Diffusion Morning Report 12/15/09

Ted Berg tberg at stanford.edu
Tue Dec 15 07:21:14 PST 2009


Good Morning All,
    Looking good this morning.TEOS tube change. Thermco Nitride and LTO 
-process testing. Ebeam still has computer issues. Thermco 1 had torch 
issues-checked lamps OK.. No other issues at this time.

  	  	  	  	  	 
  	Date: 	12/15/09 	THICKNESS-Change at 	  	 
Tube Name/Number 	Status 	  	  	  	 
Tylan 1 	up 	  	  	  	 
Tylan 2 	up 	  	  	  	 
Tylan 3 	up 	  	  	  	 
Tylan 4 	up 	  	  	  	 
Tylan 5-BBr3 	up 	  	  	  	 
Tylan 6-POCl3 	up 	  	  	  	 
Tylan 7-TEOS2 	down 	tube change 	0/30 	  	 
Tylan 8-SiGe 	up 	  	7.45/30 	  	 
Tylan 9-Poly 	up 	  	4.84/30 	  	 
Tylan 10-Nitride 	up 	  	20.3/30 	  	 
Tylan 11-LTO 	up 	  	15.11/30 	  	 
Tylan 12-FGA 	up 	  	  	  	 
Thermco 1 	up 	  	  	  	 
Thermco 2 	up 	  	  	  	 
Thermco 3 	future 	  	  	  	 
Thermco4 	future 	  	  	  	 
Thermco Poly1 	up 	  	  	  	 
Thermco Poly2 	up 	  	  	  	 
Thermco Nitride1 	yellow 	uniformity issues ? 	  	  	 
Thermco bpsg 	future 	testing for qual 	  	  	 
TEL Spa 	up 	  	  	  	 
Burn Box 	up 	  	   	  	 
Ebeam 	yellow 	computer issues 	  	  	 
ZYGO 	up 	  	  	  	 
FGA2 	up 	  	  	  	 
SiH4 for furnaces 	  	A on line 520 psi 	 changeover working well  	  	 


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20091215/2c9a8c98/attachment.html>


More information about the diffusion mailing list