From tberg at stanford.edu Tue Jul 1 06:18:30 2008 From: tberg at stanford.edu (Ted Berg) Date: Tue, 01 Jul 2008 06:18:30 -0700 Subject: Diffusion Morning Report 07/01/08 Message-ID: <486A2EA6.3030801@stanford.edu> Good Morning All, Looking OK this morning. Making progress on TEOS2 leak issue. Tylan 1 an LTO as well as THermco poly1 under observation. TYlan Nitride has lower than usual pressure for dep waiting test results. No other issues at this time. Date: 7/1/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 yellow observation Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 down pumping issues 11.96/30 Tylan 8-SiGe up 16.53/30 Tylan 9-Poly up 26.82/30 Tylan 10-Nitride yellow pressure low 28.62/30 Tylan 11-LTO yellow possible particles 27.63/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam up ZYGO up FGA2 up SiH4 for furnaces a on line 430 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Tue Jul 1 06:33:55 2008 From: tberg at stanford.edu (Ted Berg) Date: Tue, 01 Jul 2008 06:33:55 -0700 Subject: LTO plan Message-ID: <486A3243.9040300@stanford.edu> Hello All, Here is our portion of the plan. Send another E-mail informing user community that LTO will be going down in approximately 2 weeks. When the jungle arrives we will shut down the furnace and turn off gases at the tube level. WE will do a rate of rise for baseline. We will pump and purge existing lines. We will remove old Jungle and electronics. We will install the new jungle and connect electronics.. We will perform a functional test with N2 and then do a Helium leak check for leak integrity. we ill then introduce process gases and do a run to once again verify proper operation . At that point it will be turned over to process for characterization The only possible diversion would be if we decide to change the process tube at the same time, From tberg at stanford.edu Wed Jul 2 06:54:07 2008 From: tberg at stanford.edu (Ted Berg) Date: Wed, 02 Jul 2008 06:54:07 -0700 Subject: Diffusion Morning Report 07/02/08 Message-ID: <486B887F.7090504@stanford.edu> Good Morning All, Looking good this morning. TEOS2 is back up thanks Mike and Ray. LTO and Tylan 1 and Thermco Poly1 under observation. Tylan Nitride has apossible pressure issue. No other issues at this time. Date: 7/2/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 yellow observation Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 11.96/30 Tylan 8-SiGe up 16.53/30 Tylan 9-Poly up 26.82/30 Tylan 10-Nitride yellow pressure low 28.62/30 Tylan 11-LTO yellow possible particles 29.07/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam up ZYGO up FGA2 up SiH4 for furnaces a on line 430 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Thu Jul 3 06:20:10 2008 From: tberg at stanford.edu (Ted Berg) Date: Thu, 03 Jul 2008 06:20:10 -0700 Subject: Diffusion Morning Report 07/03/08 Message-ID: <486CD20A.5090903@stanford.edu> Good Morning All , Looking good this morning. LTO and Thermco poly1 under observation. Nitride pressure issues. Burn box cleaned this morning.no other issues at this time. Date: 7/3/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 11.96/30 Tylan 8-SiGe up 16.97/30 Tylan 9-Poly up 26.82/30 Tylan 10-Nitride yellow pressure high 28.62/30 Tylan 11-LTO yellow possible particles 30.09/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up cleaned this morning Ebeam up ZYGO up FGA2 up SiH4 for furnaces a on line 430 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Mon Jul 7 06:52:00 2008 From: tberg at stanford.edu (Ted Berg) Date: Mon, 07 Jul 2008 06:52:00 -0700 Subject: Diffusion Morning Report 07/07/08 Message-ID: <48721F80.9080900@stanford.edu> Good Morning All, Looking good this morning. FGA is down for pull and clean metal contamination. Tylan Lto going down tomorrow for pull and clean. Thermco poly1 under observation. TEOS2 down for TCU problem after power glitch. No other issues at this time. Date: 7/7/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 down tcu error 11.96/30 Tylan 8-SiGe up 16.97/30 Tylan 9-Poly up 29.07/30 Tylan 10-Nitride yellow pressure high 28.62/30 Tylan 11-LTO yellow possible particles 32.81/30 Tylan 12-FGA down contaminated Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam up ZYGO up FGA2 up SiH4 for furnaces a on line 430 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Tue Jul 8 06:38:27 2008 From: tberg at stanford.edu (Ted Berg) Date: Tue, 08 Jul 2008 06:38:27 -0700 Subject: Diffusion Morning Report 07/08/08 Message-ID: <48736DD3.80401@stanford.edu> Good Morning All, Looking good this morning. LTO is down for pull and clean. Thermco poly1 under observation. Nitride had a pumping issue. SEM hitachi has some display issues. Tylan FGA up after pull and clean.. FGA2 has another broken pull rod thats 3 in 3 weeks!! No other issues at this time. Date: 7/8/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 11.96/30 Tylan 8-SiGe up 16.97/30 Tylan 9-Poly up 29.07/30 Tylan 10-Nitride yellow pressure high 28.62/30 Tylan 11-LTO yellow pull and clean 0/30 Tylan 12-FGA up Pull and clean completed Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam up ZYGO up FGA2 yellow broken pull rod again!! SiH4 for furnaces a on line 430 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From rseymour at stanford.edu Wed Jul 9 07:26:31 2008 From: rseymour at stanford.edu (Ray Seymour) Date: Wed, 09 Jul 2008 07:26:31 -0700 Subject: Diffusion Morning report Message-ID: <4874CA97.4040109@stanford.edu> Good Morning All, Ted is out today. Looking good this morning. LTO is down for pull and clean. Thermco poly1 under observation. SEM hitachi has some display issues. No other issues at this time. Date: 7/9/08 THICKNESS-Change at Tube Name/Number *Status* * * * * * * * * Tylan 1 *up* * * * * * * * * Tylan 2 *up* * * * * * * * * Tylan 3 *up* * * * * * * * * Tylan 4 *up* * * * * * * * * Tylan 5-BBr3 *up* * * * * * * * * Tylan 6-POCl3 *up* * * * * * * * * Tylan 7-TEOS2 *up* * * *11.96/30* * * * * Tylan 8-SiGe *up* * * *16.97/30* * * * * Tylan 9-Poly *up* * * *29.07/30* * * * * Tylan 10-Nitride *yellow* *pressure high* *28.62/30* * * * * Tylan 11-LTO *Red* *pull and clean * *0/30* * * * * Tylan 12-FGA *up* *Pull and clean completed* * * * * * * Thermco 1 *up* * * * * * * * * Thermco 2 *up* * * * * * * * * Thermco 3 *future* * * * * * * * * Thermco4 *future* * * * * * * * * Thermco Poly1 *yellow* *observation* * * * * * * Thermco Poly2 *up* * * * * * * * * Thermco Nitride1 *up* * * * * * * * * Thermco Nitride2 *future* * * * * * * * * TEL Spa *up* * * * * * * * * Burn Box *up* * * * * * * * * Ebeam *up* * * * * * * * * ZYGO *up* * * * * * * * * FGA2 *yellow* *broken pull rod again!!* * * * * * * SiH4 for furnaces * * *a on line 430 psi* * changeover working well * * * * * -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Thu Jul 10 07:31:22 2008 From: tberg at stanford.edu (Ted Berg) Date: Thu, 10 Jul 2008 07:31:22 -0700 Subject: Diffusion Morning Report 07/10/08 Message-ID: <48761D3A.1060005@stanford.edu> Good Morning All, Looking OK this morning. Tylan LTO coming up after pull and clean. Tylan Nitride having pumping issues.Both SEMs have issues-FS coming in tomorrow. Thermco Poly observation. No other issues at this time. Date: 7/10/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 11.96/30 Tylan 8-SiGe up 17.41/30 Tylan 9-Poly up 27.22/30 Tylan 10-Nitride down pumping issues 28.68/30 Tylan 11-LTO down pull and clean 0/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam up ZYGO up FGA2 up SiH4 for furnaces a on line 430 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Fri Jul 11 06:15:31 2008 From: tberg at stanford.edu (Ted Berg) Date: Fri, 11 Jul 2008 06:15:31 -0700 Subject: Diffusion Morning Report 07/11/08 Message-ID: <48775CF3.5040206@stanford.edu> Good Morning All, Looking good this morning. LTO is back up after pull and clean has a slight door issue. Tylan Nitride is undergoing pull and clean. Burn box cleaned this morning. Tel had low cooling water issues. probably from yesterday's work No other issues at this time. Date: 7/10/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 11.96/30 Tylan 8-SiGe up 17.41/30 Tylan 9-Poly up 27.22/30 Tylan 10-Nitride down pull and clean 0/30 Tylan 11-LTO yellow door issue 0/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa yellow cooling water low Burn Box up cleaned this morning Ebeam up ZYGO up FGA2 up SiH4 for furnaces a on line 380 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Mon Jul 14 08:19:25 2008 From: tberg at stanford.edu (Ted Berg) Date: Mon, 14 Jul 2008 08:19:25 -0700 Subject: Diffusion Morning Report 07/14/08 Message-ID: <487B6E7D.5040504@stanford.edu> Good Morning All, Looking OK this morning. Most everything is recovered after power glitch. LTO doesn't appear to pump below 330mT. Nitride is still going back together after pull and clean. Thermco Poly2-restarted pimp back in stbypoly. 4160 SEM not addressed by FS they will be back soon. No other issues at this time. > > Date: 7/14/08 THICKNESS-Change at > Tube Name/Number Status > Tylan 1 up > Tylan 2 up > Tylan 3 up > Tylan 4 up > Tylan 5-BBr3 up > Tylan 6-POCl3 up > Tylan 7-TEOS2 up 11.96/30 > Tylan 8-SiGe up 17.41/30 > Tylan 9-Poly up 29.26/30 > Tylan 10-Nitride down pull and clean 0/30 > Tylan 11-LTO down won't pump below 330 mT 1.12/30 > Tylan 12-FGA up > Thermco 1 up > Thermco 2 up > Thermco 3 future > Thermco4 future > Thermco Poly1 yellow observation > Thermco Poly2 up > Thermco Nitride1 up > Thermco Nitride2 future > TEL Spa up > Burn Box up > Ebeam up > ZYGO up > FGA2 up > SiH4 for furnaces a on line 380 psi changeover working well > -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Tue Jul 15 06:25:07 2008 From: tberg at stanford.edu (Ted Berg) Date: Tue, 15 Jul 2008 06:25:07 -0700 Subject: Diffusion Morning Report 07/15/08 Message-ID: <487CA533.6070606@stanford.edu> Good Morning All, Looking OK today. LTO has had the pump changed and it has a broken tube. needs a test . Thermco poly 1 under observation. Thermco Poly 2 needs more characterization. FS is supposed to be here for 4160 SEM today or tomorrow. FGA has a broken pull rod again!!. No other issueas at this time. Date: 7/15/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 11.97/30 Tylan 8-SiGe up 17.41/30 Tylan 9-Poly up 29.57/30 Tylan 10-Nitride yellow needs test 0/30 Tylan 11-LTO down broken tube 1.12/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam up ZYGO up FGA2 yellow Broken pull rod Again!!! SiH4 for furnaces a on line 375 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From hubby0mawr at f-convex.com Tue Jul 15 14:17:46 2008 From: hubby0mawr at f-convex.com (Simon dumbbell) Date: Tue, 15 Jul 2008 18:17:46 -0300 Subject: Medical Doctor Database in America Message-ID: <062263c1yom0$g9354ao0$4027r8b0@Delldim5150 Currently Practicing Medical Doctors in the United States 788,181 in total <> 17,818 emails Many popular specialties like Emergency Medicine, Plastic Surgery, OBGYN, Oncology, Pediatrics and more Sort by over a dozen different fields Reduced to only: $396 ()()() Take all 4 items below for F REE when you order ()()() --> Contact List of US Pharma Companies Personal email addresses (47,000 in total) and names for top level executives --> Hospitals in the USA complete contact information for CEO's, CFO's, Directors and more - over 23,000 listings in total for more than 7,000 hospitals in the USA --> US Dentist Contact List More than half a million listings [worth $499 alone!] --> American Chiropractors List 100,000 Chiropractors in the USA (worth $250 alone) reply to: russell.levy_md at hotmail.com above expires on July 18 to get off our list please send an email with 51829 in the subject From rseymour at stanford.edu Wed Jul 16 07:48:28 2008 From: rseymour at stanford.edu (Ray Seymour) Date: Wed, 16 Jul 2008 07:48:28 -0700 Subject: Diffusion Morning Report Message-ID: <487E0A3C.6070400@stanford.edu> Morning All, Ted is out today. Poly is going down for a pull and clean. BPSG has a door issue. Nitride pump was off yesterday, will check operation during the day. All else looking good. Date: 7/16/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up * * * * * * Tylan 2 up * * * * * * Tylan 3 up * * * * * * Tylan 4 up * * * * * * Tylan 5-BBr3 up * * * * * * Tylan 6-POCl3 up * * * * * * Tylan 7-TEOS2 up * * *11.97/30* * * Tylan 8-SiGe up * * *17.41/30* * * Tylan 9-Poly up * * *29.57/30* * * Tylan 10-Nitride yellow *needs test* *0/30* * * Tylan 11-LTO down * * *1.12/30* * * Tylan 12-FGA up * * * * * * Thermco 1 up * * * * * * Thermco 2 up * * * * * * Thermco 3 future * * * * * * Thermco4 future * * * * * * Thermco Poly1 yellow *observation* * * * * Thermco Poly2 up * * * * * * Thermco Nitride1 up * * * * * * Thermco Nitride2 future * * * * * * TEL Spa up * * * * * * Burn Box up * * * * * * Ebeam up * * * * * * ZYGO up * * * * * * FGA2 yellow *Broken pull rod Again!!!* * * * * SiH4 for furnaces *a on line 375 psi* * changeover working well * * * -------------- next part -------------- An HTML attachment was scrubbed... URL: From rseymour at stanford.edu Thu Jul 17 08:02:55 2008 From: rseymour at stanford.edu (Ray Seymour) Date: Thu, 17 Jul 2008 08:02:55 -0700 Subject: Diffusion Morning Report Message-ID: <487F5F1F.7010607@stanford.edu> Good Morning All, Ted is out today. Furnace tube1 had MFS alarm, zeroed MFC and did auto zero routine. Tube 3 has a sticking loader. Mike adjusted loader on Tylan Nitride. Tylan Poly being reassembled after tube pull and clean. All else looking good this morning. Date: 7/17/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up * * * * * * Tylan 2 up * * * * * * Tylan 3 Yellow * Loader sticking * * * * * Tylan 4 up * * * * * * Tylan 5-BBr3 up * * * * * * Tylan 6-POCl3 up * * * * * * Tylan 7-TEOS2 up * * *11.97/30* * * Tylan 8-SiGe up * * *17.41/30* * * Tylan 9-Poly up * * *0/30* * * Tylan 10-Nitride yellow *needs test* *0/30* * * Tylan 11-LTO down * * *4.4/30* * * Tylan 12-FGA up * * * * * * Thermco 1 up * * * * * * Thermco 2 up * * * * * * Thermco 3 future * * * * * * Thermco4 future * * * * * * Thermco Poly1 yellow *observation* * * * * Thermco Poly2 up * * * * * * Thermco Nitride1 up * * * * * * Thermco Nitride2 future * * * * * * TEL Spa up * * * * * * Burn Box up * * * * * * Ebeam up * * * * * * ZYGO up * * * * * * FGA2 yellow *Broken pull rod Again!!!* * * * * SiH4 for furnaces *a on line 360 psi* * changeover working well * * * -------------- next part -------------- An HTML attachment was scrubbed... URL: From rseymour at stanford.edu Fri Jul 18 07:50:49 2008 From: rseymour at stanford.edu (Ray Seymour) Date: Fri, 18 Jul 2008 07:50:49 -0700 Subject: Diffusion Morning Report Message-ID: <4880ADC9.3090007@stanford.edu> Good Morning All, Ted is out today. Tube 3 has a sticking loader. Tylan Poly being reassembled after tube pull and clean. Burnbox cleaned this morning All else looking good this morning. Date: 7/18/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up * * * * * * Tylan 2 up * * * * * * Tylan 3 Yellow * Loader sticking * * * * * Tylan 4 up * * * * * * Tylan 5-BBr3 up * * * * * * Tylan 6-POCl3 up * * * * * * Tylan 7-TEOS2 up * * *11.97/30* * * Tylan 8-SiGe up * * *17.75/30* * * Tylan 9-Poly up * * *0/30* * * Tylan 10-Nitride yellow *needs test* *0/30* * * Tylan 11-LTO up * * *6.3/30* * * Tylan 12-FGA up * * * * * * Thermco 1 up * * * * * * Thermco 2 up * * * * * * Thermco 3 future * * * * * * Thermco4 future * * * * * * Thermco Poly1 yellow *observation* * * * * Thermco Poly2 up * * * * * * Thermco Nitride1 up * * * * * * Thermco Nitride2 future * * * * * * TEL Spa up * * * * * * Burn Box up * Cleaned this Morning * * * * * Ebeam up * * * * * * ZYGO up * * * * * * FGA2 yellow *Broken pull rod Again!!!* * * * * SiH4 for furnaces *a on line 360 psi* * changeover working well * * * -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Mon Jul 21 07:47:52 2008 From: tberg at stanford.edu (Ted Berg) Date: Mon, 21 Jul 2008 07:47:52 -0700 Subject: Diffusion Morning Report 07/21/08 Message-ID: <4884A198.6070301@stanford.edu> Good Morning All, Looking OK this morning. LTO is down for retrofit. Tylan oxides have several issues doors and MFS. Tylan poly is back together and functional dep rate a bit low. Tylan Nitride is down for a gate valve leak. Ebeam is back in high vac and beam current is coming up. No other issues at this time. Date: 7/14/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 down mfs alarms Tylan 2 up Tylan 3 yellow door and mfs issues Tylan 4 yellow door seals bad Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 11.96/30 Tylan 8-SiGe up 17.41/30 Tylan 9-Poly yellow Dep rate a bit low .3/30 Tylan 10-Nitride down gate valve leak 0/30 Tylan 11-LTO down upgrade 8.05/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam up ZYGO up FGA2 up SiH4 for furnaces a on line 380 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Tue Jul 22 06:09:11 2008 From: tberg at stanford.edu (Ted Berg) Date: Tue, 22 Jul 2008 06:09:11 -0700 Subject: Diffusion Morning Report 07/22/08 Message-ID: <4885DBF7.1000008@stanford.edu> Good Morning All, Looking good this morning. Lots of issues resolved yesterday. LTO retro moving ahead well. Tylan 3 door issues addressed observing Thermco poly 1 observing. No other issues at this time. Date: 7/22/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 yellow door and mfs issues Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 11.97/30 Tylan 8-SiGe up 18.87/30 Tylan 9-Poly up .3/30 Tylan 10-Nitride up gate valve rebuilt 0/30 Tylan 11-LTO down upgrade 8.05/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam up ZYGO up FGA2 up SiH4 for furnaces a on line 340 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From roommate at internetinfocenter.net Wed Jul 23 02:49:41 2008 From: roommate at internetinfocenter.net (auburn) Date: Wed, 23 Jul 2008 11:49:41 +0200 Subject: Physician Contact List in America Message-ID: <263239v0llh0$l9518gx0$3131y0b0@Delldim5150 Here's what we're offering for this week: Currently in Practice: Physicians in the United States 788,965 in total * 17,152 emails Coverage in many different areas of medicine such as Endocrinology, Pathology, Urology, Neurology, Plastic Surgery, Psychiatry, Cardiology and much more Sort by over a dozen different fields US Pharmaceutical Company Executives Directory Personal email addresses (47,000 in total) and names for top level executives Hospital Facilities in the United States Full data for all the major positions in more than 7k facilities Dentists in America More than half a million listings [worth $499 alone!] US Chiropractor Database Over than 100k chiropractors practicing in the USA Price for this week only = $392 for all 5 datasets reply to: juana.glassheim_dr at hotmail.com this offer is only valid until July 26 2008 From tberg at stanford.edu Wed Jul 23 06:19:39 2008 From: tberg at stanford.edu (Ted Berg) Date: Wed, 23 Jul 2008 06:19:39 -0700 Subject: Diffusion Morning Report 07/23/08 Message-ID: <48872FEB.3080905@stanford.edu> Good Morning All, Looking good this morning. LTO retro is moving ahead. Tylan Nitride is having door and pump issues. TEOS had flow issues. Thermco Poly1 observation for boat issues. No other problems at this time. Date: 7/23/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 yellow flow issues 11.97/30 Tylan 8-SiGe up 18.87/30 Tylan 9-Poly up 2.61/30 Tylan 10-Nitride down pumping and door issues 0/30 Tylan 11-LTO down upgrade 8.05/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam up ZYGO up FGA2 up SiH4 for furnaces a on line 340 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Thu Jul 24 06:14:35 2008 From: tberg at stanford.edu (Ted Berg) Date: Thu, 24 Jul 2008 06:14:35 -0700 Subject: Diffusion Morning Report 07/24/08 Message-ID: <4888803B.9000003@stanford.edu> Good Morning All, Looking good this morning. LTO retro is moving ahead well. Nitride failed leak check. TEOS had flow issues and SiGe had MFS errors. Ebeam had transfer issues. Thermco poly under observation for Boat. No other issues at this time. Date: 7/24/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 yellow flow issues 11.97/30 Tylan 8-SiGe yellow mfs issues 18.87/30 Tylan 9-Poly up 2.61/30 Tylan 10-Nitride yellow failed leak check 0/30 Tylan 11-LTO down upgrade 8.05/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam down transfer issues ZYGO up FGA2 up SiH4 for furnaces a on line 340 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Fri Jul 25 06:23:13 2008 From: tberg at stanford.edu (Ted Berg) Date: Fri, 25 Jul 2008 06:23:13 -0700 Subject: Diffusion Morning Report 07/25/08 Message-ID: <4889D3C1.4080106@stanford.edu> Good Morning All, Looking good this morning. LTO hardware in and tested with N2 waiting for more testing. Nitride has door issues. Thermco poly1 under observation. No other issues at this time. > > Date: 7/25/08 THICKNESS-Change at > Tube Name/Number Status > Tylan 1 up > Tylan 2 up > Tylan 3 up > Tylan 4 up > Tylan 5-BBr3 up > Tylan 6-POCl3 up > Tylan 7-TEOS2 up 12.94/30 > Tylan 8-SiGe up 18.87/30 > Tylan 9-Poly up 2.61/30 > Tylan 10-Nitride down failed leak check door issues 0/30 > Tylan 11-LTO down upgrade 8.05/30 > Tylan 12-FGA up > Thermco 1 up > Thermco 2 up > Thermco 3 future > Thermco4 future > Thermco Poly1 yellow observation > Thermco Poly2 up > Thermco Nitride1 up > Thermco Nitride2 future > TEL Spa up > Burn Box up > Ebeam up > ZYGO up > FGA2 up > SiH4 for furnaces a on line 340 psi changeover working well > -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Mon Jul 28 06:34:39 2008 From: tberg at stanford.edu (Ted Berg) Date: Mon, 28 Jul 2008 06:34:39 -0700 Subject: Diffusion Morning Report 07/28/08 Message-ID: <488DCAEF.707@stanford.edu> Good Morning All, Looking good this morning. LTO hardware completed waiting testing. Tylan Nitride is yellow waiting testing after repair. Ebeam is yellow possible computer issues. Thermco poly1 observation. No other issues at this time. Date: 7/28/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 13.19/30 Tylan 8-SiGe up 19.55/30 Tylan 9-Poly up 2.61/30 Tylan 10-Nitride yellow needs test 0/30 Tylan 11-LTO down upgrade 8.05/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 yellow observation Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam yellow Computer issues? ZYGO up FGA2 up SiH4 for furnaces a on line 340 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Tue Jul 29 06:32:34 2008 From: tberg at stanford.edu (Ted Berg) Date: Tue, 29 Jul 2008 06:32:34 -0700 Subject: diffusion Morning report 07/29/08 Message-ID: <488F1BF2.7050002@stanford.edu> Good Morning All, Looking good this morning. LTO hardware is completed waiting testing. Nitride tube would'nt open. Poly had small b in source. No other problems at this time. Date: 7/29/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 13.19/30 Tylan 8-SiGe up 19.55/30 Tylan 9-Poly yellow small b on source 2.89/30 Tylan 10-Nitride yellow needs test-won't open 0/30 Tylan 11-LTO down upgrade completed needs testing/characterization 8.05/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 up Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam ui ZYGO up FGA2 up SiH4 for furnaces a on line 280 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From tberg at stanford.edu Wed Jul 30 06:15:03 2008 From: tberg at stanford.edu (Ted Berg) Date: Wed, 30 Jul 2008 06:15:03 -0700 Subject: Diffusion Morning Report 07/29/08 Message-ID: <48906957.6010301@stanford.edu> Good Morning All, Looking good this morning. LTO in test mode. Hitachi FS will be here today to begin PM on ebeam. Nitride is yellow waiting results. No other issues at this time. Date: 7/30/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 up Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 13.19/30 Tylan 8-SiGe up 19.55/30 Tylan 9-Poly u 3.19/30 Tylan 10-Nitride yellow needs test-won't open 0/30 Tylan 11-LTO down upgrade completed needs testing/characterization 8.05/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 up Thermco Poly2 up Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam ui ZYGO up FGA2 up SiH4 for furnaces a on line 280 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: From Carrollyyjgbjltqdl at augustoolivera.com Wed Jul 30 20:09:56 2008 From: Carrollyyjgbjltqdl at augustoolivera.com (Walker thompson) Date: Thu, 31 Jul 2008 06:09:56 +0300 Subject: Listing of emergency medicine physicians and much more Message-ID: <679511f7vdi0$i7884iu0$7719w7z0@Delldim5150 The package below is valued at over $2000 when purchased individually Currently in Practice: Physicians in the US 788,793 in total * 17,996 emails Featuring coverage for more than 30 specialties like Internal Medicine, Family Practice, Opthalmology, Anesthesiologists, Cardiologists and more Sort by over a dozen different fields Pharmaceutical Companies in the United States 47,000 names and emails of the major positions American Hospitals Complete contact information for the important jobs held at the hospitals US Dentist Contact List Virtually every dentist in the US with full contact details Chiropractors in the USA Complete data for all chiropractors in the United States (a $250 value) Dramatic cost reduction: $395 for all 5 datasets reply by email: alan.james_miller.dr at hotmail.com good until August 08 From tberg at stanford.edu Thu Jul 31 06:13:47 2008 From: tberg at stanford.edu (Ted Berg) Date: Thu, 31 Jul 2008 06:13:47 -0700 Subject: Diffusion Morning Report 07/31/08 Message-ID: <4891BA8B.3040506@stanford.edu> Good Morning All, Looking OK this morning LTO testing. Ebeam down for annual PM. Tylan Nitride still having door issues. Tylan 1 MFS alarms. Thermco Poly 2 pump stopped. No other issues at this time. Date: 7/30/08 THICKNESS-Change at Tube Name/Number Status Tylan 1 yellow mfs n2 leak alarm Tylan 2 up Tylan 3 up Tylan 4 up Tylan 5-BBr3 up Tylan 6-POCl3 up Tylan 7-TEOS2 up 13.19/30 Tylan 8-SiGe up 19.55/30 Tylan 9-Poly u 3.24/30 Tylan 10-Nitride yellow door issues again 0/30 Tylan 11-LTO down upgrade completed needs testing/characterization 8.05/30 Tylan 12-FGA up Thermco 1 up Thermco 2 up Thermco 3 future Thermco4 future Thermco Poly1 up Thermco Poly2 down pump off Thermco Nitride1 up Thermco Nitride2 future TEL Spa up Burn Box up Ebeam down Annual PM ZYGO up FGA2 up SiH4 for furnaces a on line 280 psi changeover working well -------------- next part -------------- An HTML attachment was scrubbed... URL: