07:00:49 -0800 Subject: Diffusion Morning Report 02/15/06 Message-ID: <43F34221.6010900@snf.stanford.edu> Good Morning All, Looking OK this morning. TEOS2 is out of TEOS after only 2 days. TYlan3 still has uniformity issues-checking it out. Thermco1 is back after MFC change and ratio adjustment. Looking into Poly loader and Nitride door issues. Everything else is OK for now. Date: 2/15/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 yellow checking uniformity issues Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Down TEOS empty after 2 days Tylan 8-SiGe Up 16.8/30 Tylan 9-Poly Up 16.86/30 Tylan 10-Nitride yellow door issue 3.83/30 Tylan 11-BPSG-LTO up 15.055/30 Tylan 12-FGA Up Thermco 1 Up replaced mfc Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 220 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From summit at techconnect.org Thu Feb 16 07:15:28 2006 From: summit at techconnect.org (Tech Connect Summit) Date: Thu, 16 Feb 2006 07:15:28 -0800 Subject: TechConnect Summit 2006 - Invitation to Participate Message-ID: TechConnect Summit 2006 May 8-9 2006, Boston, Massachusetts Hynes Convention Center www.TechConnect.org/Summit2006/ In Partnership with Nanotech 2006 Join 300 Exhibitors & 3,000 Attendees Present your IP or Venture to the World?s Top Corporations and Investors. Proposals Due: March 3, 2006 TechConnect Summit features the leading IP and Early Stage Ventures across multiple industries and disciplines from around the world, and provides an interactive forum for the business community to connect with the world?s leading technology providers and most promising technology start-ups. To participate, please visit: www.TechConnect.org/Summit2006/ --- You are currently subscribed to nanotech as: diffusion at snf.stanford.edu To unsubscribe send a blank email to leave-nanotech-6754768W at spirit.sparklist.com -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Feb 16 09:32:16 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Thu, 16 Feb 2006 09:32:16 -0800 Subject: Diffusion Morning Report 02/16/06 Message-ID: <43F4B720.7060805@snf.stanford.edu> Good Morning All, Looking Fair this morning. Changed HCl cylinder for Epi, Replaced bad bearings on Poly. Looks like there may be a further problem with poly/. Everything else looks OK for now. Date: 2/16/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 yellow checking uniformity issues Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 17.34/30 Tylan 9-Poly Down bad bearings 17.21/30 Tylan 10-Nitride yellow door issue 5.83/30 Tylan 11-BPSG-LTO up 18.13/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 220 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From seymour at snf.stanford.edu Fri Feb 17 08:19:29 2006 From: seymour at snf.stanford.edu (Raymond Seymour) Date: Fri, 17 Feb 2006 08:19:29 -0800 Subject: Diffusion Morning Report Message-ID: <001201c633dd$ee05bbe0$9a6540ab@bigvtwin> Morning all, Mike is working on the door seal for nitride. Poly needs a test after pull and clean. Epi needs HCL flow3d through the tool for a short period after cylinder change. Burnbox for LPCVD's cleaned this morning. And Teos source is in the process of being replaced. Date: 2/17/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 17.34/30 Tylan 9-Poly Down bad bearings 0/30 Tylan 10-Nitride yellow door issue 5.84/30 Tylan 11-BPSG-LTO up 18.63/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 200 -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Feb 21 07:19:56 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Tue, 21 Feb 2006 07:19:56 -0800 Subject: Diffusion Morning Report 02/21/06 Message-ID: <43FB2F9C.70404@snf.stanford.edu> Good Morning All, Looking OK this morning. SiGe is down for pump replacement. Forming gas for Second forming gas tube is empty. HCl for epi needs change. Poly has high base pressure-looking into it. Date: 2/21/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Down Pump bad 17.34/30 Tylan 9-Poly yellow high pressure 3.5/30 Tylan 10-Nitride Up 6.73/30 Tylan 11-BPSG-LTO up 24/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 down forming gas empty SiH4 for furnaces A on line 180 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Feb 22 06:46:19 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 22 Feb 2006 06:46:19 -0800 Subject: Diffusion Morning Report 02/22/06 Message-ID: <43FC793B.8010008@snf.stanford.edu> Good Morning All, Looking pretty good this morning. Tylan 1 needs fan on 460 replaced. Poly needs a test after the leak repair. FGA cylinder on order. Everything else looks OK for now. Date: 2/22/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Down 460 fan needs to be replaced Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 17.34/30 Tylan 9-Poly yellow needs test 0/30 Tylan 10-Nitride Up 6.73/30 Tylan 11-BPSG-LTO up 24.4/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 down forming gas empty SiH4 for furnaces A on line 180 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Feb 23 07:33:42 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Thu, 23 Feb 2006 07:33:42 -0800 Subject: Diffusion Morning Report 02/23/06 Message-ID: <43FDD5D6.7030805@snf.stanford.edu> Good Morning All, Looking OK this morning. LTO looks like pump is dead. Tylan 1 had a thin coating- looking into it. Everything else is ok for now. Date: 2/23/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 yellow thin dep Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 17.34/30 Tylan 9-Poly Up .15/30 Tylan 10-Nitride Up 7.93/30 Tylan 11-BPSG-LTO Down pump dead 25.93/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up ZYGO up GAAS 22 UP GAAS 23 down forming gas empty SiH4 for furnaces A on line 180 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Feb 24 07:48:45 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Fri, 24 Feb 2006 07:48:45 -0800 Subject: Diffusion Morning Report 02/24/06 Message-ID: <43FF2ADD.9030400@snf.stanford.edu> Good Morning all, Looking Ok this morning.HCL for epi is empty again-changing cylinders. BPSG is getting close to tube pull. HCl switched to A side. Burn box cleaned this morning Everything else looks OK for now. Date: 2/24/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 18.2/30 Tylan 9-Poly Up 2.25.15/30 Tylan 10-Nitride Up 8.24/30 Tylan 11-BPSG-LTO Up 26.16/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Burn Box Up cleaned this morning ZYGO up GAAS 22 UP GAAS 23 down forming gas empty SiH4 for furnaces A on line 180 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From nanotech at nsti.org Fri Feb 24 10:15:17 2006 From: nanotech at nsti.org (Nano World News) Date: Fri, 24 Feb 2006 10:15:17 -0800 Subject: Nano World News February 2006 Message-ID: An HTML attachment was scrubbed... URL: From chenjiadin at 21cn.com Sun Feb 26 11:25:17 2006 From: chenjiadin at 21cn.com (=?GB2312?B?bG9uZ21pbmdodWk=?=) Date: Mon, 27 Feb 2006 03:25:17 +0800 Subject: =?GB2312?B?QW4gb3BlbiBsZXR0ZXIgdG8gQW1lcmljYW4gUHJlc2lkZW50IE1yLiBCdXNoICC+tNbCw8C5+tfczbOyvMqyz8jJ+rXEuau/qtDF?= Message-ID: <0012224137$85556343$55722864@21cn.com> An open letter to American President Mr. Bush ?????????????? Explanation: Du Pont Chemical Company of the United State has for several times required to submit the dispute between it and our side to an arbitration organization. Respecting the requirement of Du Pont, we sent a version of ?Arbitration Agreement? in a registered letter to Du Pont on January 16, 2006, with an enclosure saying if Du Pont raises no objections, we will appreciate it if Du Pont sign and affix its seal to the agreement and mail the rest two copies back to us in 30 days. If Du Pont has objections, it may produce a version of its own. Meanwhile, we have sent the ?Arbitration Agreement? and an enclosure letter by e-mail to info.china at chn.dupont.com and info at dupont.com 24 times on January 26, February 6, February 10 and February 15, 2006 respectively. Now more than 30 days have passed, far exceeding the time that needs for finding proof and making a decision, and we have received no reply. This is most likely another trick played by Du Pont for the purpose of repudiating its debt. We therefore send this e-mail and ask for your pardon if it does any convenience to you. If possible, we request you tell Du Pont not to play this kind of trick any more. (As many people with the public relations department of the Du Pont Chemical Company excel at Chinese, the registered letter and e-mail we have sent are not translated into English.) IMPUDENT, SCOUNDREL, DuPont of the United States!??????????????! IMPUDENT, SCOUNDREL, CEO of DuPont Holliday ! DuPont Co. and its CEO Holliday are transnational scoundrel! Without open objection, DuPont is openly admitting itself to be a transnational scoundrel! We firmly believe that the United State is not a country that shields and connives at rascals and the American government is not a government that shields and connives at rascals! We request the American government actions to intensify the law enforcement strength to protect intellectual property rights,force transnational scoundrel DuPont to carry out it?s voluntarily promised obligations in the agreement. ************************************************************************************************* Hello, my respectable President Mr. Bush: The fact that DuPont declined to fulfill the agreement has been presented to you for several times via president at whitehouse.gov; As a result, president at whitehouse.gov sent back three letters containing the following same contents on the behalf of Mr. President in Sep 2004:?Thank you for e-mailing President Bush. Your ideas and comments are very important to him.? My ?ideas and comments? are as follows: it is verified by Mr. Huang with adequate facts and irrefutable legal evidences that DuPont must disburse Mr. Huang patent fee, license fee or equivalent ?Utter Compensation? fee and DuPont?s persistent refusal to disburse these fees infringes upon the intellectual property rights of Mr. Huang. president at whitehouse.gov mentioned ?are very important to him.? I don?t dare to unduly surmise the meaning of ?very important? to Mr. President; However, according to my humble opinions, there exits the following ?important?: on the one hand, respectable Mr. President, the American Government led by Mr. President as well as the great American people bitterly hate the predation of the intellectual property rights of***** others through brazen means such as stealing, shameless acts; in contrast, DuPont is committing such brazen and shameless deals; on the other hand, the number of your country?s intellectual property rights in a variety of fields is far in excess of that of any nations in the world and suffers greatly from rights infringement. Therefore, your government always reserves no efforts in urging other nations to intensify the law enforcement strength to protect your country?s intellectual property rights. However, while your government reserves no efforts in urging the Chinese government to intensify the law enforcement strength to protect your country?s intellectual property rights and receives your ?more encouraged? praise(note), DuPont is infringing the intellectual property rights of Mr. Huang through various extremely brazen and shameless means, which constitutes an extremely bad signal to the governments and public of other nations in the world, a extremely ?good? model for current and potential thieves of intellectual property rights, an enormous damage to your government protection of your country?s intellectual property rights, and a tremendous humiliation to your country?s lofty status in the world. For the sake of the glory of the great American people and the reputation of a legion of American corporations, in order to safeguard your country?s lofty status in the world and protect the intellectual property rights of your country and other nations in the world, we humbly request you and your government to prevent DuPont?s such extremely brazen infringement and even seizure behaviors, and force DuPont to carry out it?s voluntarily promised obligations in the agreement. We firmly believe that the United State is not a country that shields and connives at rascals and the American government is not a government that shields and connives at rascals; Under the instruction of our respectable Mr. President and the Americangovernment, the rascal of DuPont shall be aware of shame and be able to turn into a normal corporation by giving up shameless behaviors. Due to the adequate evidences, the clear-cut rights and obligations of both parties of DuPont and Mr. Huang, and simple legal relations, the infringement of the intellectual property rights of Mr. Huang by DuPont can be absolutely prevented and DuPont will surely disburse Mr. Huang patent fee, license fee or equivalent ?Utter Compensation? fee as long as your government intensifies the law enforcement strength to protect intellectual property rights as well. With best regards! Annex: Heartfelt thanks for your reading my E-mail and your mail of attention to this matter. I would like to make some replenishment concerning the matter, for you to judge and decide. I Abstract 1. At the request of Du Pont, Mr. Huang has for 10 times submitted written technical materials to Du Pont from April 1993 to 1994, for expert group of Du Pont to conduct feasibility analysis. 2. On February 22, 1995, Dr Robert F Sklar, Technology Transfer Licensing Manager of DuPont arrived in Shanghai in China, to ?sign many agreements? with Mr. Huang. Mr. Huang insisted DuPont examines samples first before signs any agreement. However, as samples were still in the process of purification at the time, no agreements were signed then. 3. On March 28, 1995, Mr. Huang sent the first batch of samples to Du Pont by post. 4. On September 7, 1995, Mr. Huang received ?Biological Evaluation Agreement? (1995 Agreement) sent by Du Pont, requiring Mr. Huang to sign this agreement and again provide samples. Mr. Huang signed the agreement and sent second batch of samples as requested by DuPont. DuPont admit in Article 5 of the ?1995 Agreement? that Mr. Huang will be entitled to claim patent and licensing fees. DuPont states in Article 8 of the ?1995 Agreement? that Mr. Huang may not cooperate with any universities or enterprises in any form before and after signing of this agreement (for this reason, Mr. Huang has refused cooperation request of several companies). 5. On September 10, 1998, DuPont sent a letter to Mr. Huang, asking for third batch of samples. 6. In 1999, DuPont carried out a month-long insecticide screening on the third batch of samples (in fact, it has carried out weeds killing test and mould killing test in the meantime), and required to keep all these tests a secret. 7. On June 8, 2000, DuPont sent a letter saying it was not interested in samples provided by Mr. Huang, and refused to pay Mr. Huang patent and licensing fees. 8.The mail signed by DuPont on June 2th, 2005, threaten Mr.Huang ,and prevent Mr.Huang send the E-mail. Seek response from E-mail: info at dupont.com http://www1.dupont.com/NASApp/dupontglobal/corp/contactEmail.jsp info.china at chn.dupont.com ?????????????? ??? ???????????????????????????????????????????????2006.01.16.?????????????????????????????????????30????????????????????????????????????????2006.01.26.,2006.02.06.?2006.02.10.?2006.02.15.????????????36?????info.china at chn.dupont.com?info at dupont.com??????????30???????????????????????????????????????????????????????e-mail?????????????????????????????????????????? ??????????! ???????????????! ?????????????????????! ??????????,???????????????????????! ????????????????????????????????????????? ???????????????????????????????????????? ************************************************************************************************* ????????????? ?????????????????president at whitehouse.gov?????president at whitehouse.gov?? 2004?9??????????????????????Thank you for e-mailing President Bush. Your ideas and comments are very important to him.????ideas and comments????????????????????????????????????????????????????????????????????????????????president at whitehouse.gov??are very important to him.? ?very important??????????????????????????????important? ? 1.????????????????????????????????????????????????????????????????????????? 2.??????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????? ???????????????????????????????????????????????????????????????????????????????????????????????????? ???????????????????????????????????????????????? ???????????????????????????????????????????????? ????????? ???????????????????????????????????????????????? ????????????????????????????????????????????? ???????????????????????????????????????????????? ??????????????????????????????????????????????????????????????????? ?? ??????? ?????? Chinese SXF 2005.09.17.23?59 ?? 1. ?1993?4???1994??????????????????10???????????????? ?????? 2. 1995?2?22?????????????Sklar?? ?E.I.DU PONT DE NEMOURS AND COMPANY Robert F. Sklar Ph. D. Manager,Technology Transfer Licensing)??????????????????????????????????????????????????????????? 3 1995?3?28???????????????? 4. 1995?9?7????????????BIOLOGICAL EVALUATION AGREEMENT?1995???)?????????????????????????????????????????????????1995?????5??????????????????????????????????1995?????8?????????????????????????????????????????? ???? 5. 1998?9?10?????????????????? 6 1999????????????????Insecticide Screening??????????????????????????????????????? 7. 2000?6?8?????????????????,????????????????? 8.2005.06.02. ???????????????-??????????E-mail? (??E-mail????? info.china at chn.dupont.com , ????Contact Us:info at dupont.com http://www1.dupont.com/NASApp/dupontglobal/corp/contactEmail.jsp) (??????????????????????????????????????e-mail???????? -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Feb 27 07:14:16 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Mon, 27 Feb 2006 07:14:16 -0800 Subject: Diffusion morning report 02/27/06 Message-ID: <44031748.5010204@snf.stanford.edu> Good Morning All, Looking like Monday this morning. Epi is down for Temp issue. Poly has pressure control issues. LTO has possible temp control issues. LTO is already way over 30microns-someone will be bumped so we can do pull and clean. Everything else is OK for now. > Date: 2/27/2006 THICKNESS-Change at > Tube Name/Number Status Comments > Tylan 1 Up > Tylan 2 Up > Tylan 3 Up > Tylan 4 Up > Tylan 5-BBr3 Up > Tylan 6-POCl3 Up > Tylan 7-TEOS2 Up > Tylan 8-SiGe Up 18.99/30 > Tylan 9-Poly Up 3.44/30 > Tylan 10-Nitride Up 8.24/30 > Tylan 11-BPSG-LTO Up 37.9/30 > Tylan 12-FGA Up > > Thermco 1 Up > Thermco 2 Up > Thermco Poly Up > Thermco Nitride Down Testing > > Burn Box Up > ZYGO up > > GAAS 22 UP > GAAS 23 up > > SiH4 for furnaces A on line 120 changeover working well > -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Feb 28 06:26:46 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Tue, 28 Feb 2006 06:26:46 -0800 Subject: Diffusion Morning Report 02/28/06 Message-ID: <44045DA6.9060703@snf.stanford.edu> Good Morning All, Looking Fair this morning. Epi is down for cooling water/air flow. Ebeam had lost stage position-reset. Everything else looks OK for now. Date: 2/28/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 18.99/30 Tylan 9-Poly Up 4.02/30 Tylan 10-Nitride Up 8.24/30 Tylan 11-BPSG-LTO Up 39.69/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down water/air flow Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 120 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: