Diffusion Morning Report 04/01/11

Ted Berg tberg at stanford.edu
Fri Apr 1 06:16:01 PDT 2011


Good Morning All,
     Looking good this morning(no fooling). TEOS is ready for a test. 
Tylan Poly down for pull and clean. Thermco BPSG needs a test. Thermco 2 
No TLC flow. PO for SEM PM is in purchasing. No otherissues at this time.

					
	Date: 	4/1/11 	THICKNESS-Change at 		Priority
Tube Name/Number 	Status 				
Tylan 1 	*up* 	** 	** 	** 	**
Tylan 2 	*up* 	** 	** 	** 	**
Tylan 3 	*up* 	** 	** 	** 	**
Tylan 4 	*up* 	** 	** 	** 	**
Tylan 5-BBr3 	*up* 	** 	** 	** 	**
Tylan 6-POCl3 	*up* 	** 	** 	** 	**
Tylan 7-TEOS2 	*yellow* 	*needs test after repairs* 	*.25/30* 	** 	**
Tylan 8-SiGe 	*up* 	** 	*.88/30* 	** 	**
Tylan 9-Poly 	*down* 	*pull and clean* 	*0/30* 	** 	*1*
Tylan 10-Nitride 	*up* 	** 	*9.85/30* 	** 	**
Tylan 11-LTO 	*yellow* 	** 	*4.58/30* 	** 	**
Tylan 12-FGA 	*up* 	** 	** 	** 	**
Thermco 1 	*up* 	** 	** 	** 	**
Thermco 2 	*yellow* 	*no tlc flow* 	** 	** 	**
Thermco 3 	*future* 	** 	** 	** 	**
Thermco4 	*future* 	** 	** 	** 	**
Thermco Poly1 	*up* 	** 	** 	** 	**
Thermco Poly2 	*up* 	** 	** 	** 	**
Thermco Nitride1 	*up* 	** 	** 	** 	**
Thermco bpsg 	*yellow* 	*needs test after repair* 	** 	** 	**
AMAT Epi 	*yellow* 	*running* 	** 	** 	**
TEL Spa 	*up* 	** 	** 	** 	**
Burn Box 	*up* 	** 	** 	** 	**
Ebeam 	*down* 	*cryo compresssor dead* 	** 	** 	**
ZYGO 	*up* 	*
* 	** 	** 	**
FGA2 	*up* 	** 	** 	** 	**
SiH4 for furnaces 	** 	*A on line 600 PSI* 	*changeover working 
well* 	** 	**


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://snf.stanford.edu/pipermail/diffusion/attachments/20110401/dea4c688/attachment.html>


More information about the diffusion mailing list