Good Morning All,
Looking OK this morning. The monitor for Thermco bank 1 is dead so
the bank is down. Ebeam still looking for the beam. Nitride has MFS
alarms. Probably going to take the monitor from THermco bank 2 for bank
1 since bank 2 is a one man show. No other issues at this time.
Date: 9/29/08 THICKNESS-Change at
Tube Name/Number Status
Tylan 1 up
Tylan 2 up
Tylan 3 up
Tylan 4 up
Tylan 5-BBr3 up
Tylan 6-POCl3 up
Tylan 7-TEOS2 up 18.16/30
Tylan 8-SiGe up 25.93/30
Tylan 9-Poly up 1.63/30
Tylan 10-Nitride yellow mfs alarms 2.39/30
Tylan 11-LTO up test good 4.13/30
Tylan 12-FGA up
Thermco 1 down monitor bad
Thermco 2 down monitor bad
Thermco 3 future
Thermco4 future
Thermco Poly1 down monitor bad
Thermco Poly2 yellow non uniformity
Thermco Nitride1 down monitor bad
Thermco Nitride2 future
TEL Spa up
Burn Box up
Ebeam down looking for beam
ZYGO up
FGA2 up
SiH4 for furnaces B on line 650 psi changeover working well
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20080929/39b65008/attachment.html>
More information about the diffusion
mailing list