Diffusion Morning Report 12/10/10

Ted Berg tberg at stanford.edu
Fri Dec 10 06:17:59 PST 2010


Good Morning All,
     Looking good this morning. Thermco Poly 1 is back together and 
coated, needs a test. Epi is down for over pressure issues. Tylan LTO 
had mfs issues. Tylan 1 mfs display is bad but working OK. Ebeam still 
has issues. No other problems at this time.

					
	Date: 	12/10/10 	THICKNESS-Change at 		Priority
Tube Name/Number 	Status 				
Tylan 1 	*yellow* 	*mfs 460 display is gone but flows are OK* 	** 	** 	*4*
Tylan 2 	*up* 	** 	** 	** 	**
Tylan 3 	*up* 	** 	** 	** 	**
Tylan 4 	*up* 	** 	** 	** 	**
Tylan 5-BBr3 	*up* 	** 	** 	** 	**
Tylan 6-POCl3 	*up* 	** 	** 	** 	**
Tylan 7-TEOS2 	*up* 	** 	*.25/30* 	** 	**
Tylan 8-SiGe 	*up* 	** 	*20.1/30* 	** 	**
Tylan 9-Poly 	*up* 	** 	*27.15/30* 	** 	**
Tylan 10-Nitride 	*up* 	** 	*19.99/30* 	** 	**
Tylan 11-LTO 	*yellow* 	*mfs alarms* 	*13.97/30* 	** 	*3*
Tylan 12-FGA 	*up* 	*
* 	** 	** 	**
Thermco 1 	*up* 	** 	** 	** 	**
Thermco 2 	*up* 	** 	** 	** 	**
Thermco 3 	*future* 	** 	** 	** 	**
Thermco4 	*future* 	** 	** 	** 	**
Thermco Poly1 	*down* 	*needs test after rebuild* 	** 	** 	*1*
Thermco Poly2 	*up* 	** 	** 	** 	**
Thermco Nitride1 	*down* 	*waiting TC* 	** 	** 	**
Thermco bpsg 	*yellow* 	*testing* 	** 	** 	**
AMAT Epi 	*down* 	*over pressure* 	** 	** 	*2*
TEL Spa 	*up* 	*
* 	** 	** 	**
Burn Box 	*up* 	** 	** 	** 	**
Ebeam 	*down* 	*computer issues* 	** 	** 	*5*
ZYGO 	*up* 	*
* 	** 	** 	**
FGA2 	*up* 	** 	** 	** 	**
SiH4 for furnaces 	** 	*A on line 513 PSI* 	*changeover working 
well* 	** 	**


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20101210/11ed1594/attachment.html>


More information about the diffusion mailing list