Diffusion Morning Report 05/16/06

Ted Berg tberg at snf.stanford.edu
Tue May 16 07:26:18 PDT 2006


Good Morning All,
    looking good this morning.  TEOS2 failed leak test after a wonderful 
process qual-looking into it. AMAT epi install is moving ahead.
Everything else looks OK for now.

  	Date: 	5/16/06 	THICKNESS-Change at 	  	 
Tube Name/Number 	Status 	Comments 	  	  	 
Tylan 1 	Up 	  	  	  	 
Tylan 2 	Up 	  	  	  	 
Tylan 3 	Up 	  	  	  	 
Tylan 4 	Up 	  	  	  	 
Tylan 5-BBr3 	Up 	  	  	  	 
Tylan 6-POCl3 	Up 	  	  	  	 
Tylan 7-TEOS2 	Down 	leak failed again 	20.43/30 	  	 
Tylan 8-SiGe 	Up 	  	30.12/30 	  	 
Tylan 9-Poly 	Up 	  	5.71/30 	  	 
Tylan 10-Nitride 	Up 	  	27.7/30 	  	 
Tylan 11-BPSG-LTO 	yellow 	bad uniformity 	2.88/30 	  	 
Tylan 12-FGA 	Up 	  	  	  	 
  	  	  	  	  	 
Thermco 1 	Up 	  	  	  	 
Thermco 2 	Up 	  	  	  	 
Thermco Poly 	Up 	  	  	  	 
Thermco Nitride 	Down 	Testing 	  	  	 
  	  	  	  	  	 
Epi 	yellow 	possible higher leak rate 	  	  	 
  	  	  	  	  	 
Burn Box 	Up 	  	  	  	 
ZYGO 	up 	  	   	  	 
  	  	  	  	  	 
GAAS 22 	UP 	  	  	  	 
GAAS 23 	up 	  	  	  	 
  	  	  	  	  	 
SiH4 for furnaces 	  	A on line 560 psi 	 changeover working well  	  	 


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20060516/448268c6/attachment.html>


More information about the diffusion mailing list