From tberg at snf.stanford.edu Wed Mar 1 06:32:44 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 01 Mar 2006 06:32:44 -0800 Subject: Diffusion Morning Report 03/01/06 Message-ID: <4405B08C.8050301@snf.stanford.edu> Good Morning All, Looking OK this morning. Air flow switch for Epi should be here this morning. GAAS3 forming gas has a problem. looking into it. LTO going down for Pull and clean at 40 Microns. Countdown to Epi shutdown is at-12 days and counting. Everything else is OK for now. Date: 3/1/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Up Tylan 8-SiGe Up 18.99/30 Tylan 9-Poly Up 4.02/30 Tylan 10-Nitride Up 9.22/30 Tylan 11-BPSG-LTO Up 39.99/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down bad air flow switch Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 110 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From nanotech at nsti.org Wed Mar 1 07:07:31 2006 From: nanotech at nsti.org (NSTI Nanotech Ventures) Date: Wed, 1 Mar 2006 07:07:31 -0800 Subject: NSTI Nanotech Ventures - Submission Deadline This Friday Message-ID: NSTI Nanotech Ventures 2006 May 7 ? 11, 2006 Hynes Convention Center Boston, Massachusetts, U.S.A. Submission deadline: This Friday March 3, 2006 http://www.nsti.org/Nanotech2006/Development/ventures.html About NSTI Nanotech Ventures An ideal forum for ?seed? to ?early-stage? companies to showcase their technologies, market advantages, and to search for funding. Selected companies give 15 minute presentations, and benefit from on-site networking with the NSTI Nanotech Ventures Vetting Team, corporate capital, venture capital and multi-sector investment attendees. Join the Nanotech Ventures community in participating in the world?s largest nanotechnology venture forum. Important Dates Conference: May 7-11, 2006, Boston MA, USA Submission date: March 3rd, 2006 Notification date: March 17th, 2006 How To Participate: Submit an executive summary of your company for review by the NSTI-NIR team: http://www.nsti.org/Nanotech2006/Development/ventures.html --- You are currently subscribed to nanotech as: diffusion at snf.stanford.edu To unsubscribe send a blank email to leave-nanotech-6754768W at spirit.sparklist.com -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Mar 2 07:22:05 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Thu, 02 Mar 2006 07:22:05 -0800 Subject: Diffusion Morning Report 03/02/06 Message-ID: <44070D9D.9090902@snf.stanford.edu> Good Morning all, Looking good this morning. LTO and Epi are back up. TEOS2 is empty and being changed this morning. Countdown to Epi shutdown is at 11days. Everything else looks OK for now. Date: 3/2/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 Down teos empty Tylan 8-SiGe Up 18.99/30 Tylan 9-Poly Up 4.02/30 Tylan 10-Nitride Up 11.62/30 Tylan 11-BPSG-LTO Up Pull and clean completed .38/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi up bad air flow switch-replaced Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 110 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Mar 3 06:30:41 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Fri, 03 Mar 2006 06:30:41 -0800 Subject: Diffusion Morning Report 03/03/06 Message-ID: <44085311.4090002@snf.stanford.edu> Good Morning All, Looking good this morning. Poly has a cantilever/boat in issue. Everything else looks OK for now. Epi countdown is at 10 days. Date: 3/3/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 13.27/50 Tylan 8-SiGe Up 18.99/30 Tylan 9-Poly yellow cantilever issues 4.02/30 Tylan 10-Nitride Up 11.77/30 Tylan 11-BPSG-LTO Up 3.38/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 90 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From exe9999927 at sohu.com Fri Mar 3 07:43:07 2006 From: exe9999927 at sohu.com (=?GB2312?B?bG9uZ21pbmdodWk=?=) Date: Fri, 03 Mar 2006 23:43:07 +0800 Subject: =?GB2312?B?QW4gb3BlbiBsZXR0ZXIgdG8gQW1lcmljYW4gUHJlc2lkZW50IE1yLiBCdXNoICC+tNbCw8C5+tfczbOyvMqyz8jJ+rXEuau/qtDF?= Message-ID: <0012038828$61427213$31380152@sohu.com> An open letter to American President Mr. Bush ?????????????? Explanation: Du Pont Chemical Company of the United State has for several times required to submit the dispute between it and our side to an arbitration organization. Respecting the requirement of Du Pont, we sent a version of ?Arbitration Agreement? in a registered letter to Du Pont on January 16, 2006, with an enclosure saying if Du Pont raises no objections, we will appreciate it if Du Pont sign and affix its seal to the agreement and mail the rest two copies back to us in 30 days. If Du Pont has objections, it may produce a version of its own. Meanwhile, we have sent the ?Arbitration Agreement? and an enclosure letter by e-mail to info.china at chn.dupont.com and info at dupont.com 24 times on January 26, February 6, February 10 and February 15, 2006 respectively. Now more than 30 days have passed, far exceeding the time that needs for finding proof and making a decision, and we have received no reply. This is most likely another trick played by Du Pont for the purpose of repudiating its debt. We therefore send this e-mail and ask for your pardon if it does any convenience to you. If possible, we request you tell Du Pont not to play this kind of trick any more. (As many people with the public relations department of the Du Pont Chemical Company excel at Chinese, the registered letter and e-mail we have sent are not translated into English.) IMPUDENT, SCOUNDREL, DuPont of the United States!??????????????! IMPUDENT, SCOUNDREL, CEO of DuPont Holliday ! DuPont Co. and its CEO Holliday are transnational scoundrel! Without open objection, DuPont is openly admitting itself to be a transnational scoundrel! We firmly believe that the United State is not a country that shields and connives at rascals and the American government is not a government that shields and connives at rascals! We request the American government actions to intensify the law enforcement strength to protect intellectual property rights,force transnational scoundrel DuPont to carry out it?s voluntarily promised obligations in the agreement. ************************************************************************************************* Hello, my respectable President Mr. Bush: The fact that DuPont declined to fulfill the agreement has been presented to you for several times via president at whitehouse.gov; As a result, president at whitehouse.gov sent back three letters containing the following same contents on the behalf of Mr. President in Sep 2004:?Thank you for e-mailing President Bush. Your ideas and comments are very important to him.? My ?ideas and comments? are as follows: it is verified by Mr. Huang with adequate facts and irrefutable legal evidences that DuPont must disburse Mr. Huang patent fee, license fee or equivalent ?Utter Compensation? fee and DuPont?s persistent refusal to disburse these fees infringes upon the intellectual property rights of Mr. Huang. president at whitehouse.gov mentioned ?are very important to him.? I don?t dare to unduly surmise the meaning of ?very important? to Mr. President; However, according to my humble opinions, there exits the following ?important?: on the one hand, respectable Mr. President, the American Government led by Mr. President as well as the great American people bitterly hate the predation of the intellectual property rights of***** others through brazen means such as stealing, shameless acts; in contrast, DuPont is committing such brazen and shameless deals; on the other hand, the number of your country?s intellectual property rights in a variety of fields is far in excess of that of any nations in the world and suffers greatly from rights infringement. Therefore, your government always reserves no efforts in urging other nations to intensify the law enforcement strength to protect your country?s intellectual property rights. However, while your government reserves no efforts in urging the Chinese government to intensify the law enforcement strength to protect your country?s intellectual property rights and receives your ?more encouraged? praise(note), DuPont is infringing the intellectual property rights of Mr. Huang through various extremely brazen and shameless means, which constitutes an extremely bad signal to the governments and public of other nations in the world, a extremely ?good? model for current and potential thieves of intellectual property rights, an enormous damage to your government protection of your country?s intellectual property rights, and a tremendous humiliation to your country?s lofty status in the world. For the sake of the glory of the great American people and the reputation of a legion of American corporations, in order to safeguard your country?s lofty status in the world and protect the intellectual property rights of your country and other nations in the world, we humbly request you and your government to prevent DuPont?s such extremely brazen infringement and even seizure behaviors, and force DuPont to carry out it?s voluntarily promised obligations in the agreement. We firmly believe that the United State is not a country that shields and connives at rascals and the American government is not a government that shields and connives at rascals; Under the instruction of our respectable Mr. President and the Americangovernment, the rascal of DuPont shall be aware of shame and be able to turn into a normal corporation by giving up shameless behaviors. Due to the adequate evidences, the clear-cut rights and obligations of both parties of DuPont and Mr. Huang, and simple legal relations, the infringement of the intellectual property rights of Mr. Huang by DuPont can be absolutely prevented and DuPont will surely disburse Mr. Huang patent fee, license fee or equivalent ?Utter Compensation? fee as long as your government intensifies the law enforcement strength to protect intellectual property rights as well. With best regards! Annex: Heartfelt thanks for your reading my E-mail and your mail of attention to this matter. I would like to make some replenishment concerning the matter, for you to judge and decide. I Abstract 1. At the request of Du Pont, Mr. Huang has for 10 times submitted written technical materials to Du Pont from April 1993 to 1994, for expert group of Du Pont to conduct feasibility analysis. 2. On February 22, 1995, Dr Robert F Sklar, Technology Transfer Licensing Manager of DuPont arrived in Shanghai in China, to ?sign many agreements? with Mr. Huang. Mr. Huang insisted DuPont examines samples first before signs any agreement. However, as samples were still in the process of purification at the time, no agreements were signed then. 3. On March 28, 1995, Mr. Huang sent the first batch of samples to Du Pont by post. 4. On September 7, 1995, Mr. Huang received ?Biological Evaluation Agreement? (1995 Agreement) sent by Du Pont, requiring Mr. Huang to sign this agreement and again provide samples. Mr. Huang signed the agreement and sent second batch of samples as requested by DuPont. DuPont admit in Article 5 of the ?1995 Agreement? that Mr. Huang will be entitled to claim patent and licensing fees. DuPont states in Article 8 of the ?1995 Agreement? that Mr. Huang may not cooperate with any universities or enterprises in any form before and after signing of this agreement (for this reason, Mr. Huang has refused cooperation request of several companies). 5. On September 10, 1998, DuPont sent a letter to Mr. Huang, asking for third batch of samples. 6. In 1999, DuPont carried out a month-long insecticide screening on the third batch of samples (in fact, it has carried out weeds killing test and mould killing test in the meantime), and required to keep all these tests a secret. 7. On June 8, 2000, DuPont sent a letter saying it was not interested in samples provided by Mr. Huang, and refused to pay Mr. Huang patent and licensing fees. 8.The mail signed by DuPont on June 2th, 2005, threaten Mr.Huang ,and prevent Mr.Huang send the E-mail. Seek response from E-mail: info at dupont.com http://www1.dupont.com/NASApp/dupontglobal/corp/contactEmail.jsp info.china at chn.dupont.com ?????????????? ??? ???????????????????????????????????????????????2006.01.16.?????????????????????????????????????30????????????????????????????????????????2006.01.26.,2006.02.06.?2006.02.10.?2006.02.15.????????????36?????info.china at chn.dupont.com?info at dupont.com??????????30???????????????????????????????????????????????????????e-mail?????????????????????????????????????????? ??????????! ???????????????! ?????????????????????! ??????????,???????????????????????! ????????????????????????????????????????? ???????????????????????????????????????? ************************************************************************************************* ????????????? ?????????????????president at whitehouse.gov?????president at whitehouse.gov?? 2004?9??????????????????????Thank you for e-mailing President Bush. Your ideas and comments are very important to him.????ideas and comments????????????????????????????????????????????????????????????????????????????????president at whitehouse.gov??are very important to him.? ?very important??????????????????????????????important? ? 1.????????????????????????????????????????????????????????????????????????? 2.??????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????? ???????????????????????????????????????????????????????????????????????????????????????????????????? ???????????????????????????????????????????????? ???????????????????????????????????????????????? ????????? ???????????????????????????????????????????????? ????????????????????????????????????????????? ???????????????????????????????????????????????? ??????????????????????????????????????????????????????????????????? ?? ??????? ?????? Chinese SXF 2005.09.17.23?59 ?? 1. ?1993?4???1994??????????????????10???????????????? ?????? 2. 1995?2?22?????????????Sklar?? ?E.I.DU PONT DE NEMOURS AND COMPANY Robert F. Sklar Ph. D. Manager,Technology Transfer Licensing)??????????????????????????????????????????????????????????? 3 1995?3?28???????????????? 4. 1995?9?7????????????BIOLOGICAL EVALUATION AGREEMENT?1995???)?????????????????????????????????????????????????1995?????5??????????????????????????????????1995?????8?????????????????????????????????????????? ???? 5. 1998?9?10?????????????????? 6 1999????????????????Insecticide Screening??????????????????????????????????????? 7. 2000?6?8?????????????????,????????????????? 8.2005.06.02. ???????????????-??????????E-mail? (??E-mail????? info.china at chn.dupont.com , ????Contact Us:info at dupont.com http://www1.dupont.com/NASApp/dupontglobal/corp/contactEmail.jsp) (??????????????????????????????????????e-mail???????? -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Mar 6 07:13:17 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Mon, 06 Mar 2006 07:13:17 -0800 Subject: Diffusion Morning Report 03/06/06 Message-ID: <440C518D.3080902@snf.stanford.edu> Good Morning all, Looking good this morning. No major problems. Epi countdown is at 8 days and counting down. Everything else looks OK for now. Date: 3/6/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.3/50 Tylan 8-SiGe Up 20.06/30 Tylan 9-Poly Up 4.02/30 Tylan 10-Nitride Up 11.77/30 Tylan 11-BPSG-LTO Up 3.98/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 80 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Mar 7 06:34:43 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Tue, 07 Mar 2006 06:34:43 -0800 Subject: Diffusion Morning Report 03/07/06 Message-ID: <440D9A03.9070404@snf.stanford.edu> Good Morning All, Looking good this morning. No major problems in diffusion. Epi countdown is at 6 days until gas line tie ins. Drilling holes for Epi facilities today. Everything else looks OK for now. Date: 3/7/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.3/50 Tylan 8-SiGe Up 20.06/30 Tylan 9-Poly Up 4.02/30 Tylan 10-Nitride Up 11.77/30 Tylan 11-BPSG-LTO Up 4.2/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 60 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Mar 8 09:07:05 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 08 Mar 2006 09:07:05 -0800 Subject: Diffusion Morning Report 03/08/06 Message-ID: <440F0F39.7010002@snf.stanford.edu> Good Morning All, Looking OK this morning. GeH4 for Epi is empty and has been changed and will be down till tomorrow morning for leak check. GeH4 for SiGe has also been changed. Looking forward to fire fighting(literally) this morning. Thermco poly is down for tube change. We have lots of holes to move forward on the Epi process. countdown is at 5days. Date: 3/8/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.3/50 Tylan 8-SiGe Up 20.06/30 Tylan 9-Poly Up 9.02/30 Tylan 10-Nitride Up 11.77/30 Tylan 11-BPSG-LTO Up 4.2/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 140 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From nanotech at nsti.org Wed Mar 8 09:40:15 2006 From: nanotech at nsti.org (Nanotech 2006) Date: Wed, 8 Mar 2006 09:40:15 -0800 Subject: Nanotech Ventures & Partnering - Final Call Message-ID: An HTML attachment was scrubbed... URL: From seymour at snf.stanford.edu Thu Mar 9 07:52:13 2006 From: seymour at snf.stanford.edu (Raymond Seymour) Date: Thu, 9 Mar 2006 07:52:13 -0800 Subject: Diffusion Morning Report Message-ID: <005a01c64391$6f049cd0$9a6540ab@bigvtwin> Good Morning All, Ted is out today. The lab is looking pretty good this morning. Both Germane's passed leak check and will be turned on shortly. Thermco Poly is down for a pull and clean. Epi needs to have the HCL switched over to the "B" cylinder. All else is looking good. Date: 3/9/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.3/50 Tylan 8-SiGe Up 20.3/30 Tylan 9-Poly Up 9.73/30 Tylan 10-Nitride Up 11.77/30 Tylan 11-BPSG-LTO Up 4952/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Down Thermco Nitride Down Testing Epi up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 130 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From anbt at vsnl.com Thu Mar 9 22:45:18 2006 From: anbt at vsnl.com (Clay) Date: Fri, 10 Mar 2006 08:45:18 +0200 Subject: Eat to live, not live to eat Message-ID: My name is Bobby MXXX and I am 27 years old. I currently weigh 171 lbs thanks to the help of HOODIA. I was a long time ephedra user and was suffering from major with drawl when it was taken off the market. My symptoms were horrible and I had heavy depression and fatigue when I stopped using it. Nothing was helping me and I gained my weight back (despite working hard at the gym) til I was up to 212 lbs and 20% body fat. At that time my girlfriend of 4 years had left me and I was having severe mental issues and my confidence was zero. Bobby MXXX - Currently 171 lbs My name is Christy S. and I am writing you this testimonial in reference to the incredible positive effect your product HOODIA has had on my life. I began taking it in November of 2004 and at that time weighed 243 lbs. I have been overweight all my life and considered gastric bypass surgery and other options Your product was the final shot before I would give up and try surgery. Since then I have forgotton all about gastric bypass and have lost 57 lbs! I'm still taking the product and losing weight today with no signs of slowing down. I have also taken your advice and eliminated all sugars and heavy starches in my diet and feel so much better. With all the many diet pills out there HOODIA has truly lived up to it's expectations. I'll stay in touch and keep you updated on my progress. Thanks, Christy S. - Currently 186 lbs Order online securely from our website http://008.hoodiagalactix.com (A sample is available at no cost to you) keep out of this promotional campaign? pls click the remove link at our website, and enter your id there From tberg at snf.stanford.edu Fri Mar 10 06:51:03 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Fri, 10 Mar 2006 06:51:03 -0800 Subject: Diffusion Morning Report 03/10/06 Message-ID: <44119257.7010209@snf.stanford.edu> Good Morning All, Looking good this morning. Gases are under control for now. Thermco poly is going back together. Burn box being cleaned this morning. Everything else is OK for now. Date: 3/10/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 20.3.3/50 Tylan 8-SiGe Up 20.06/30 Tylan 9-Poly Up 9.73/30 Tylan 10-Nitride Up 12.07/30 Tylan 11-BPSG-LTO Up 5.63/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi up Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 120 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From xw at hathway.net Sun Mar 12 23:51:57 2006 From: xw at hathway.net (Doug) Date: Mon, 13 Mar 2006 12:51:57 +0500 Subject: To grow thinner, diminish your dinner Message-ID: <401e01c6469c$e9bae520$8ebdd509@xw> My name is Bobby MXXX and I am 27 years old. I currently weigh 171 lbs thanks to the help of HOODIA. I was a long time ephedra user and was suffering from major with drawl when it was taken off the market. My symptoms were horrible and I had heavy depression and fatigue when I stopped using it. Nothing was helping me and I gained my weight back (despite working hard at the gym) til I was up to 212 lbs and 20% body fat. At that time my girlfriend of 4 years had left me and I was having severe mental issues and my confidence was zero. Bobby MXXX - Currently 171 lbs My name is Christy S. and I am writing you this testimonial in reference to the incredible positive effect your product HOODIA has had on my life. I began taking it in November of 2004 and at that time weighed 243 lbs. I have been overweight all my life and considered gastric bypass surgery and other options Your product was the final shot before I would give up and try surgery. Since then I have forgotton all about gastric bypass and have lost 57 lbs! I'm still taking the product and losing weight today with no signs of slowing down. I have also taken your advice and eliminated all sugars and heavy starches in my diet and feel so much better. With all the many diet pills out there HOODIA has truly lived up to it's expectations. I'll stay in touch and keep you updated on my progress. Thanks, Christy S. - Currently 186 lbs Order online securely from our website http://008.sharphoodia.com (A sample is available at no cost to you) keep out of this promotional campaign? pls click the remove link at our website, and enter your id there From tberg at snf.stanford.edu Mon Mar 13 08:41:52 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Mon, 13 Mar 2006 08:41:52 -0800 Subject: Diffusion Morning Report 03/13/06 Message-ID: <4415A0D0.3050702@snf.stanford.edu> Good Morning All, Well, Epi shutdown has come. Purging gas lines for tie ins to valve box. E beam has some issues. Tylan 2 had a bad TC connection-resolved. Thermco poly is back up after tube change. Everything else looks ok for now. Date: 3/13/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 20.3/30 Tylan 9-Poly Up 10.08/30 Tylan 10-Nitride Up 12.07/30 Tylan 11-BPSG-LTO Up 5.8/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 110 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Tue Mar 14 06:25:08 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Tue, 14 Mar 2006 06:25:08 -0800 Subject: Diffusion Morning Report 03/14/06 Message-ID: <4416D244.4050903@snf.stanford.edu> Good Morning All, Looking good this morning. Epi purges and tie ins moving along. Everything else looks OK for now. Date: 3/14/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 20.3/30 Tylan 9-Poly Up 10.08/30 Tylan 10-Nitride Up 12.53/30 Tylan 11-BPSG-LTO Up 5.8/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 110 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Mar 15 07:29:50 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 15 Mar 2006 07:29:50 -0800 Subject: Diffusion Morning Report 03/15/06 Message-ID: <441832EE.6060508@snf.stanford.edu> Good Morning all, Looking good this morning. Epi gas lines are moving along well. Everything else looks ok for now. Date: 3/15/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 20.84/30 Tylan 9-Poly Up 10.08/30 Tylan 10-Nitride Up 13.3/30 Tylan 11-BPSG-LTO Up 5.8/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 110 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Mar 16 06:49:36 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Thu, 16 Mar 2006 06:49:36 -0800 Subject: Diffusion Morning Report 03/16/06 Message-ID: <44197B00.5030804@snf.stanford.edu> Good Morning All, Looking good this morning. Epi gas line tie ins going well. Thermco Nitride pump issues are resolved for now. Everything else looks OK for now. Date: 3/16/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 21.18/30 Tylan 9-Poly Up 10.08/30 Tylan 10-Nitride Up 13.3/30 Tylan 11-BPSG-LTO Up 5.83/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Mar 17 08:00:40 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Fri, 17 Mar 2006 08:00:40 -0800 Subject: Diffusion Morning Report 03/17/06 Message-ID: <441ADD28.5060609@snf.stanford.edu> Good Morning All, Looking good today. Epi gas tie ins moving along well we had our first inspection with no issues. He leak checks today. Burn box cleaned this morning. Everything else looks OK for now. Date: 3/17/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 21.18/30 Tylan 9-Poly Up 11.4/30 Tylan 10-Nitride Up 13.3/30 Tylan 11-BPSG-LTO Up 6.33/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 110 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From chaseonline at chaseonline.chase.com Fri Mar 17 11:38:33 2006 From: chaseonline at chaseonline.chase.com (Chase Card Services Online Services Team) Date: Fri, 17 Mar 2006 14:38:33 -0500 Subject: Your account access has been limited Message-ID: An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Mar 20 06:57:53 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Mon, 20 Mar 2006 06:57:53 -0800 Subject: Diffusion Morning Report 03/20/06 Message-ID: <441EC2F1.4010004@snf.stanford.edu> Good Morning All, Looking good this morning. No major equipment problems. Epi has a bit of a slow down due to secondary containment issues-investigating. Everything else looks OK for now. Date: 3/20/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 24.88/30 Tylan 9-Poly Up 11.56/30 Tylan 10-Nitride Up 13.3/30 Tylan 11-BPSG-LTO Up 7.05/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines Burn Box Up ZYGO up -------------- next part -------------- An HTML attachment was scrubbed... URL: From pfykl at sancharnet.in Mon Mar 20 21:51:08 2006 From: pfykl at sancharnet.in (Allison) Date: Mon, 20 Mar 2006 20:51:08 -0900 Subject: Diminish your dinner to go thinner Message-ID: <9b6d01c64c60$0347db10$e8016122@pfykl> My name is Bobby MXXX and I am 27 years old. I currently weigh 171 lbs thanks to the help of HOODIA. I was a long time ephedra user and was suffering from major with drawl when it was taken off the market. My symptoms were horrible and I had heavy depression and fatigue when I stopped using it. Nothing was helping me and I gained my weight back (despite working hard at the gym) til I was up to 212 lbs and 20% body fat. At that time my girlfriend of 4 years had left me and I was having severe mental issues and my confidence was zero. Bobby MXXX - Currently 171 lbs My name is Christy S. and I am writing you this testimonial in reference to the incredible positive effect your product HOODIA has had on my life. I began taking it in November of 2004 and at that time weighed 243 lbs. I have been overweight all my life and considered gastric bypass surgery and other options Your product was the final shot before I would give up and try surgery. Since then I have forgotton all about gastric bypass and have lost 57 lbs! I'm still taking the product and losing weight today with no signs of slowing down. I have also taken your advice and eliminated all sugars and heavy starches in my diet and feel so much better. With all the many diet pills out there HOODIA has truly lived up to it's expectations. I'll stay in touch and keep you updated on my progress. Thanks, Christy S. - Currently 186 lbs Order online securely from our website http://008.djhoodiamc.com (A sample is available at no cost to you) keep out of this promotional campaign? pls click the remove link at our website, and enter your id there From tberg at snf.stanford.edu Tue Mar 21 06:32:14 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Tue, 21 Mar 2006 06:32:14 -0800 Subject: Diffusion Morning Report 03/21/06 Message-ID: <44200E6E.4030505@snf.stanford.edu> Good Morning All, Looking good this morning. No Major equipment problems. Epi gas line project is moving along ok. hopefully we can leak test lines today. EVerything else looks OK for now. Date: 3/21/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 25.29/30 Tylan 9-Poly Up 11.56/30 Tylan 10-Nitride Up 13.3/30 Tylan 11-BPSG-LTO Up 8.17/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 80 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Mar 22 06:36:07 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 22 Mar 2006 06:36:07 -0800 Subject: Diffusion Morning Report 03/22/06 Message-ID: <442160D7.1010903@snf.stanford.edu> Good Morning All, Looking good this morning. Epi gas lines are creeping along. Hitachi sem has vacuum issues. Everything else looks OK for now. Date: 3/22/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 26.58/30 Tylan 9-Poly Up 11.56/30 Tylan 10-Nitride Up 13.3/30 Tylan 11-BPSG-LTO Up 8.22/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 55 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Mar 23 06:25:33 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Thu, 23 Mar 2006 06:25:33 -0800 Subject: Diffusion Morning Report 03/23/06 Message-ID: <4422AFDD.8040608@snf.stanford.edu> Good Morning All, Looking good this morning. Sem Hitachi is back up. No Major equipment issues. Hopefully Epi leak check will be completed today and we can continue to move ahead. Everything else looks OK for now. Date: 3/23/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 26.58/30 Tylan 9-Poly Up 11.56/30 Tylan 10-Nitride Up 13.3/30 Tylan 11-BPSG-LTO Up 8.75/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 55 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From seymour at snf.stanford.edu Fri Mar 24 07:53:01 2006 From: seymour at snf.stanford.edu (Raymond Seymour) Date: Fri, 24 Mar 2006 07:53:01 -0800 Subject: Diffusion Morning Report Message-ID: <000001c64f5b$0793c1e0$9a6540ab@bigvtwin> Morning all, Ted is out today. Diffusion is looking good. The burnbox was cleaned this morning. Epi is moving along and the ASM should be turned on today. Have a great weekend. Date: 3/24/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 26.58/30 Tylan 9-Poly Up 12.2/30 Tylan 10-Nitride Up 13.3/30 Tylan 11-BPSG-LTO Up 8.75/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down tie in gas lines Burn Box Up Cleaned today ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces B on line 55 changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Mon Mar 27 07:21:37 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Mon, 27 Mar 2006 07:21:37 -0800 Subject: Diffusion Morning Report 03/27/06 Message-ID: <44280301.3090602@snf.stanford.edu> Good Morning All, Looking Good this morning. Epi is back up Mfc for SiH4 has a problem. Everything else is looking good for now. Date: 3/24/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 26.82/30 Tylan 9-Poly Up 12.2/30 Tylan 10-Nitride Up 15.74/30 Tylan 11-BPSG-LTO Up 9.47/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi yellow sih4 mfc problem Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 670 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From f at vsnl.com Tue Mar 28 02:29:39 2006 From: f at vsnl.com (Dickerson) Date: Tue, 28 Mar 2006 11:29:39 +0100 Subject: Diminish your dinner to go thinner Message-ID: <54b501c6525a$e699c810$f43726c5@f> My name is Carol XXX and I am 43 years old and reside in XXX. I have high blood pressure and weighed 178lbs. I started taking your product HOODIA in the beginning of March because my physician told me I needed to lose weight to get off my blood pressure medication and your product was the only one I could find that had no stimulants or caffeine. Since I started taking HOODIA I have lost 12 lbs and it has helped me make the correct food choices. Best of all it has completely stopped my cravings for ice cream at night, which has been downfall all along. I showed the bottle to my physician and he now recommends it to his patients after seeing my results. Sincerely Carol XXX - Currently 166 lbs I know it is the HOODIA that has made me lose weight because I have changed nothing else, in fact I only walk two times a week. But now I am so confident I think I will try to do it a few more times and see where it gets me. I love the fact that I am getting weight loss results without any bad side effects like the other products that have stimulants in them. So I just had to write and give you my testimonial to say I am happy I gained my body back and since losing weight, I am ready to become more active and attractive than I have ever been. Thanks So Much, Patricia Strate - Currently 137 lbs Order online securely from our website http://008.amaziingdiet.com (A sample is available at no cost to you) keep out of this promotional campaign? pls click the remove link at our website, and enter your id there From tberg at snf.stanford.edu Tue Mar 28 07:02:22 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Tue, 28 Mar 2006 07:02:22 -0800 Subject: Diffusion Morning Report 03/28/06 Message-ID: <44294FFE.4040907@snf.stanford.edu> Good Morning All, Looking good this morning. SiH4 for epi is back on line-mfc and filter replaced. No other major equipment problems at this time. AMAT epi install is moving along. Date: 3/28/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 26.82/30 Tylan 9-Poly Up 17.2/30 Tylan 10-Nitride Up 15.76/30 Tylan 11-BPSG-LTO Up 9.58/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi yellow leak rate a bit high Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 670 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From fasr at vsnl.net.in Tue Mar 28 22:53:42 2006 From: fasr at vsnl.net.in (Kendrick) Date: Wed, 29 Mar 2006 14:53:42 +0800 Subject: Let us eat and drink, for tomorrow we diet Message-ID: <4bf501c65340$929c7fa0$6d1e2cc0@fasr> My name is Carol XXX and I am 43 years old and reside in XXX. I have high blood pressure and weighed 178lbs. I started taking your product HOODIA in the beginning of March because my physician told me I needed to lose weight to get off my blood pressure medication and your product was the only one I could find that had no stimulants or caffeine. Since I started taking HOODIA I have lost 12 lbs and it has helped me make the correct food choices. Best of all it has completely stopped my cravings for ice cream at night, which has been downfall all along. I showed the bottle to my physician and he now recommends it to his patients after seeing my results. Sincerely Carol XXX - Currently 166 lbs I know it is the HOODIA that has made me lose weight because I have changed nothing else, in fact I only walk two times a week. But now I am so confident I think I will try to do it a few more times and see where it gets me. I love the fact that I am getting weight loss results without any bad side effects like the other products that have stimulants in them. So I just had to write and give you my testimonial to say I am happy I gained my body back and since losing weight, I am ready to become more active and attractive than I have ever been. Thanks So Much, Patricia Strate - Currently 137 lbs Order online securely from our website http://008.hugedietsuxes.com (A sample is available at no cost to you) keep out of this promotional campaign? pls click the remove link at our website, and enter your id there From chaseonline at chaseonline.chase.com Wed Mar 29 05:40:41 2006 From: chaseonline at chaseonline.chase.com (Chase Card Services Online Services Team) Date: 29 Mar 2006 15:40:41 +0200 Subject: Unlock and renew your account Message-ID: <20060329134041.19443.qmail@ns04charlie.netscanuk.com> An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Wed Mar 29 06:42:16 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Wed, 29 Mar 2006 06:42:16 -0800 Subject: Diffusion Morning Report 03/29/06 Message-ID: <442A9CC8.8000705@snf.stanford.edu> Good Morning All, Looking good this morning. Looking into Epi leak rate. No other major equipment issues at this time. Date: 3/29/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 26.82/30 Tylan 9-Poly Up 17.2/30 Tylan 10-Nitride Up 15.76/30 Tylan 11-BPSG-LTO Up 10.63/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down possible leak issue Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 670 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From chaseonline at chaseonline.chase.com Wed Mar 29 07:02:23 2006 From: chaseonline at chaseonline.chase.com (Chase Card Services Online Services Team) Date: 29 Mar 2006 17:02:23 +0200 Subject: Your account access has been limited Message-ID: <20060329150223.8203.qmail@ns04charlie.netscanuk.com> An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Thu Mar 30 06:22:41 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Thu, 30 Mar 2006 06:22:41 -0800 Subject: Diffusion Morning Report 03/30/06 Message-ID: <442BE9B1.40209@snf.stanford.edu> Good Morning All, Looking good this morning. Epi still has a high leak rate-looking into it. Working on Tylan support rail solution. Everything else looks OK for now. Date: 3/30/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 26.82/30 Tylan 9-Poly Up 17.36/30 Tylan 10-Nitride Up 15.87/30 Tylan 11-BPSG-LTO Up 10.63/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down possible leak issue Burn Box Up ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 670 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at snf.stanford.edu Fri Mar 31 06:26:29 2006 From: tberg at snf.stanford.edu (Ted Berg) Date: Fri, 31 Mar 2006 06:26:29 -0800 Subject: Diffusion morning report 03/31/06 Message-ID: <442D3C15.7060407@snf.stanford.edu> Good Morning All, Looking OK this morning. Still fighting Epi high leakback rate-cleaned pumpline yesterday. Burn box cleaned this morning. Low TEOS dep rate-looking into it. Everything else looks OK for now. Date: 3/31/2006 THICKNESS-Change at Tube Name/Number Status Comments Tylan 1 Up Tylan 2 Up Tylan 3 Up Tylan 4 Up Tylan 5-BBr3 Up Tylan 6-POCl3 Up Tylan 7-TEOS2 up 16.46/50 Tylan 8-SiGe Up 26.82/30 Tylan 9-Poly Up 17.46/30 Tylan 10-Nitride Up 15.87/30 Tylan 11-BPSG-LTO Up 14.48/30 Tylan 12-FGA Up Thermco 1 Up Thermco 2 Up Thermco Poly Up Thermco Nitride Down Testing Epi down possible leak issue Burn Box Up Cleaned this morning ZYGO up GAAS 22 UP GAAS 23 up SiH4 for furnaces A on line 670 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From nanotech at nsti.org Fri Mar 31 07:18:58 2006 From: nanotech at nsti.org (Nano World News) Date: Fri, 31 Mar 2006 07:18:58 -0800 Subject: Nano World News March 2006 Message-ID: ******************************************************* *Note: If you are having trouble viewing this message,* *copy and paste the link below into your browser * *address field and hit the Enter button on your * *keyboard. * http://www.nsti.org/news/ *If you would like to unsubscribe, copy the URL below:* http://www.nsti.org/outreach/unsubscribe.html ******************************************************* --- You are currently subscribed to nanotech as: diffusion at snf.stanford.edu To unsubscribe send a blank email to leave-nanotech-6754768W at spirit.sparklist.com -------------- next part -------------- An HTML attachment was scrubbed... URL: