Diffusion Morning Report
Ted Berg
tberg at snf.stanford.edu
Fri May 5 06:32:02 PDT 2006
Feliz Cinco de Mayo,
Good morning All,
Looking good this morning. Burn box cleaned this morning. Tylan 3
had cantilever rebuilt needs test. TEOS2 pump out for repairfor at
least another
week. AMAT epi install moving ahead. Everything else looks ok for now.
Diffusion
Date: 5/5/06 THICKNESS-Change at
Tube Name/Number Status Comments
Tylan 1 Up
Tylan 2 Up
Tylan 3 yellow bad uniformity-cantilever rebuilt
Tylan 4 Up
Tylan 5-BBr3 Up
Tylan 6-POCl3 Up
Tylan 7-TEOS2 Down Pump out for repair 20.43/30
Tylan 8-SiGe Up 29.39/30
Tylan 9-Poly Up 3.4/30
Tylan 10-Nitride Up 24.51/30
Tylan 11-BPSG-LTO up 5.98/30
Tylan 12-FGA Up
Thermco 1 Up
Thermco 2 Up
Thermco Poly Up
Thermco Nitride Down Testing
Epi yellow possible higher leak rate
Burn Box Up cleaned this morning
ZYGO up
GAAS 22 UP
GAAS 23 up
SiH4 for furnaces A on line 560 psi changeover working well
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20060505/6d15856c/attachment.html>
More information about the diffusion
mailing list