Good Morning All,
    Looking OK this morning. Most stuff is back up  Still waiting test 
results for several LPs . Thermco LPs down for burn box work. Ebeam 
still has computer issues. No othe major issues at this time.

  	  	  	  	  	 
  	Date: 	1/5/10 	THICKNESS-Change at 	  	 
Tube Name/Number 	Status 	  	  	  	 
Tylan 1 	up 	  	  	  	 
Tylan 2 	up 	  	  	  	 
Tylan 3 	up 	  	  	  	 
Tylan 4 	up 	  	  	  	 
Tylan 5-BBr3 	up 	  	  	  	 
Tylan 6-POCl3 	up 	  	  	  	 
Tylan 7-TEOS2 	down 	tube change 	0/30 	  	 
Tylan 8-SiGe 	up 	  	7.45/30 	  	 
Tylan 9-Poly 	up 	  	4.84/30 	  	 
Tylan 10-Nitride 	down 	Waiting test results 	20.3/30 	  	 
Tylan 11-LTO 	down 	Waiting test results 	16.11/30 	  	 
Tylan 12-FGA 	up 	  	  	  	 
Thermco 1 	up 	  	  	  	 
Thermco 2 	up 	  	  	  	 
Thermco 3 	future 	  	  	  	 
Thermco4 	future 	  	  	  	 
Thermco Poly1 	down 	Burn box 	  	  	 
Thermco Poly2 	down 	Burn box 	  	  	 
Thermco Nitride1 	yellow 	uniformity issues ? 	  	  	 
Thermco bpsg 	future 	testing for qual 	  	  	 
TEL Spa 	up 	  	  	  	 
Burn Box 	up 	  	   	  	 
Ebeam 	yellow 	computer issues 	  	  	 
ZYGO 	up 	  	  	  	 
FGA2 	up 	  	  	  	 
SiH4 for furnaces 	  	A on line 520 psi 	 changeover working well  	  	 


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20100105/0b07ab8b/attachment.html>


More information about the diffusion mailing list