Diffusion Morning Report 02/27/09

Ted Berg tberg at stanford.edu
Fri Feb 27 06:17:00 PST 2009


Good Morning All,
    Looking good this morning. TEOS pump is back and installing. GEh4 
cylinder is changed and underleak check. Nitride needs a test No other 
issues at this time.

  	  	  	  	  	 
  	Date: 	2/27/09 	THICKNESS-Change at 	  	 
Tube Name/Number 	Status 	  	  	  	 
Tylan 1 	up 	  	  	  	 
Tylan 2 	up 	  	  	  	 
Tylan 3 	up 	  	  	  	 
Tylan 4 	up 	  	  	  	 
Tylan 5-BBr3 	up 	  	  	  	 
Tylan 6-POCl3 	up 	  	  	  	 
Tylan 7-TEOS2 	down 	Pump back installing 	0/30 	  	 
Tylan 8-SiGe 	yellow 	mfs alarms 	3.8/30 	  	 
Tylan 9-Poly 	up 	  	.29/30 	  	 
Tylan 10-Nitride 	down 	pumping  issues 	2.34/30 	  	 
Tylan 11-LTO 	up 	  	28.16/30 	  	 
Tylan 12-FGA 	up 	  	  	  	 
Thermco 1 	up 	  	  	  	 
Thermco 2 	up 	  	  	  	 
Thermco 3 	future 	  	  	  	 
Thermco4 	future 	  	  	  	 
Thermco Poly1 	up 	  	  	  	 
Thermco Poly2 	up 	  	  	  	 
Thermco Nitride1 	up 	  	  	  	 
Thermco Nitride2 	future 	  	  	  	 
TEL Spa 	up 	  	  	  	 
Burn Box 	up 	  	   	  	 
Ebeam 	up 	  	  	  	 
ZYGO 	up 	  	  	  	 
FGA2 	up 	  	  	  	 
SiH4 for furnaces 	  	A on line 700 psi 	 changeover working well  	  	 


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20090227/eb0a9e12/attachment.html>


More information about the diffusion mailing list