Diffusion Morning Report 05/08/06
Ted Berg
tberg at snf.stanford.edu
Mon May 8 06:34:55 PDT 2006
Good Morning All,
Looking good this morning. LTO has a broken cantilever sheath, Tylan
1 has a gas flow problem- looking into it. TEOS2 pump still
out for repair. Ebeam needs to be rebooted. Everything else looks OK for
now,
Diffusion
Date: 5/8/06 THICKNESS-Change at
Tube Name/Number Status Comments
Tylan 1 Down gas flow problems
Tylan 2 Up
Tylan 3 Up test good
Tylan 4 Up
Tylan 5-BBr3 Up
Tylan 6-POCl3 Up
Tylan 7-TEOS2 Down Pump out for repair 20.43/30
Tylan 8-SiGe Up 29.39/30
Tylan 9-Poly Up 4.16/30
Tylan 10-Nitride Up 25.81/30
Tylan 11-BPSG-LTO Down broken cantilever sheath 5.98/30
Tylan 12-FGA Up
Thermco 1 Up
Thermco 2 Up
Thermco Poly Up
Thermco Nitride Down Testing
Epi yellow possible higher leak rate
Burn Box Up
ZYGO up
GAAS 22 UP
GAAS 23 up
SiH4 for furnaces A on line 560 psi changeover working well
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20060508/fd49e4c4/attachment.html>
More information about the diffusion
mailing list