Diffusion Morning Report 01/22/2010
Ted Berg
tberg at stanford.edu
Fri Jan 22 06:32:22 PST 2010
Good Morning All,
Looking good this morning. Several LPs still need tests after power
fail. Burn box clean this morning. Thermco LTO testing.Ebeam Comm issue
resolved. No other issues at this time
Date: 1/22/10 THICKNESS-Change at
Tube Name/Number Status
Tylan 1 up
Tylan 2 up
Tylan 3 up
Tylan 4 up
Tylan 5-BBr3 up
Tylan 6-POCl3 up
Tylan 7-TEOS2 up .257/30
Tylan 8-SiGe yellow needs test 7.45/30
Tylan 9-Poly up 4.81/30
Tylan 10-Nitride up 25.8/30
Tylan 11-LTO up 25.86/30
Tylan 12-FGA up
Thermco 1 up
Thermco 2 up
Thermco 3 future
Thermco4 future
Thermco Poly1 yellow needs test
Thermco Poly2 yellow needs test
Thermco Nitride1 yellow uniformity issues ?
Thermco bpsg future testing for qual
TEL Spa up
Burn Box up
Ebeam yellow
ZYGO up
FGA2 up
SiH4 for furnaces A on line 455 psi changeover working well
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20100122/4b292045/attachment.html>
More information about the diffusion
mailing list