Diffusion Morning Report 05/01/06
Ted Berg
tberg at snf.stanford.edu
Mon May 1 06:39:42 PDT 2006
Good Morning All,
Looking good this morning. No major problem this morning. AMAT epi
install is moving along well. SiGe Poly in Thermco bank 2 is
moving along OK.
> Diffusion
> Date: 5/1/06 THICKNESS-Change at
> Tube Name/Number Status Comments
> Tylan 1 Up
> Tylan 2 Up
> Tylan 3 Up
> Tylan 4 Up
> Tylan 5-BBr3 Up
> Tylan 6-POCl3 Up
> Tylan 7-TEOS2 Up 20.43/30
> Tylan 8-SiGe Up 29.39/30
> Tylan 9-Poly Up 2.55/30
> Tylan 10-Nitride Up 23.46/30
> Tylan 11-BPSG-LTO up 3.74/30
> Tylan 12-FGA Up
>
> Thermco 1 Up
> Thermco 2 Up
> Thermco Poly Up
> Thermco Nitride Down Testing
>
> Epi yellow possible higher leak rate
>
> Burn Box Up
> ZYGO up
>
> GAAS 22 UP
> GAAS 23 up
>
> SiH4 for furnaces A on line 590 psi changeover working well
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20060501/cf7dc825/attachment.html>
More information about the diffusion
mailing list